7 Matching Results

Results open in a new window/tab. Unexpected Results? Search the Catalog Instead.

Savannah River Site RCRA Facility Investigation plan: Road A Chemical Basin (open access)

Savannah River Site RCRA Facility Investigation plan: Road A Chemical Basin

The nature of wastes disposed of at the Road A Chemical Basin (RACB) is such that some degree of soil contamination is probable. Lead has also been detected in site monitoring wells at concentrations above SRS background levels. A RCRA Facility Investigation (RFI) is proposed for the RACB and will include a ground penetrating radar (GPR) survey, collection and chemical and radiological analyses of soil cores, installation of groundwater monitoring wells, collection and chemical and radiological analyses of groundwater samples, and collection of chemical and radiological analyses of surface water and sediment samples. Upon completion of the proposed RFI field work and chemical and radiological analyses, and RFI report should be prepared to present conclusions on the nature and extent of contamination at the site, and to make recommendations for site remediation. If contamination is detected at concentrations above SRS background levels, a receptor analysis should be done to evaluate potential impacts of site contamination on nearby populations.
Date: June 1, 1989
Creator: unknown
System: The UNT Digital Library
Resource Conservation and Recovery Act (RCRA). Facility Investigation Program Plan (open access)

Resource Conservation and Recovery Act (RCRA). Facility Investigation Program Plan

This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication ``Characterization of Hazardous Waste Sites`` has been liberally adapted for use in this RFI Program Plan.
Date: June 30, 1989
Creator: unknown
System: The UNT Digital Library
Environment, safety and health compliance assessment, Feed Materials Production Center, Fernald, Ohio (open access)

Environment, safety and health compliance assessment, Feed Materials Production Center, Fernald, Ohio

The Secretary of Energy established independent Tiger Teams to conduct environment, safety, and health (ES H) compliance assessments at US Department of Energy (DOE) facilities. This report presents the assessment of the Feed Materials Production Center (FMPC) at Fernald, Ohio. The purpose of the assessment at FMPC is to provide the Secretary with information regarding current ES H compliance status, specific ES H noncompliance items, evaluation of the adequacy of the ES H organizations and resources (DOE and contractor), and root causes for noncompliance items. Areas reviewed included performance under Federal, state, and local agreements and permits; compliance with Federal, state and DOE orders and requirements; adequacy of operations and other site activities, such as training, procedures, document control, quality assurance, and emergency preparedness; and management and staff, including resources, planning, and interactions with outside agencies.
Date: September 1, 1989
Creator: unknown
System: The UNT Digital Library
Remediation of DOE hazardous waste sites: Planning and integration requirements (open access)

Remediation of DOE hazardous waste sites: Planning and integration requirements

The US Department of Energy (DOE) is faced with a immense challenge in effectively implementing a program to mitigate and manage the environmental impacts created by current operations and from past activities at its facilities. The current regulatory framework and public interest in the environmental arena have made operating DOE facilities in an environmentally responsible manner a compelling priority. This paper provides information on the results of a project funded by DOE to obtain a better understanding of the regulatory and institutional drivers in the hazardous waste market and the costs and timeframes required for remediation activities. Few realize that before remediating a hazardous waste site, a comprehensive planning process must be conducted to characterize the nature and extent of site contamination, calculate the risk to the public, and assess the effectiveness of various remediation technologies. The US Environmental Protection Agency (EPA) and others have found that it may take up to 7 years to complete the planning process at an average cost of $1.0 million per site. While cost information is not yet available for DOE sites, discussions with hazardous waste consulting firms indicate that average characterization and assessment costs will be 5 to 10 times this amount for …
Date: September 1, 1989
Creator: Geffen, C. A.; Garrett, B. A.; Cowan, C. E.; Siegel, M. R. & Keller, J. F. (Pacific Northwest Lab., Richland, WA (USA))
System: The UNT Digital Library
Savannah River Site RCRA Facility Investigation plan: Road A Chemical Basin (open access)

Savannah River Site RCRA Facility Investigation plan: Road A Chemical Basin

The nature of wastes disposed of at the Road A Chemical Basin (RACB) is such that some degree of soil contamination is probable. Lead has also been detected in site monitoring wells at concentrations above SRS background levels. A RCRA Facility Investigation (RFI) is proposed for the RACB and will include a ground penetrating radar (GPR) survey, collection and chemical and radiological analyses of soil cores, installation of groundwater monitoring wells, collection and chemical and radiological analyses of groundwater samples, and collection of chemical and radiological analyses of surface water and sediment samples. Upon completion of the proposed RFI field work and chemical and radiological analyses, and RFI report should be prepared to present conclusions on the nature and extent of contamination at the site, and to make recommendations for site remediation. If contamination is detected at concentrations above SRS background levels, a receptor analysis should be done to evaluate potential impacts of site contamination on nearby populations.
Date: June 1, 1989
Creator: unknown
System: The UNT Digital Library
Site Characterization Program at the Radioactive Waste Management Complex of the Idaho National Engineering Laboratory (open access)

Site Characterization Program at the Radioactive Waste Management Complex of the Idaho National Engineering Laboratory

The Radioactive Waste Management Complex (RWMC) Site Characterization Program is a continuation of the Subsurface Investigation Program (SIP). The scope of the SIP has broadened in response to the results of past work that identified hazardous as well as radionuclide contaminants in the subsurface environment and in response to the need to meet regulatory requirements. Two deep boreholes were cored at the RWMC during FY-1988. Selected sediment samples were submitted for Appendix IX of 40 CFR Part 264 and radionuclide analyses. Detailed geologic logging of archived core was initiated. Stratigraphic studies of the unsaturated zone were conducted. Studies to determine hydrologic properties of sediments and basalts were conducted. Geochemical studies and analyses were initiated to evaluate contaminant and radionuclide speciation and migration in the Subsurface Disposal Area (SDA) geochemical environment. Analyses of interbed sediments in boreholes D15 and 8801D did not confirm the presence of radionuclide contamination in the 240-ft interbed. Analyses of subsurface air and groundwater samples identified five volatile organic compounds of concern: carbon tetrachloride, trichloroethylene, 1,1,1-trichloroethane, chloroform, and tetrachloroethylene. 33 refs., 5 figs., 2 tabs.
Date: July 1, 1989
Creator: McElroy, D. L.; Rawson, S. A.; Hubbell, J. M.; Minkin, S. C.; Baca, R. G.; Vigil, M. J. et al.
System: The UNT Digital Library
Resource Conservation and Recovery Act (RCRA) (open access)

Resource Conservation and Recovery Act (RCRA)

This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication Characterization of Hazardous Waste Sites'' has been liberally adapted for use in this RFI Program Plan.
Date: June 30, 1989
Creator: unknown
System: The UNT Digital Library