Geothermal probabilistic cost study (open access)

Geothermal probabilistic cost study

A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)
Date: August 1, 1981
Creator: Orren, Lowell H.; Ziman, G. Michael; Jones, Sue C.; Lee, Tom K.; Noll, Roger; Wilde, Louis et al.
System: The UNT Digital Library