WIPP Facility Work Plan for Solid Waste Management Units (open access)

WIPP Facility Work Plan for Solid Waste Management Units

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach …
Date: February 14, 2002
Creator: Westinghouse TRU Solutions LLC
System: The UNT Digital Library
Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002) (open access)

Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)

Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies …
Date: January 14, 2002
Creator: U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)
System: The UNT Digital Library