ICDP Complex Groundwater Monitoring Plan REV 5 (open access)

ICDP Complex Groundwater Monitoring Plan REV 5

This Groundwater Monitoring Plan, along with the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions, constitutes the sampling and analysis plan for groundwater and perched water monitoring at the Idaho CERCLA Disposal Facility (ICDF). A detection monitoring system was installed in the Snake River Plan Aquifer to comply with substantive requirements of "Releases from Solid Waste Management Units" of the Resource Conservation and Recovery Act. This detection monitoring wells constructed in the Snake River Plain Aquifer.
Date: August 9, 2007
Creator: Cahn, L. S.
System: The UNT Digital Library
INL-Site Idaho Completion Project Long Term Stewardship Strategic Plan (open access)

INL-Site Idaho Completion Project Long Term Stewardship Strategic Plan

This Strategic Plan provides a brief historical overview of ICP long-term stewardship at the INL Site and the major goals and strategies that will drive the continued implementation of long-term stewardship in the future. The specific activities and processes that will be required to implement these goals should be outlined within an implementation plan and within implementing procedures and work plans.
Date: September 17, 2007
Creator: Olaveson, B.
System: The UNT Digital Library
Annual Change Report 2006/2007 (open access)

Annual Change Report 2006/2007

As part of continuing compliance, the U.S. Environmental Protection Agency (EPA) requires the U.S. Department of Energy (DOE) to provide information on any change in conditions or activities pertaining to the disposal system since the most recent compliance application. This requirement is identified in Title 40 Code of Federal Regulations (CFR), Section 194.4(b)(4), which states: "No later than six months after the administrator issues a certification, and at least annually thereafter, the Department shall report to the Administrator, in writing, any changes in conditions or activities pertaining to the disposal system that were not required to be reported by paragraph (b)(3) of this section and that differ from information contained in the most recent compliance application." In meeting the requirement, the DOE provides an annual report each November of all applicable changes under the above requirement. This annual report informs the EPA of changes to information in the most recent compliance recertification (the 2004 Compliance Recertification). Significant planned changes must be reported to the EPA prior to implementation by the DOE. In addition, Title 40 CFR, Section 194.4(b)(3) requires that significant unplanned changes be reported to the EPA within 24 hours or ten days, depending on the severity of the …
Date: November 16, 2007
Creator: Washington Regulatory and Environmental Services
System: The UNT Digital Library
Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2008 (open access)

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2008

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2008 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2008 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2008 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and …
Date: September 1, 2007
Creator: LLC, Elvado Environmental
System: The UNT Digital Library
Climate Change Research: Agencies Have Data-Sharing Policies but Could Do More to Enhance the Availability of Data from Federally Funded Research (open access)

Climate Change Research: Agencies Have Data-Sharing Policies but Could Do More to Enhance the Availability of Data from Federally Funded Research

A letter report issued by the Government Accountability Office with an abstract that begins "Much of the nearly $2 billion annual climate change research budget supports grants from the Department of Energy (DOE), National Aeronautics and Space Administration (NASA), National Oceanic and Atmospheric Administration (NOAA), and National Science Foundation (NSF). Some of the data generated by this research are stored in online archives, but much remains in a less accessible format with individual researchers. As a result, some researchers are concerned about the availability of data. GAO analyzed (1) the key issues that data-sharing policies should address; (2) the data-sharing requirements, policies, and practices for external climate change researchers funded by DOE, NASA, NOAA, and NSF; and (3) the extent to which these agencies foster data sharing. GAO examined requirements, policies, and practices and surveyed the 64 officials managing climate change grants at these agencies."
Date: September 28, 2007
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Homeland Security: U.S. Visitor and Immigrant Status Program's Long-standing Lack of Strategic Direction and Management Controls Needs to Be Addressed (open access)

Homeland Security: U.S. Visitor and Immigrant Status Program's Long-standing Lack of Strategic Direction and Management Controls Needs to Be Addressed

A letter report issued by the Government Accountability Office with an abstract that begins "The Department of Homeland Security (DHS) has established a program known as U.S. Visitor and Immigrant Status Indicator Technology (US-VISIT) to collect, maintain, and share information, including biometric identifiers, on certain foreign nationals who travel to the United States. By congressional mandate, DHS is to develop and submit an expenditure plan for US-VISIT that satisfies certain conditions, including being reviewed by GAO. GAO reviewed the plan to (1) determine if the plan satisfied these conditions, (2) follow up on certain recommendations related to the program, and (3) provide any other observations. To address the mandate, GAO assessed plans and related documentation against federal guidelines and industry standards and interviewed the appropriate DHS officials."
Date: August 31, 2007
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
The Grand Challenge of Managing the Petascale Facility. (open access)

The Grand Challenge of Managing the Petascale Facility.

This report is the result of a study of networks and how they may need to evolve to support petascale leadership computing and science. As Dr. Ray Orbach, director of the Department of Energy's Office of Science, says in the spring 2006 issue of SciDAC Review, 'One remarkable example of growth in unexpected directions has been in high-end computation'. In the same article Dr. Michael Strayer states, 'Moore's law suggests that before the end of the next cycle of SciDAC, we shall see petaflop computers'. Given the Office of Science's strong leadership and support for petascale computing and facilities, we should expect to see petaflop computers in operation in support of science before the end of the decade, and DOE/SC Advanced Scientific Computing Research programs are focused on making this a reality. This study took its lead from this strong focus on petascale computing and the networks required to support such facilities, but it grew to include almost all aspects of the DOE/SC petascale computational and experimental science facilities, all of which will face daunting challenges in managing and analyzing the voluminous amounts of data expected. In addition, trends indicate the increased coupling of unique experimental facilities with computational facilities, …
Date: February 28, 2007
Creator: Aiken, R. J. & Science, Mathematics and Computer
System: The UNT Digital Library
Calendar Year 2006 Groundwater Monitoring Report, U.S Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee (open access)

Calendar Year 2006 Groundwater Monitoring Report, U.S Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2006 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2006 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2006 groundwater and surface water monitoring data in this report were obtained from sampling and analysis …
Date: September 1, 2007
Creator: unknown
System: The UNT Digital Library