Structural walkdown procedure for natural phenomena engineering analyses at the Oak Ridge Y-12 Plant (open access)

Structural walkdown procedure for natural phenomena engineering analyses at the Oak Ridge Y-12 Plant

This walkdown plan outlines the process to be followed and the pertinent structural information to be collected for the assessment of the adequacy of existing or future natural phenomena analyses for the Oak Ridge Y-12 Plant. This approach is being followed in order to develop input to assess that the critical facilities were constructed in accordance with the design drawings, that any major configuration changes to the principle structures are identified and that the location of major equipment loadings are defined. This structural walkdown plan is not intended to collect detailed information for the purpose of developing as-built structural drawings or to evaluate equipment or safety system/component interaction. Implementation of this plan is required for the walkdown phase of the Y-12 Plant natural phenomena analyses. The types of walkdowns to be performed in this procedure include: (1) A walkdown based on a sampling approach to collect detailed structural design information relative to member sizes, orientation, connection, and base details to support the conclusion that the structural configuration is consistent with the design drawings. (2) A walkdown to collect detailed information relative to equipment loadings on top and bottom of floors and roof. (3) A walkthrough inspection of all areas of …
Date: June 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Electric Vehicle Site Operator Program. Year 1 third quarter report, January 1, 1992--March 31, 1992 (open access)

Electric Vehicle Site Operator Program. Year 1 third quarter report, January 1, 1992--March 31, 1992

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.
Date: June 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Resource Conservation and Recovery Act: Part B, Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revison 1.0 (open access)

Resource Conservation and Recovery Act: Part B, Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revison 1.0

This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements.
Date: March 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Preliminary Systems Design Study Assessment Report. Volume 7, Subsystem Concepts (open access)

Preliminary Systems Design Study Assessment Report. Volume 7, Subsystem Concepts

The System Design Study (SDS), part of the Waste Technology Development Department at the Idaho National Engineering Laboratory (INEL), examined techniques available for the remediation of hazardous and transuranic waste stored at the Radioactive Waste Management Complex`s Subsurface Disposal Area at the INEL. Using specific technologies, system concepts for treating the buried waste and the surrounding contaminated soil were evaluated. Evaluation included implementability, effectiveness, and cost. The SDS resulted in the development of technology requirements including demonstration, testing, and evaluation activities needed for implementing each. This volume contains the descriptions and other relevant information of the four subsystems required for most of the ex situ processing systems. This volume covers the metal decontamination and sizing subsystem, soils processing subsystem, low-level waste subsystem, and retrieval subsystem.
Date: January 1, 1992
Creator: Mayberry, J. L.; Feizollahi, F. & Del Signore, J. C.
Object Type: Report
System: The UNT Digital Library
Preliminary systems design study assessment report. [Evaluation of using specific technologies, system concepts for treating the buried waste and surrounding contaminated soil] (open access)

Preliminary systems design study assessment report. [Evaluation of using specific technologies, system concepts for treating the buried waste and surrounding contaminated soil]

The System Design Study (SDS), part of the Waste Technology Development Department at the Idaho National Engineering Laboratory (INEL), examined techniques available for the remediation of hazardous and transuranic waste stored at the Radioactive Waste Management Complex's Subsurface Disposal Area at the INEL. Using specific technologies, system concepts for treating the buried waste and the surrounding contaminated soil were evaluated. Evaluation included implementability, effectiveness, and cost. The SDS resulted in the development of technology requirements including demonstration, testing, and evaluation activities needed for implementing each. This volume contains the descriptions and other relevant information of the four subsystems required for most of the ex situ processing systems. This volume covers the metal decontamination and sizing subsystem, soils processing subsystem, low-level waste subsystem, and retrieval subsystem.
Date: January 1, 1992
Creator: Mayberry, J.L.; Feizollahi, F. & Del Signore, J.C.
Object Type: Report
System: The UNT Digital Library
[Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio]. Volume 9, Removal action system design (open access)

[Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio]. Volume 9, Removal action system design

This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30 percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.
Date: April 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
(Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio) (open access)

(Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio)

This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30 percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.
Date: April 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
MHD Integrated Topping Cycle Project (open access)

MHD Integrated Topping Cycle Project

This fourteenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period November 1, 1990 to January 31, 1991. Testing of the High Pressure Cooling Subsystem electrical isolator was completed. The PEEK material successfully passed the high temperature, high pressure duration tests (50 hours). The Combustion Subsystem drawings were CADAM released. The procurement process is in progress. An equipment specification and RFP were prepared for the new Low Pressure Cooling System (LPCS) and released for quotation. Work has been conducted on confirmation tests leading to final gas-side designs and studies to assist in channel fabrication.The final cathode gas-side design and the proposed gas-side designs of the anode and sidewall are presented. Anode confirmation tests and related analyses of anode wear mechanisms used in the selection of the proposed anode design are presented. Sidewall confirmation tests, which were used to select the proposed gas-side design, were conducted. The design for the full scale CDIF system was completed. A test program was initiated to investigate the practicality of using Avco current controls for current consolidation in the power takeoff (PTO) regions and to determine the cause of past current consolidation failures. Another important activity was …
Date: February 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
MHD Integrated Topping Cycle Project. Fourteenth quarterly technical progress report, November 1, 1990-- January 31, 1991 (open access)

MHD Integrated Topping Cycle Project. Fourteenth quarterly technical progress report, November 1, 1990-- January 31, 1991

This fourteenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period November 1, 1990 to January 31, 1991. Testing of the High Pressure Cooling Subsystem electrical isolator was completed. The PEEK material successfully passed the high temperature, high pressure duration tests (50 hours). The Combustion Subsystem drawings were CADAM released. The procurement process is in progress. An equipment specification and RFP were prepared for the new Low Pressure Cooling System (LPCS) and released for quotation. Work has been conducted on confirmation tests leading to final gas-side designs and studies to assist in channel fabrication.The final cathode gas-side design and the proposed gas-side designs of the anode and sidewall are presented. Anode confirmation tests and related analyses of anode wear mechanisms used in the selection of the proposed anode design are presented. Sidewall confirmation tests, which were used to select the proposed gas-side design, were conducted. The design for the full scale CDIF system was completed. A test program was initiated to investigate the practicality of using Avco current controls for current consolidation in the power takeoff (PTO) regions and to determine the cause of past current consolidation failures. Another important activity was …
Date: February 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Healy clean coal project (open access)

Healy clean coal project

The objective of the Healy Clean Coal Project is to demonstrate the integration of an advanced combustor and a heat recovery system with both high and low temperature emission control processes. Resulting emission levels of SO[sub 2], NO[sub x], and particulates are expected to be significantly better than the federal New source Performance standards. During this past quarter, engineering and design continued on the boiler, combustion flue gas desulfurization (FGD), and turbine/generator systems. Balance of plant equipment procurement specifications continue to be prepared. Construction activities commenced as the access road construction got under way. Temporary ash pond construction and drilling of the supply well will be completed during the next quarter.
Date: August 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Healy clean coal project. Technical quarterly progress report no. 6, April--June 1992 (open access)

Healy clean coal project. Technical quarterly progress report no. 6, April--June 1992

The objective of the Healy Clean Coal Project is to demonstrate the integration of an advanced combustor and a heat recovery system with both high and low temperature emission control processes. Resulting emission levels of SO{sub 2}, NO{sub x}, and particulates are expected to be significantly better than the federal New source Performance standards. During this past quarter, engineering and design continued on the boiler, combustion flue gas desulfurization (FGD), and turbine/generator systems. Balance of plant equipment procurement specifications continue to be prepared. Construction activities commenced as the access road construction got under way. Temporary ash pond construction and drilling of the supply well will be completed during the next quarter.
Date: August 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Healy clean coal project. Quarterly technical progress report No. 5, January--March 1992 (open access)

Healy clean coal project. Quarterly technical progress report No. 5, January--March 1992

The objective of the Healy Clean Coal Project is to demonstrate the integration of an advanced combustor and heat recovery system with both high and low temperature emission control processes. The emission levels of SO{sub 2}, NO{sub x}, and particulates are expected to be significantly better then the federal New Source Performance Standards. (VC)
Date: May 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Healy clean coal project (open access)

Healy clean coal project

The objective of the Healy Clean Coal Project is to demonstrate the integration of an advanced combustor and heat recovery system with both high and low temperature emission control processes. The emission levels of SO{sub 2}, NO{sub x}, and particulates are expected to be significantly better then the federal New Source Performance Standards. (VC)
Date: May 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Healy clean coal project (open access)

Healy clean coal project

The objective of the Healy Clean Coal Project is to demonstrate the integration of an advanced combustor and a heat recovery system with both high and low temperature emission control processes. Resulting emission levels of SO{sub 2}, NO{sub x}, and particulates are expected to be significantly better than the federal New Source Performance Standards. (VC)
Date: March 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Healy clean coal project. Quarterly technical progress report No. 4, October--December 1991 (open access)

Healy clean coal project. Quarterly technical progress report No. 4, October--December 1991

The objective of the Healy Clean Coal Project is to demonstrate the integration of an advanced combustor and a heat recovery system with both high and low temperature emission control processes. Resulting emission levels of SO{sub 2}, NO{sub x}, and particulates are expected to be significantly better than the federal New Source Performance Standards. (VC)
Date: March 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Texas Register, Volume 17, Number 79, (Part II) Pages 7369-7482, October 20, 1992 (open access)

Texas Register, Volume 17, Number 79, (Part II) Pages 7369-7482, October 20, 1992

A weekly publication, the Texas Register serves as the journal of state agency rulemaking for Texas. Information published in the Texas Register includes proposed, adopted, withdrawn and emergency rule actions, notices of state agency review of agency rules, governor's appointments, attorney general opinions, and miscellaneous documents such as requests for proposals. After adoption, these rulemaking actions are codified into the Texas Administrative Code.
Date: October 20, 1992
Creator: Texas. Secretary of State.
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History
Texas Register, Volume 17, Number 79, (Part I) Pages 7287-7364, October 20, 1992 (open access)

Texas Register, Volume 17, Number 79, (Part I) Pages 7287-7364, October 20, 1992

A weekly publication, the Texas Register serves as the journal of state agency rulemaking for Texas. Information published in the Texas Register includes proposed, adopted, withdrawn and emergency rule actions, notices of state agency review of agency rules, governor's appointments, attorney general opinions, and miscellaneous documents such as requests for proposals. After adoption, these rulemaking actions are codified into the Texas Administrative Code.
Date: October 20, 1992
Creator: Texas. Secretary of State.
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History
Proton Therapy Research and Treatment Center (open access)

Proton Therapy Research and Treatment Center

This Grant proposal outlines the steps that will be undertaken to bring the UC Davis Proton Therapy Research and Treatment, known locally as the Proton Therapy Facility (PTF), through its design and construction phases. This application concentrates on the design phase of the PTF project.
Date: May 1, 1992
Creator: Goodnight, J.E. Jr. (University of California Davis Medical Center, Sacramento, CA (United States). Cancer Center) & Alonso, J.R. (Lawrence Berkeley Lab., CA (United States))
Object Type: Report
System: The UNT Digital Library
Proton Therapy Research and Treatment Center (open access)

Proton Therapy Research and Treatment Center

This Grant proposal outlines the steps that will be undertaken to bring the UC Davis Proton Therapy Research and Treatment, known locally as the Proton Therapy Facility (PTF), through its design and construction phases. This application concentrates on the design phase of the PTF project.
Date: May 1, 1992
Creator: Goodnight, J. E. Jr. & Alonso, J. R.
Object Type: Report
System: The UNT Digital Library
PFBC Utility Demonstration Project (open access)

PFBC Utility Demonstration Project

This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP's proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability …
Date: November 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
PFBC Utility Demonstration Project. Annual report, 1991 (open access)

PFBC Utility Demonstration Project. Annual report, 1991

This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 & 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP`s proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the …
Date: November 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Texas Register, Volume 17, Number 83, Pages 7717-7811, November 3, 1992 (open access)

Texas Register, Volume 17, Number 83, Pages 7717-7811, November 3, 1992

A weekly publication, the Texas Register serves as the journal of state agency rulemaking for Texas. Information published in the Texas Register includes proposed, adopted, withdrawn and emergency rule actions, notices of state agency review of agency rules, governor's appointments, attorney general opinions, and miscellaneous documents such as requests for proposals. After adoption, these rulemaking actions are codified into the Texas Administrative Code.
Date: November 3, 1992
Creator: Texas. Secretary of State.
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History
Energy efficient building design. A transfer guide for local governments (open access)

Energy efficient building design. A transfer guide for local governments

The fundamental concepts of the building design process, energy codes and standards, and energy budgets are introduced. These tools were combined into Energy Design Guidelines and design contract requirements. The Guidelines were repackaged for a national audience and a videotape for selling the concept to government executives. An effort to test transfer of the Guidelines to outside agencies is described.
Date: March 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Energy efficient building design (open access)

Energy efficient building design

The fundamental concepts of the building design process, energy codes and standards, and energy budgets are introduced. These tools were combined into Energy Design Guidelines and design contract requirements. The Guidelines were repackaged for a national audience and a videotape for selling the concept to government executives. An effort to test transfer of the Guidelines to outside agencies is described.
Date: March 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library