23 Matching Results

Results open in a new window/tab. Unexpected Results? Search the Catalog Instead.

Tank Waste Information Network System (TWINS) FY 2001 Data Management Plan (open access)

Tank Waste Information Network System (TWINS) FY 2001 Data Management Plan

The mission of Tank Waste Information Network System (TWINS) is to provide system users with quality tank data and information when needed, in the form needed and at a reasonable cost.
Date: June 12, 2000
Creator: Adams, M. R.
System: The UNT Digital Library
WIPP Facility Work Plan for Solid Waste Management Units (open access)

WIPP Facility Work Plan for Solid Waste Management Units

This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility …
Date: February 25, 2000
Creator: Westinghouse TRU Solutions LLC
System: The UNT Digital Library
Single Shell Tank (SST) Retrieval Project Plan for Tank 241-C-104 Retrieval (open access)

Single Shell Tank (SST) Retrieval Project Plan for Tank 241-C-104 Retrieval

In support of the SST Interim Closure Project, Project W-523 ''Tank 241-C-104 Waste Retrieval System'' will provide systems for retrieval and transfer of radioactive waste from tank 241-C-104 (C-104) to the DST staging tank 241-AY-101 (AY-101). At the conclusion of Project W-523, a retrieval system will have been designed and tested to meet the requirements for Acceptance of Beneficial Use and been turned over to operations. Completion of construction and operations of the C-104 retrieval system will meet the recently proposed near-term Tri-Party Agreement milestone, M-45-03F (Proposed Tri-Party Agreement change request M-45-00-01A, August, 30 2000) for demonstrating limits of retrieval technologies on sludge and hard heels in SSTs, reduce near-term storage risks associated with aging SSTs, and provide feed for the tank waste treatment plant. This Project Plan documents the methodology for managing Project W-523; formalizes responsibilities; identifies key interfaces required to complete the retrieval action; establishes the technical, cost, and schedule baselines; and identifies project organizational requirements pertaining to the engineering process such as environmental, safety, quality assurance, change control, design verification, testing, and operational turnover.
Date: September 20, 2000
Creator: DEFIGH PRICE, C.
System: The UNT Digital Library
Indian Trust Funds: Improvements Made in Acquisition of New Asset and Accounting System But Significant Risks Remain (open access)

Indian Trust Funds: Improvements Made in Acquisition of New Asset and Accounting System But Significant Risks Remain

A letter report issued by the General Accounting Office with an abstract that begins "Pursuant to a congressional request, GAO evaluated the Department of the Interior's effort to acquire and develop its new Trust Asset and Accounting Management System (TAAMS), focusing on: (1) actions Interior has taken in response to GAO's previous reviews and recommendations; and (2) the business and technical risks and challenges still confronting Interior as it begins to deploy TAAMS."
Date: September 15, 2000
Creator: United States. General Accounting Office.
System: The UNT Digital Library
Spent Nuclear Fuel Project document control and Records Management Program Description (open access)

Spent Nuclear Fuel Project document control and Records Management Program Description

The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document.
Date: May 18, 2000
Creator: MARTIN, B.M.
System: The UNT Digital Library
Project Management Plan (PMP) for Work Management Implementation (open access)

Project Management Plan (PMP) for Work Management Implementation

The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system
Date: January 13, 2000
Creator: Shipler, C. E.
System: The UNT Digital Library
Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000 (open access)

Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.
Date: January 10, 2000
Creator: Jensen, C. E.
System: The UNT Digital Library
Engineering Task Plan for the Ultrasonic Inspection of Hanford Double-Shell Tanks - FY 2001 (open access)

Engineering Task Plan for the Ultrasonic Inspection of Hanford Double-Shell Tanks - FY 2001

This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities, plan for performance demonstration testing, and a plan for field activities. Also included are a Statement of Work for contractor performance and a protocol to be followed should tank flaws that exceed the acceptance criteria are found.
Date: October 12, 2000
Creator: JENSEN, C.E.
System: The UNT Digital Library
Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program Plan (open access)

Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program Plan

The revised Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted as required by the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995 and became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Science Division (ESD) at the Oak Ridge National Laboratory (ORNL) at the request of the Y-12 Plant. The revision to the BMAP plan is based on results of biological monitoring conducted during the period of 1985 to present. Details of the specific procedures used in the current routine monitoring program are provided; experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional bioaccumulation monitoring if results indicate unexpectedly high PCBs or Hg) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites …
Date: September 1, 2000
Creator: Adams, S. M.; Brandt, C. C.; Christensen, S. W.; Greeley, M. S. Jr.; Hill, W. R.; Peterson, M. J. et al.
System: The UNT Digital Library
Review of Waste Retrieval Sluicing System Operations and Data for Tanks 241-C-106 and 241-AY-102 (open access)

Review of Waste Retrieval Sluicing System Operations and Data for Tanks 241-C-106 and 241-AY-102

Sluicing operations were performed to retrieve high-heat sludge from single-shell tank 241-C-106 and transfer it to double-shell tank 241-AY-102 using the Waste Retrieval Sluicing System. This eliminated the high-heat safety issue for C-106 and demonstrated a technology for retrieval of single-shell tank waste. Both AY-102 and C-106 were monitored during the waste transfer operations, providing a clear picture of general trends in each tank. Specific issues addressed were evaluation of the data for evidence of flammable gas accumulation in AY-102 and thermal performance of AY-102 under the increasing heat load.
Date: September 26, 2000
Creator: Cuta, Judith M.; Carothers, Kelly G.; Damschen, Dennis W.; Kuhn, William L.; Lechelt, Jeanne A.; Sathyanarayana, Kurabalakota et al.
System: The UNT Digital Library
Review of Waste Retrieval Sluicing System Operations and Data for Tanks 241-C-106 and 241-AY-102 (open access)

Review of Waste Retrieval Sluicing System Operations and Data for Tanks 241-C-106 and 241-AY-102

None
Date: September 26, 2000
Creator: Cuta, J. M.; Carothers, K. G.; Damschen, D. W.; Kuhn, W. L.; Lechelt, J. A.; Sathyanarayana, K. et al.
System: The UNT Digital Library
RFI/RI work plan for the Road A Chemical Basin 904-111G (open access)

RFI/RI work plan for the Road A Chemical Basin 904-111G

This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.
Date: March 7, 2000
Creator: Kmetz, T. F.; Vanpelt, R. & McAdams, T.
System: The UNT Digital Library
Site Specific Single Shell Tank (SST) phase 1 RFI and CMS Work Plan Addendum for Waste Management B-BX-BY (open access)

Site Specific Single Shell Tank (SST) phase 1 RFI and CMS Work Plan Addendum for Waste Management B-BX-BY

This site-specific work plan addendum for WMA B-BX-BY addresses vadose zone characterization plans for collecting and analyzing sediment samples.
Date: May 19, 2000
Creator: ROGERS, P.M.
System: The UNT Digital Library
Hanford Site Groundwater Monitoring: Setting, Sources, and Methods (open access)

Hanford Site Groundwater Monitoring: Setting, Sources, and Methods

Hanford Site Groundwater Monitoring: Setting, Sources, and Methods
Date: April 11, 2000
Creator: Hartman, Mary J.
System: The UNT Digital Library
Hanford Site groundwater monitoring: Setting, sources and methods (open access)

Hanford Site groundwater monitoring: Setting, sources and methods

Groundwater monitoring is conducted on the Hanford Site to meet the requirements of the Resource Conservation and Recovery Act of 1976 (RCRA); Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); U.S. Department of Energy (DOE) orders; and the Washington Administrative Code. Results of monitoring are published annually (e.g., PNNL-11989). To reduce the redundancy of these annual reports, background information that does not change significantly from year to year has been extracted from the annual report and published in this companion volume. This report includes a description of groundwater monitoring requirements, site hydrogeology, and waste sites that have affected groundwater quality or that require groundwater monitoring. Monitoring networks and methods for sampling, analysis, and interpretation are summarized. Vadose zone monitoring methods and statistical methods also are described. Whenever necessary, updates to information contained in this document will be published in future groundwater annual reports.
Date: April 11, 2000
Creator: Hartman, M.J.
System: The UNT Digital Library
Site Characterization Work Plan for Gasbuggy, New Mexico (open access)

Site Characterization Work Plan for Gasbuggy, New Mexico

Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried …
Date: December 14, 2000
Creator: United States. Department of Energy. Nevada Operations Office.
System: The UNT Digital Library
Waste Isolation Pilot Plant Biennial Environmental Compliance Report (open access)

Waste Isolation Pilot Plant Biennial Environmental Compliance Report

This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 1998, to March 31, 2000. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, and amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Area Office's (hereinafter the ''CAO'') compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. An issue was identified in the 1998 BECR relating to a potential cross-connection between the fire-water systems and the site domestic water system. While the CAO and its managing and operating contractor (hereinafter the ''MOC'') believe the site was always in compliance with cross-connection control requirements, hardware and procedural upgrades w ere implemented in March 1999 to strengthen its compliance posture. Further discussion of this issue is presented in section 30.2.2 herein. During this reporting period WIPP received two letters and a compliance order alleging violation of certain requirements outlined in section 9(a)(1) of the LWA. With the exception of one item, pending a final …
Date: December 1, 2000
Creator: Solutions, Westinghouse TRU
System: The UNT Digital Library
Workplan/RCRA Facility Investigation/Remedial Investigation Report for the Old Radioactive Waste Burial Ground 643-E, S01-S22 - Volume I - Text and Volume II - Appendices (open access)

Workplan/RCRA Facility Investigation/Remedial Investigation Report for the Old Radioactive Waste Burial Ground 643-E, S01-S22 - Volume I - Text and Volume II - Appendices

This document presents the assessment of environmental impacts resulting from releases of hazardous substances from the facilities in the Old Radioactive Waste Burial Ground 643-E, including Solvent Tanks 650-01E to 650-22E, also referred to as Solvent Tanks at the Savannah River Site, Aiken, South Carolina.
Date: December 12, 2000
Creator: Conner, K. R.
System: The UNT Digital Library
Spent Nuclear Fuel (SNF) Project Final Safety Analysis Report (FSAR) (open access)

Spent Nuclear Fuel (SNF) Project Final Safety Analysis Report (FSAR)

None
Date: March 16, 2000
Creator: McCormack, R. L.
System: The UNT Digital Library
Spent Nuclear Fuel (SNF) Project Final Safety Analysis Report (FSAR) (open access)

Spent Nuclear Fuel (SNF) Project Final Safety Analysis Report (FSAR)

None
Date: August 9, 2000
Creator: BREHM, J.R.
System: The UNT Digital Library