498 Matching Results

Results open in a new window/tab. Unexpected Results? Search the Catalog Instead.

Safety analysis report for the use of hazardous production materials in photovoltaic applications at the National Renewable Energy Laboratory (open access)

Safety analysis report for the use of hazardous production materials in photovoltaic applications at the National Renewable Energy Laboratory

To ensure the continued safety of SERI's employees, the community, and the environment, NREL commissioned an internal audit of its photovoltaic operations that used hazardous production materials (HPMS). As a result of this audit, NREL management voluntarily suspended all operations using toxic and/or pyrophoric gases. This suspension affected seven laboratories and ten individual deposition systems. These activities are located in Building 16, which has a permitted occupancy of Group B, Division 2 (B-2). NREL management decided to do the following. (1) Exclude from this SAR all operations which conformed, or could easily be made to conform, to B-2 Occupancy requirements. (2) Include in this SAR all operations that could be made to conform to B-2 Occupancy requirements with special administrative and engineering controls. (3) Move all operations that could not practically be made to conform to B-2 occupancy requirements to alternate locations. In addition to the layered set of administrative and engineering controls set forth in this SAR, a semiquantitative risk analysis was performed on 30 various accident scenarios. Twelve presented only routine risks, while 18 presented low risks. Considering the demonstrated safe operating history of NREL in general and these systems specifically, the nature of the risks identified, and …
Date: July 1, 1992
Creator: Crandall, R. S.; Nelson, B. P.; Moskowitz, P. D. & Fthenakis, V. M.
Object Type: Report
System: The UNT Digital Library
Decommissioning of eight surplus production reactors at the Hanford Site, Richland, Washington. Addendum (Final Environmental Impact Statement) (open access)

Decommissioning of eight surplus production reactors at the Hanford Site, Richland, Washington. Addendum (Final Environmental Impact Statement)

The first section of this volume summarizes the content of the draft environmental impact statement (DEIS) and this Addendum, which together constitute the final environmental impact statement (FEIS) prepared on the decommissioning of eight surplus plutonium production reactors at Hanford. The FEIS consists of two volumes. The first volume is the DEIS as written. The second volume (this Addendum) consists of a summary; Chapter 9, which contains comments on the DEIS and provides DOE`s responses to the comments; Appendix F, which provides additional health effects information; Appendix K, which contains costs of decommissioning in 1990 dollars; Appendix L, which contains additional graphite leaching data; Appendix M, which contains a discussion of accident scenarios; Appendix N, which contains errata; and Appendix 0, which contains reproductions of the letters, transcripts, and exhibits that constitute the record for the public comment period.
Date: December 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Slant hole completion test (1991) sidetrack ``as built`` report (open access)

Slant hole completion test (1991) sidetrack ``as built`` report

During the summer of 1990, a slant hole test well, funded by the US Department of Energy, was drilled to 9,466 ft to evaluate the effectiveness of directional drilling in the tight, naturally fractured gas sands and coals of the Mesaverde Group. The surface location of the SHCT No. 1 is 700 ft south of the DOE Multiwell Experiment (MWX) site in Section 34, T6S, R94W, Garfield County, Colorado, approximately 7.5 miles west of Rifle. Mechanical problems following cementing of a production liner resulted in loss of the completion interval, and operations were suspended. In early 1991, DOE decided to sidetrack the hole to permit production testing of the lost interval. The sidetrack was designed to parallel the original wellbore, but to be drilled 1,000 ft to the east to minimize the chances of encountering formation damage from the original hole. The sidetrack, like the original hole, was to intersect the paludal lenticular sands and coals at 60{degrees} and to penetrate the underlying Cozzette sand horizonally. The sidetrack was spudded May 12, 1991. After re-entering the well in late 1991, early production testing of the Cozzette showed that the 300 ft of in-pay horizontal hole can produce at rate 5 …
Date: May 1, 1992
Creator: Myal, F. R.
Object Type: Report
System: The UNT Digital Library
Drilling, completion, stimulation, and testing of BDM/CNGD Well 3997, Lee District, Calhoun County, West Virginia. Final report (open access)

Drilling, completion, stimulation, and testing of BDM/CNGD Well 3997, Lee District, Calhoun County, West Virginia. Final report

This report discusses the detailed field operations in drilling, casing, completing, and stimulating the Hunter Bennett No. 3997 well located in Lee District, Calhoun County West Virginia. The project was designed and managed by BDM in cooperation with CNG Development Company. The well was spudded on November 9, 1990, and drilling was completed on December 14, 1990. The well was drilled on an average asmuth of 312 degrees with a total horizontal displacement of 2459 feet. The well was turned to a 90 degree inclination from the vertical over a measured course length of 1216 feet. Approximately 1381 feet of the well had an inclination higher than 86 degrees, while 2179 feet had an inclination greater than 62 degrees. The well was partitioned into five zones for stimulation purposes. Each zone is a little more than 300 feet long. The well was stimulated with nitrogen gas in zones one and two. Early production results are encouraging. The BDM/CNGD horizontal well averaged 147 mcfd of gas over the first week of production and, in week five, began to produce oil at a rate of about 2 bbl/day.
Date: March 1, 1992
Creator: Overbey, W. K. Jr.; Carden, R. S.; Salamy, S. P.; Locke, C. D. & Johnson, H. R.
Object Type: Report
System: The UNT Digital Library
Slant hole completion test (1991) sidetrack as built'' report (open access)

Slant hole completion test (1991) sidetrack as built'' report

During the summer of 1990, a slant hole test well, funded by the US Department of Energy, was drilled to 9,466 ft to evaluate the effectiveness of directional drilling in the tight, naturally fractured gas sands and coals of the Mesaverde Group. The surface location of the SHCT No. 1 is 700 ft south of the DOE Multiwell Experiment (MWX) site in Section 34, T6S, R94W, Garfield County, Colorado, approximately 7.5 miles west of Rifle. Mechanical problems following cementing of a production liner resulted in loss of the completion interval, and operations were suspended. In early 1991, DOE decided to sidetrack the hole to permit production testing of the lost interval. The sidetrack was designed to parallel the original wellbore, but to be drilled 1,000 ft to the east to minimize the chances of encountering formation damage from the original hole. The sidetrack, like the original hole, was to intersect the paludal lenticular sands and coals at 60{degrees} and to penetrate the underlying Cozzette sand horizonally. The sidetrack was spudded May 12, 1991. After re-entering the well in late 1991, early production testing of the Cozzette showed that the 300 ft of in-pay horizontal hole can produce at rate 5 …
Date: May 1, 1992
Creator: Myal, F.R.
Object Type: Report
System: The UNT Digital Library
Drilling, completion, stimulation, and testing of BDM/CNGD Well 3997, Lee District, Calhoun County, West Virginia (open access)

Drilling, completion, stimulation, and testing of BDM/CNGD Well 3997, Lee District, Calhoun County, West Virginia

This report discusses the detailed field operations in drilling, casing, completing, and stimulating the Hunter Bennett No. 3997 well located in Lee District, Calhoun County West Virginia. The project was designed and managed by BDM in cooperation with CNG Development Company. The well was spudded on November 9, 1990, and drilling was completed on December 14, 1990. The well was drilled on an average asmuth of 312 degrees with a total horizontal displacement of 2459 feet. The well was turned to a 90 degree inclination from the vertical over a measured course length of 1216 feet. Approximately 1381 feet of the well had an inclination higher than 86 degrees, while 2179 feet had an inclination greater than 62 degrees. The well was partitioned into five zones for stimulation purposes. Each zone is a little more than 300 feet long. The well was stimulated with nitrogen gas in zones one and two. Early production results are encouraging. The BDM/CNGD horizontal well averaged 147 mcfd of gas over the first week of production and, in week five, began to produce oil at a rate of about 2 bbl/day.
Date: March 1, 1992
Creator: Overbey, W. K. Jr.; Carden, R. S.; Salamy, S. P.; Locke, C. D. & Johnson, H. R.
Object Type: Report
System: The UNT Digital Library
Drilling, completion, stimulation, and testing of Hardy HW{number_sign}1 well, Putnam County, West Virginia. Final report (open access)

Drilling, completion, stimulation, and testing of Hardy HW{number_sign}1 well, Putnam County, West Virginia. Final report

This report discusses the detailed field operations in drilling, logging, casing, completing, stimulating and testing the Hardy HW No. l well located in Union District, Putnam County, West Virginia. The project was designed and managed by BDM in cooperation with Cabot Oil and Gas Corporation. The well was spudded on November 29, 1989 and was completed at a total measured depth of 6406 feet on December 29, 1989. The well was drilled on an average azimuth of 335 degrees with a total horizontal displacement of 2618 feet. Approximately 1035 feet of the well had an inclination higher than 86 degrees, while 2212 feet of the well had an inclination greater than 62 degrees. The well was partitioned into five zones for stimulation purposes. Four zones were stimulated during three stimulation operations (Zones 3 and 4 were stimulated together). Zone 1 stimulation was a successful foam frac while the stimulations on Zones 2, 3-4 were Partially successful. Initial gas production rates were 4.5 times greater than the natural production rate. After 21 months, gas produced from the BDM/Cabot well has declined at a rate about one-half that of a conventional vertical well in the area. This horizontal well is projected to …
Date: March 1, 1992
Creator: Overbey, W. K. Jr.; Carden, R. S.; Locke, C. D. & Salamy, S. P.
Object Type: Report
System: The UNT Digital Library
Drilling, completion, stimulation, and testing of Hardy HW[number sign]1 well, Putnam County, West Virginia (open access)

Drilling, completion, stimulation, and testing of Hardy HW[number sign]1 well, Putnam County, West Virginia

This report discusses the detailed field operations in drilling, logging, casing, completing, stimulating and testing the Hardy HW No. l well located in Union District, Putnam County, West Virginia. The project was designed and managed by BDM in cooperation with Cabot Oil and Gas Corporation. The well was spudded on November 29, 1989 and was completed at a total measured depth of 6406 feet on December 29, 1989. The well was drilled on an average azimuth of 335 degrees with a total horizontal displacement of 2618 feet. Approximately 1035 feet of the well had an inclination higher than 86 degrees, while 2212 feet of the well had an inclination greater than 62 degrees. The well was partitioned into five zones for stimulation purposes. Four zones were stimulated during three stimulation operations (Zones 3 and 4 were stimulated together). Zone 1 stimulation was a successful foam frac while the stimulations on Zones 2, 3-4 were Partially successful. Initial gas production rates were 4.5 times greater than the natural production rate. After 21 months, gas produced from the BDM/Cabot well has declined at a rate about one-half that of a conventional vertical well in the area. This horizontal well is projected to …
Date: March 1, 1992
Creator: Overbey, W. K. Jr.; Carden, R. S.; Locke, C. D. & Salamy, S. P.
Object Type: Report
System: The UNT Digital Library
Nesbitt Memorial Library Journal, Volume 2, Number 2, May 1992 (open access)

Nesbitt Memorial Library Journal, Volume 2, Number 2, May 1992

The Nesbitt Memorial Library Journal contains historical information about Colorado County, Texas including personal accounts and research into area stories.
Date: May 1992
Creator: Nesbitt Memorial Library
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History
Testing of the Pleasant Bayou Well through October 1990 (open access)

Testing of the Pleasant Bayou Well through October 1990

Pleasant Bayou location was inactive from 1983 until the cleanout of the production and disposal wells in 1986. The surface facilities were rehabilitated and after shakedown of the system, additional repair of wellhead valves, and injection of an inhibitor pill, continuous long-term production was started in 1988. Over two years of production subsequent to that are reviewed here, including: production data, brine sampling and analysis, hydrocarbon sampling and analysis, solids sampling and analysis, scale control and corrosion monitoring and control.
Date: August 1, 1992
Creator: Randolph, P. L.; Hayden, C. G.; Mosca, V. L. & Anhaiser, J. L.
Object Type: Report
System: The UNT Digital Library
Railroad Commission of Texas Oil and Gas Division Annual Report: 1991, Volume 1 (open access)

Railroad Commission of Texas Oil and Gas Division Annual Report: 1991, Volume 1

First part of an annual report of the Texas Railroad Commission's Oil and Gas Division providing background on the industry and the agency's activities, information related to the production of oil and gas, and data regarding production by field.
Date: August 24, 1992
Creator: Railroad Commission of Texas. Oil and Gas Division.
Object Type: Report
System: The Portal to Texas History
Flow tests of the Gladys McCall well. Appendix A, Gladys McCall Site (Cameron Parish, LA): Final report, October 1985--October 1990 (open access)

Flow tests of the Gladys McCall well. Appendix A, Gladys McCall Site (Cameron Parish, LA): Final report, October 1985--October 1990

This report pulls together the data from all of the geopressured-geothermal field research conducted at the Gladys McCall well. The well produced geopressured brine containing dissolved natural gas from the Lower Miocene sands at a depth of 15,150 to 16,650 feet. More than 25 million barrels of brine and 727 million standard cubic feet of natural gas were produced in a series of flow tests between December 1982 and October 1987 at various brine flow rates up to 28,000 barrels per day. Initial short-term flow tests for the Number 9 Sand found the permeability to be 67 to 85 md (millidarcies) for a brine volume of 85 to 170 million barrels. Initial short-term flow tests for the Number 8 Sand found a permeability of 113 to 132 md for a reservoir volume of 430 to 550 million barrels of brine. The long-term flow and buildup test of the Number 8 Sand found that the high-permeability reservoir connected to the wellbore (measured by the short-term flow test) was connected to a much larger, low-permeability reservoir. Numerical simulation of the flow and buildup tests required this large connected reservoir to have a volume of about 8 billion barrels (two cubic miles of …
Date: April 1, 1992
Creator: Randolph, P. L.; Hayden, C. G. & Rogers, L. A.
Object Type: Report
System: The UNT Digital Library
Railroad Commission of Texas Oil and Gas Division Annual Report: 1991, Volume 2 (open access)

Railroad Commission of Texas Oil and Gas Division Annual Report: 1991, Volume 2

Second part of an annual report from the Texas Railroad Commission's Oil and Gas Division providing information and data, organized by district, related to gas well gas production and hydrocarbon liquids recovered on leases.
Date: August 1992
Creator: Railroad Commission of Texas. Oil and Gas Division.
Object Type: Report
System: The Portal to Texas History
Flow tests of the Gladys McCall well (open access)

Flow tests of the Gladys McCall well

This report pulls together the data from all of the geopressured-geothermal field research conducted at the Gladys McCall well. The well produced geopressured brine containing dissolved natural gas from the Lower Miocene sands at a depth of 15,150 to 16,650 feet. More than 25 million barrels of brine and 727 million standard cubic feet of natural gas were produced in a series of flow tests between December 1982 and October 1987 at various brine flow rates up to 28,000 barrels per day. Initial short-term flow tests for the Number 9 Sand found the permeability to be 67 to 85 md (millidarcies) for a brine volume of 85 to 170 million barrels. Initial short-term flow tests for the Number 8 Sand found a permeability of 113 to 132 md for a reservoir volume of 430 to 550 million barrels of brine. The long-term flow and buildup test of the Number 8 Sand found that the high-permeability reservoir connected to the wellbore (measured by the short-term flow test) was connected to a much larger, low-permeability reservoir. Numerical simulation of the flow and buildup tests required this large connected reservoir to have a volume of about 8 billion barrels (two cubic miles of …
Date: April 1, 1992
Creator: Randolph, P. L.; Hayden, C. G. & Rogers, L. A.
Object Type: Report
System: The UNT Digital Library
Chronicles of Oklahoma, Volume 70, Number 3, Fall 1992 (open access)

Chronicles of Oklahoma, Volume 70, Number 3, Fall 1992

Quarterly publication containing articles, book reviews, photographs, illustrations, and other works documenting Oklahoma history and preservation.
Date: Autumn 1992
Creator: Oklahoma Historical Society
Object Type: Journal/Magazine/Newsletter
System: The Gateway to Oklahoma History
"More Valuable than Oil" The Establishment and Development of Tinker Air Force Base, 1940-1949 (open access)

"More Valuable than Oil" The Establishment and Development of Tinker Air Force Base, 1940-1949

Article describes the efforts of the Oklahoma City Chamber of Commerce to obtain an air depot and the eventual construction of Tinker Air Force Base. James L. Crowder, Jr. focuses on the details behind the developments and the way the air base prepared U.S. army recruits for the war effort.
Date: Autumn 1992
Creator: Crowder, James L., Jr.
Object Type: Article
System: The Gateway to Oklahoma History
Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site (open access)

Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE`s Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at …
Date: November 1, 1992
Creator: Hlohowskyj, I. & Dunn, C. P.
Object Type: Report
System: The UNT Digital Library
Air Quality Analysis and Related Risk Assessment for the Bonneville Power Administration's Resource Program Environmental Impact Statement (open access)

Air Quality Analysis and Related Risk Assessment for the Bonneville Power Administration's Resource Program Environmental Impact Statement

The Bonneville Power Administration (BPA) is considering 12 different alternatives for acquiring energy resources over the next 20 years. Each of the alternatives utilizes a full range of energy resources (e.g., coal, cogeneration, conservation, and nuclear); however, individual alternatives place greater emphases on different types of power-producing resources and employ different timetables for implementing these resources. The environmental impacts that would result from the implementation of each alternative and the economic valuations of these impacts, will be an important consideration in the alternative selection process. In this report we discuss the methods used to estimate environmental impacts from the resource alternatives. We focus on pollutant emissions rates, ground-level air concentrations of basic criteria pollutants, the acidity of rain, particulate deposition, ozone concentrations, visibility attenuation, global warming, human health effects, agricultural and forest impacts, and wildlife impacts. For this study, pollutant emission rates are computed by processing BPA data on power production and associated pollutant emissions. The assessment of human health effects from ozone indicated little variation between the resource alternatives. Impacts on plants, crops, and wildlife populations from power plant emissions are projected to be minimal for all resource alternatives.
Date: April 1, 1992
Creator: Glantz, C. S.; Burk, K. W.; Driver, C. J.; Liljegren, J. C.; Neitzel, D. A.; Schwartz, M. N. et al.
Object Type: Report
System: The UNT Digital Library
Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site (open access)

Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE's Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at …
Date: November 1, 1992
Creator: Hlohowskyj, I. & Dunn, C. P.
Object Type: Report
System: The UNT Digital Library
Phase I Water Rental Pilot Project : Snake River Resident Fish and Wildlife Resources and Management Recommendations. (open access)

Phase I Water Rental Pilot Project : Snake River Resident Fish and Wildlife Resources and Management Recommendations.

The Idaho Water Rental Pilot Project was implemented as a part of the Non-Treaty Storage Fish and Wildlife Agreement (NTSA) between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to improve juvenile and adult salmon and steelhead passage in the lower Snake River with the use of rented water for flow augmentation. The primary purpose of this project is to summarize existing resource information and provide recommendations to protect or enhance resident fish and wildlife resources in Idaho with actions achieving flow augmentation for anadromous fish. Potential impacts of an annual flow augmentation program on Idaho reservoirs and streams are modeled. Potential sources of water for flow augmentation and operational or institutional constraints to the use of that water are identified. This report does not advocate flow augmentation as the preferred long-term recovery action for salmon. The state of Idaho strongly believes that annual drawdown of the four lower Snake reservoirs is critical to the long-term enhancement and recovery of salmon (Andrus 1990). Existing water level management includes balancing the needs of hydropower production, irrigated agriculture, municipalities and industries with fish, wildlife and recreation. Reservoir minimum pool maintenance, water quality and …
Date: October 1, 1992
Creator: Riggin, Stacey H. & Hansen, H. Jerome
Object Type: Report
System: The UNT Digital Library
Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington. (open access)

Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.
Date: June 1, 1992
Creator: Ashley, Paul
Object Type: Report
System: The UNT Digital Library
Grand Coulee Dam Wildlife Mitigation Program : Sharp-Tailed Grouse Programmatic Management Plan, Tracy Rock Vicinity, Lincoln County, Washington. (open access)

Grand Coulee Dam Wildlife Mitigation Program : Sharp-Tailed Grouse Programmatic Management Plan, Tracy Rock Vicinity, Lincoln County, Washington.

None
Date: June 1, 1992
Creator: Ashley, Paul
Object Type: Report
System: The UNT Digital Library
Wildlife Habitat Impact Assessment, Chief Joseph Dam Project, Washington : Project Report 1992. (open access)

Wildlife Habitat Impact Assessment, Chief Joseph Dam Project, Washington : Project Report 1992.

Under the Pacific Northwest Electric Power Planning and Conservation Act of 1980, and the subsequent Northwest Power Planning Council`s Columbia River Basin Fish and Wildlife Program, a wildlife habitat impact assessment and identification of mitigation objectives have been developed for the US Army Corps of Engineer`s Chief Joseph Dam Project in north-central Washington. This study will form the basis for future mitigation planning and implementation.
Date: January 1, 1992
Creator: Kuehn, Douglas & Berger, Matthew
Object Type: Report
System: The UNT Digital Library
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993. (open access)

Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.
Date: September 1, 1992
Creator: Administration, United States. Bonneville Power; S.), Northwest Power Planning Council (U. & Authority, Columbia Basin Fish and Wildlife
Object Type: Report
System: The UNT Digital Library