Fort Hood Solar Total Energy Project. Volume IV. Project Management Plan. Final report (open access)

Fort Hood Solar Total Energy Project. Volume IV. Project Management Plan. Final report

The Project Management Plan presented is designed to implement the definitive design phase of this project by establishing the organization, tasks, schedules, and controls to assure the accomplishment of project objectives within time and budgetary constraints. Specifically, the plan presents a functional organization composed of a team of personnel with proven experience and capability; clear and concise methods for evaluation and control of project activities and costs; and a set of procedures that provides a means for sound and timely decisions and actions relative to project tasks and milestones. Since a significant portion of the overall design effort is to be performed by a subcontractor, Westinghouse Electric Corporation, this management plan, in conjunction with subcontract provisions, establishes a sound base for evaluation, control and coordination of all activities associated with their respective tasks. (WHK)
Date: January 1, 1979
Creator: None,
System: The UNT Digital Library
Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 2. System performance and supporting studies. Final report (open access)

Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 2. System performance and supporting studies. Final report

The preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas, is presented. System performance analysis and evaluation are described. Feedback of completed performance analyses on current system design and operating philosophy is discussed. The basic computer simulation techniques and assumptions are described and the resulting energy displacement analysis is presented. Supporting technical studies are presented. These include health and safety and reliability assessments; solar collector component evaluation; weather analysis; and a review of selected trade studies which address significant design alternatives. Additional supporting studies which are generally specific to the installation site are reported. These include solar availability analysis; energy load measurements; environmental impact assessment; life cycle cost and economic analysis; heat transfer fluid testing; meteorological/solar station planning; and information dissemination. (WHK)
Date: January 1, 1979
Creator: None,
System: The UNT Digital Library
Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report (open access)

Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters …
Date: January 1, 1979
Creator: None,
System: The UNT Digital Library