Development of alternative oxygen production source using a zirconia solid electrolyte membrane (open access)

Development of alternative oxygen production source using a zirconia solid electrolyte membrane

The objective of this multiyear effort was the development, fabrication and testing of a zirconia oxygen production module capable of delivering approximately 100 liters/minute (LPM) of oxygen. The work discussed in this report consists of development and improvement of the zirconia cell along with manufacture of cell components, preliminary design of the final plant, additional economic analysis and industrial participation. (VC)
Date: August 1, 1990
Creator: Suitor, J. W.; Clark, D. J. & Losey, R. W.
System: The UNT Digital Library
Development of alternative oxygen production source using a zirconia solid electrolyte membrane. Final report (open access)

Development of alternative oxygen production source using a zirconia solid electrolyte membrane. Final report

The objective of this multiyear effort was the development, fabrication and testing of a zirconia oxygen production module capable of delivering approximately 100 liters/minute (LPM) of oxygen. The work discussed in this report consists of development and improvement of the zirconia cell along with manufacture of cell components, preliminary design of the final plant, additional economic analysis and industrial participation. (VC)
Date: August 1, 1990
Creator: Suitor, J. W.; Clark, D. J. & Losey, R. W.
System: The UNT Digital Library
Low-Cost Silicon Solar Array Project. Quarterly report 3, October 1976--December 1976 (open access)

Low-Cost Silicon Solar Array Project. Quarterly report 3, October 1976--December 1976

The potential for future widespread use of photovoltaic systems for the generation of electric power was the motivation for the establishment, in January 1975, of the Photovoltaic Conversion Program by ERDA's Division of Solar Energy. The Program's activities are planned to develop and to promote the use of photovoltaic systems to such an extent that the private sector will produce and utilize cost-competitive photovoltaic systems. As part of the ERDA Program, the Low-Cost Silicon Solar Array Project (LSSA) was established in January 1975. The activities and progress of the LSSA Project during the months of October, November, and December 1976 are described. The Project objective is to develop the national capability to produce low-cost, long-life photovoltaic arrays at a rate greater than 500 megawatts per year and a price of less than $500 per kilowatt peak by 1986. The array performance goals include an efficiency greater than 10% and an operating lifetime in excess of 20 years. The approach is to reduce the cost of solar cell arrays by improving solar array manufacturing technology and by increasing solar array production capacity and quantity. Forty-seven contracts have been awarded to date, to industrial firms and university and independent laboratories for experimental …
Date: January 1, 1976
Creator: unknown
System: The UNT Digital Library
Helical Screw Expander Evaluation Project. Final report (open access)

Helical Screw Expander Evaluation Project. Final report

A functional 1-MW geothermal electric power plant that featured a helical screw expander was produced and then tested in Utah in 1978 to 1979 with a demonstrated average performance of approximately 45% machine efficiency over a wide range of test conditions in noncondensing operation on two-phase geothermal fluids. The Project also produced a computer-equipped data system, an instrumentation and control van, and a 1000-kW variable load bank, all integrated into a test array designed for operation at a variety of remote test sites. Additional testing was performed in Mexico in 1980 under a cooperative test program using the same test array, and machine efficiency was measured at 62% maximum with the rotors partially coated with scale, compared with approximately 54% maximum in Utah with uncoated rotors, confirming the importance of scale deposits within the machine on performance. Data are presented for the Utah testing and for the noncondensing phases of the testing in Mexico. Test time logged was 437 hours during the Utah tests and 1101 hours during the Mexico tests.
Date: March 1, 1982
Creator: McKay, R.
System: The UNT Digital Library