ARCHITECTURAL AND CIVIL STANDARDS (open access)

ARCHITECTURAL AND CIVIL STANDARDS

Hanford Atomic Production Operation specification guides and standards for architectural and civil engineering are presented. Information includes construction of roads, railroads, roofs, signs, buildings, building equipment, sewers, fences, safety systems, and drainage systems. Details of this manual are given in TID-4100 (Suppl.). (N.W.R.)
Date: January 1, 1963
Creator: unknown
System: The UNT Digital Library
A PROPOSAL FOR THE Mc$sup 2$ ISOCHRONOUS CYCLOTRON. A GENERAL PURPOSE HIGH- INTENSITY 810-Mev PROTON ACCELERATOR (open access)

A PROPOSAL FOR THE Mc$sup 2$ ISOCHRONOUS CYCLOTRON. A GENERAL PURPOSE HIGH- INTENSITY 810-Mev PROTON ACCELERATOR

An isochronous eight-sector proton cyclotron to provide an extracted beam in excess of 100 mu amp at 810 Mev is proposed. The primary proton beam and the secondary meson and neutron beams will be used to investigate nuclear structure and the interactions between elementary particles. Biomedical and space-oriented research programs are also planned. Shielded research areas and an extensive beam transport and analysis system are provided. Theoretical and experimental studies have shown that the Mc/sup 2/ Cyclotron in a practival concept; high extraction efficiencies can be obtained, and the residual radiation problems are manageable. The project would require less than seven years to complete and would cost about ,000,000. (auth)
Date: November 1, 1963
Creator: unknown
System: The UNT Digital Library
STANDARD DESIGN CRITERIA (open access)

STANDARD DESIGN CRITERIA

Hanford Atomic Production Operation specification gaides for design criteria, structural engineering, civil engineering, heating, ventilation, air conditioning, fire alarm systems, noise control, lighting, railroad construction, corrosion protection, and electrical engineering are presented. Details of this manual are given in TID-4100 (Suppl.). (N.W.R.)
Date: January 1, 1963
Creator: unknown
System: The UNT Digital Library
COMPOSITE INDEX OF HANFORD ENGINEERING STANDARDS (open access)

COMPOSITE INDEX OF HANFORD ENGINEERING STANDARDS

Hanford Atomic Production Operation composite index refers to subjects contained in the nine handbooks and manuals published under the Hanford Engineering Standard Program. This index is described in TID-4100(Suppl.). (N.W.R.)
Date: January 1, 1963
Creator: unknown
System: The UNT Digital Library
Chemical Processing Department Monthly Report: March 1963 (open access)

Chemical Processing Department Monthly Report: March 1963

This report, from the Chemical Processing Department at HAPO for March 1963, discusses the following: Production operation; Purex and Redox operation; Finished products operation; maintenance; Financial operations; facilities engineering; research; employee relations; and weapons manufacturing operation.
Date: April 22, 1963
Creator: Hanford Atomic Products Operation. Chemical Processing Department.
System: The UNT Digital Library
DESIGN GUIDES (open access)

DESIGN GUIDES

Hanford Atomic Production Operation specification guides for chemical, civil, electrical, mechanical, structural, steam, and metallurgical engineering are presented. Information is included on piping, valves, packing and gasket materials, stainless steel, tanks, compressed air, painting, and roads. Details of this manual are given in TID-4100(Suppl.). (N.W.R.)
Date: January 1, 1963
Creator: unknown
System: The UNT Digital Library
GUIDES (open access)

GUIDES

Hanford Atomic Production Operation specification guides for equipment and procedures, instrumentation, structural engineering, welding, design criteria, electrical engineering, and construction repairs are presented. Details of this manual are given in TID-4100(Suppl.). (N.W.R.)
Date: January 1, 1963
Creator: unknown
System: The UNT Digital Library
Chemical Processing Department Monthly Report: August 1963 (open access)

Chemical Processing Department Monthly Report: August 1963

This report, from the Chemical Processing Department at HAPO for August 1963, discusses the following: Production operation; Purex and Redox operation; Finished products operation; maintenance; Financial operations; facilities engineering; research; employee relations; and weapons manufacturing operation.
Date: September 20, 1963
Creator: Hanford Atomic Products Operation. Chemical Processing Department.
System: The UNT Digital Library
INSTRUMENT STANDARDS (open access)

INSTRUMENT STANDARDS

Hanford Atomic Production Operation specification guides for instruments, radiation detection instruments, instrumentation, thermocouples, orifices, process control instruments, and electronic design are presented. Details of this manual are given in TID-4100(Suppl.). (N.W.R.)
Date: January 1, 1963
Creator: unknown
System: The UNT Digital Library
N-Reactor Department monthly report, July 1963 (open access)

N-Reactor Department monthly report, July 1963

This report details activities of the N-Reactor Department during the month of July 1963.
Date: August 7, 1963
Creator: unknown
System: The UNT Digital Library
WELDING STANDARDS (open access)

WELDING STANDARDS

Hanford Atomic Production Operation specification guides and standards for welding and brazing are presented. Details of this manual are given in TID- 4100 (Suppl.). (N.W.R.)
Date: January 1, 1963
Creator: unknown
System: The UNT Digital Library
DESIGN CRITERIA FOR HIGH TEMPERATURE LATTICE TEST REACTOR PROJECT CAH-100 (open access)

DESIGN CRITERIA FOR HIGH TEMPERATURE LATTICE TEST REACTOR PROJECT CAH-100

Design and construction specifications to be followed in the development of the reactor, its associated systems and experimental facilities, and the housing and required services for the facility are presented. The testing procedures to be used are outlined. (D.C.W.)
Date: May 24, 1963
Creator: Ballard, D. L.; Brown, W. W.; Harrison, C. W.; Heineman, R. E.; Henry, H. L.; Jeffs, T. W. et al.
System: The UNT Digital Library
SUMMARY REPORT OF DESIGN CRITERIA FOR THE LIQUID METAL PACKAGE LOOPS' HOT CELL FACILITY AND HANDLING SYSTEM AT THE ADVANCED TEST REACTOR (open access)

SUMMARY REPORT OF DESIGN CRITERIA FOR THE LIQUID METAL PACKAGE LOOPS' HOT CELL FACILITY AND HANDLING SYSTEM AT THE ADVANCED TEST REACTOR

S>Criteria work performed, prior to the termination of work on the package concept, for the liquid metal loop facilities for the Advanced Test Reactor is described. Nuclear criteria were determined for the thermal neutron filter and extended core combination in conjunction with the reference test specimen for the Fast Flux Loop. The conceptual design of the thermal loop is discussed, including the in-core section, sodium-to-helium heat exchanger, helium- to-reactor water heat exchanger, pump motor and associated bearing design requirements, preliminary shielding requirements, control system requirements, and electrical heaters within tue permissible space envelope. As the criteria work progressed it was determined that despite the accomplishments, not all the program requirements could be satisfied. (M.C.G.)
Date: March 1, 1963
Creator: unknown
System: The UNT Digital Library
Irradiation Processing Department monthly report, July 1963 (open access)

Irradiation Processing Department monthly report, July 1963

This document details activities of the irradiation processing department during the month of July 1963. A general summary is included at the start of the report, after which the report is divided into the following sections: Research and Engineering Operations: Production and Reactor Operations; Facilities Engineering Operation; and Financial Operation.
Date: August 14, 1963
Creator: unknown
System: The UNT Digital Library
The Biological Irradiation Facility ($sub 4$JANUS$sub 4$ Reactor) Design Manual (open access)

The Biological Irradiation Facility ($sub 4$JANUS$sub 4$ Reactor) Design Manual

The design and characteristics of the Janus Reactor Facility for medical and biological research are described in detail. Pertinent information is given about the nuclear and reactor radiation characteristics of the facility. Information is presented on the design and operation of reactor components, auxiliary equipment, instruments, and associated equipment. Maintenance and operating instructions are included for the facility. Cost breakdown is outlined. (N.W.R.)
Date: June 1, 1963
Creator: McCorkle, W. H.; Pierce, A. W. & Thompson, D. C.
System: The UNT Digital Library
SNAP 8 quarterly progress report, October--December 1962 (open access)

SNAP 8 quarterly progress report, October--December 1962

None
Date: May 20, 1963
Creator: Johnson, C.E. (ed.)
System: The UNT Digital Library
Summary Report of Design Criteria for a Thermal Flux Liquid Metal Package Loop in the Advanced Test Reactor (open access)

Summary Report of Design Criteria for a Thermal Flux Liquid Metal Package Loop in the Advanced Test Reactor

Results of the design criteria work performed prior to the termination of work on the package concept for the liquid metal loop facilities for the Advanced Test Reactor are summarized. Based on the results of the criteria studies, it was concluded that achievement of the design objectives could not be predicted with any high degree of confidence when utilizing the package loop concept based on the design philosophy of the PW-19 loop. The characteristics of the loop are given along with design and development accomplishments for associated equipment. (N.W.R.)
Date: March 1, 1963
Creator: unknown
System: The UNT Digital Library
Hanford Laboratories monthly activities report, April, 1963 (open access)

Hanford Laboratories monthly activities report, April, 1963

This is the monthly report for the Hanford Laboratories Operation, April, 1963. Reactor fuels, chemistry, dosimetry, separation processes, reactor technology financial activities, biology operation, physics and instrumentation research, employee relations, applied mathematics operation, programming, and radiation protection operation discussed.
Date: May 15, 1963
Creator: unknown
System: The UNT Digital Library
The Ornl Gcr-3, a 750-MW(e) Gas-Cooled Clad-Fuel Reactor Power Plant. A Joint Design Study (open access)

The Ornl Gcr-3, a 750-MW(e) Gas-Cooled Clad-Fuel Reactor Power Plant. A Joint Design Study

ABS>An advanced, gas-cooled, clad-fuel reactor power plant to generate 750 Mw of electricity was designed as a study of the potential capability of that system. The graphitemoderated reactor generates 1908 Mw of heat in 1062 fuel channels 21 ft long for a power density of 5.5 kw/liter. Gas temperatures entering and leaving the reactor are 574 and 1150 deg F, respectively, operating at 420 psia. Steam at 2415 psia and 950 deg F with reheat to 1000 deg F drives a 763-Mw(e) turbogenerator and also four 31,000-hp blower drive turbines and the boiler feed pumps. Net thermal efficiency of the plant is 39.4%. Estimated direct cost of construction is 0,267,000, or 7 per kilowatt net electric output. Fuel-cycle costs at 20,000 Mwd per metric ton of uranium are 1.46 mills/ kwhr, operating and maintenance costs are 0.39 mill, and fixed charges range from 1.80 to 4.65 mills, depending on method of financing. Total power generation costs at an 80% load factor range from 3.65 to 6.50 mills/kwhr. (auth)
Date: February 1, 1963
Creator: unknown
System: The UNT Digital Library
ANNUAL REPORT, JULY 1, 1963 (open access)

ANNUAL REPORT, JULY 1, 1963

Developments and research programs are abstracted in three separate sections: physical sciences and engineering, life sciences, and supporting activities. Information is also presented on the organization, finances, publications, service, research facilities, and administration. Separate abstracts were prepared for the three sections. (N.W.R.)
Date: January 1, 1963
Creator: unknown
System: The UNT Digital Library