Resource Type

Development of alternative oxygen production source using a zirconia solid electrolyte membrane (open access)

Development of alternative oxygen production source using a zirconia solid electrolyte membrane

The objective of this multiyear effort was the development, fabrication and testing of a zirconia oxygen production module capable of delivering approximately 100 liters/minute (LPM) of oxygen. The work discussed in this report consists of development and improvement of the zirconia cell along with manufacture of cell components, preliminary design of the final plant, additional economic analysis and industrial participation. (VC)
Date: August 1, 1990
Creator: Suitor, J. W.; Clark, D. J. & Losey, R. W.
Object Type: Report
System: The UNT Digital Library
Development of alternative oxygen production source using a zirconia solid electrolyte membrane. Final report (open access)

Development of alternative oxygen production source using a zirconia solid electrolyte membrane. Final report

The objective of this multiyear effort was the development, fabrication and testing of a zirconia oxygen production module capable of delivering approximately 100 liters/minute (LPM) of oxygen. The work discussed in this report consists of development and improvement of the zirconia cell along with manufacture of cell components, preliminary design of the final plant, additional economic analysis and industrial participation. (VC)
Date: August 1, 1990
Creator: Suitor, J. W.; Clark, D. J. & Losey, R. W.
Object Type: Report
System: The UNT Digital Library
Effect of Exposure Site on Weather Resistance of Porcelain Enamels Exposed for Three Years (open access)

Effect of Exposure Site on Weather Resistance of Porcelain Enamels Exposed for Three Years

From Introduction: "The present report describes the condition of all of the porcelain enamels after exposure for 3 yr."
Date: April 10, 1962
Creator: Moore, Dwight G. & Potter, Alan
Object Type: Report
System: The UNT Digital Library

Col. William N. Selig: The Man Who Invented Hollywood

A book about Col. William N. Selig's career as an early cinematic pioneer and movie director and founder of the film industry that became Hollywood in Los Angeles.
Date: 2013
Creator: Erish, Andrew A.
Object Type: Book
System: The Portal to Texas History
Low-Cost Silicon Solar Array Project. Quarterly report 3, October 1976--December 1976 (open access)

Low-Cost Silicon Solar Array Project. Quarterly report 3, October 1976--December 1976

The potential for future widespread use of photovoltaic systems for the generation of electric power was the motivation for the establishment, in January 1975, of the Photovoltaic Conversion Program by ERDA's Division of Solar Energy. The Program's activities are planned to develop and to promote the use of photovoltaic systems to such an extent that the private sector will produce and utilize cost-competitive photovoltaic systems. As part of the ERDA Program, the Low-Cost Silicon Solar Array Project (LSSA) was established in January 1975. The activities and progress of the LSSA Project during the months of October, November, and December 1976 are described. The Project objective is to develop the national capability to produce low-cost, long-life photovoltaic arrays at a rate greater than 500 megawatts per year and a price of less than $500 per kilowatt peak by 1986. The array performance goals include an efficiency greater than 10% and an operating lifetime in excess of 20 years. The approach is to reduce the cost of solar cell arrays by improving solar array manufacturing technology and by increasing solar array production capacity and quantity. Forty-seven contracts have been awarded to date, to industrial firms and university and independent laboratories for experimental …
Date: January 1, 1976
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Advanced subsystems development. Second semi-annual progress report, April 1--October 1, 1978 (open access)

Advanced subsystems development. Second semi-annual progress report, April 1--October 1, 1978

The concept design for a small (less than 10 MWe) solar thermal electric generating plant was completed using projected 1985 technology. The systems requirements were defined and specified. The components, including an engineering prototype for one 15 kWe module of the generating plant, were conceptually designed. Significant features of the small solar thermal power plant were identified as the following: (1) 15-kWe Stirling-cycle engine/alternator with constant power output; (2) 10-meter point-focusing paraboloidal concentrator with cantilevered cellular glass reflecting panels; (3) primary heat pipe with 800/sup 0/C output solar cavity receiver; (4) secondary heat pipe with molten salt thermal energy storage unit; (5) electric energy transport system; and (6) advanced battery energy storage capability. The present emphasis for achieving cost reduction goals centers on improving conversion efficiency and reducing the cost of key components.
Date: November 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Helical Screw Expander Evaluation Project. Final report (open access)

Helical Screw Expander Evaluation Project. Final report

A functional 1-MW geothermal electric power plant that featured a helical screw expander was produced and then tested in Utah in 1978 to 1979 with a demonstrated average performance of approximately 45% machine efficiency over a wide range of test conditions in noncondensing operation on two-phase geothermal fluids. The Project also produced a computer-equipped data system, an instrumentation and control van, and a 1000-kW variable load bank, all integrated into a test array designed for operation at a variety of remote test sites. Additional testing was performed in Mexico in 1980 under a cooperative test program using the same test array, and machine efficiency was measured at 62% maximum with the rotors partially coated with scale, compared with approximately 54% maximum in Utah with uncoated rotors, confirming the importance of scale deposits within the machine on performance. Data are presented for the Utah testing and for the noncondensing phases of the testing in Mexico. Test time logged was 437 hours during the Utah tests and 1101 hours during the Mexico tests.
Date: March 1, 1982
Creator: McKay, R.
Object Type: Report
System: The UNT Digital Library