Impact of Green Design and Technology on Building Environment (open access)

Impact of Green Design and Technology on Building Environment

Currently, the public has a strong sense of the need for environment protection and the use of sustainable, or “green,” design in buildings and other civil structures. Since green design elements and technologies are different from traditional design, they probably have impacts on the building environment, such as vibration, lighting, noise, temperature, relative humidity, and overall comfort. Determining these impacts of green design on building environments is the primary objective of this study. The Zero Energy Research (ZOE) laboratory, located at the University of North Texas Discovery Park, is analyzed as a case study. Because the ZOE lab is a building that combines various green design elements and energy efficient technologies, such as solar panels, a geothermal heating system, and wind turbines, it provides an ideal case to study. Through field measurements and a questionnaire survey of regular occupants of the ZOE lab, this thesis analyzed and reported: 1) whether green design elements changed the building’s ability to meet common building environmental standards, 2) whether green design elements assisted in Leadership in Energy and Environmental Design (LEED) scoring, and 3) whether green design elements decreased the subjective comfort level of the occupants.
Date: December 2015
Creator: Xiong, Liang
System: The UNT Digital Library
Guidelines for Greening (Renovation) of Existing Homes (open access)

Guidelines for Greening (Renovation) of Existing Homes

This Thesis is aimed at evaluating the options of renovation for an existing residential building to make it more energy efficient. The various aspects in the basic structures of residential homes are discussed in order to help the user identify the areas of the house for which renovation is required to improve the energy efficiency of the building. These aspects include doors, roof and wall in addition to various systems of electrical wiring, mechanical systems of ventilation, heating and cooling and plumbing systems for the efficient flow of water throughout the house. The renovation options have been described in detail to provide as many possibilities to the user as possible. The building taken for renovation is a 1953 suburban home which has been awarded the honor of being the first building to be labeled as Zero Energy Home in its vicinity. This has made the home so efficient that its expenditure of energy has become equivalent to its energy generation, therefore, cancelling each other out and creating an estimate of zero energy.
Date: December 2015
Creator: Shaikh, Gilman Yusuf
System: The UNT Digital Library
Laser Cutting Machine: Justification of initial costs (open access)

Laser Cutting Machine: Justification of initial costs

The Industrial Laser is firmly established in metalcutting as the tool of choice for many applications. The elevator division of Montgomery KONE Inc., in an effort to move towards quality, ontime, complete deliveries and 100% customer satisfaction, decided to invest in new equipment to improve manufacturing processes. A huge investment is proposed for a laser-cutting machine. It is the responsibility of Manufacturing Engineering to direct the management by justifying its benefits, which includes payback time and financial gains. Factors such as common line cutting, automated material handling system and cutting time were involved in justification of the initial cost of a laser-cutting machine. Comparative statistics on appropriate factors accurately determine and justify the initial cost of a laser-cutting machine.
Date: May 2001
Creator: Nagaraja, Dwarakish
System: The UNT Digital Library

Construction Management Methods and Techniques in Army Tactical Shelter

Access: Use of this item is restricted to the UNT Community
This thesis presents a research effort aimed at developing using construction methods and techniques in army tactical shelter. The beginning step focuses on developing and identifying different activities and work breakdown structure applicable in shelter prototype. The next step focuses on identifying resource allocation. This include allocate resources based on the delivered project as per alternative one and for the second alternative as optimization, resource allocation modified and tried to level and minimize resource peak. In addition, the cost calculated for the whole project as well as for each WBS and activities which consider as alternative one and in the second alternative, cost mitigation applied according to available resources and adjusting predecessors and successors of each activity. In conclusion, two alternatives compared, available outcome presents, and future work suggested for the project team to continue this effort.
Date: December 2019
Creator: Yeganehtalab, Babak
System: The UNT Digital Library