Chestnut Ridge Borrow Area Waste Pile work plan (open access)

Chestnut Ridge Borrow Area Waste Pile work plan

The US Department of Energy (DOE), through its contractor Martin Marietta Energy Systems, Inc., has constructed a storage facility, the Chestnut Ridge Borrow Area Waste Pile (CRBAWP), for mercury-contaminated soil excavated from the Oak Ridge Civic Center properties and the Oak Ridge Sewer Line Beltway. Excavation of the soil from the Civic Center began in September 1984 and was completed in early 1985. Similar soils from other areas of the city were added to the pile until 1987. Approximately 3000 yd{sup 3} are stored at the present time. An Interim Status RCRA permit was initially sought for this facility. Samples from the waste pile passed the Extraction Procedure Toxicity Test (EP Tox). The Tennessee Department of Health and Environment (now the Tennessee Department of Conservation-TDC) denied the permit based on their conclusion that the waste was not a RCRA-regulated waste. On September 25, 1990 the Toxicity Characteristic Leaching Procedure (TCLP) superseded the EP Tox test. TCLP tests are not proposed to satisfy a request by TDC and to make a final determination of the nature of the soils in order to close the CRBAWP as a solid waste disposal facility under Tennessee State rule 1200-1-7-.04. The objectives of this work …
Date: August 1, 1991
Creator: Johnson, R.
Object Type: Report
System: The UNT Digital Library
Data management for environmental restoration (open access)

Data management for environmental restoration

The mission for data management for the Environmental Restoration Department (ERD) at the Idaho National Engineering Laboratory (INEL), is to deliver quality assured data for decision making. Data management must meet regulatory requirements by developing appropriate technical capabilities. This paper describes the requirements and how they are being met at the INEL.
Date: August 1, 1992
Creator: Yurman, D. J.
Object Type: Article
System: The UNT Digital Library
Hanford Environmental Dose Reconstruction Project monthly report, May 1992 (open access)

Hanford Environmental Dose Reconstruction Project monthly report, May 1992

The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These task correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates.
Date: August 1, 1992
Creator: Finch, S. M. & McMakin, A. H.
Object Type: Report
System: The UNT Digital Library
Project plan for the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee (open access)

Project plan for the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee

The Background Soil characterization Project (BSCP) will provide background concentration levels of selected metals, organic compounds, and radionuclides in soils from uncontaminated on-site areas at the Oak Ridge Reservation (ORR), and off-site in the western part of Roane County and the eastern part of Anderson County. The BSCP will establish a database, recommend how to use the data for contaminated site assessment, and provide estimates of the potential human health and environmental risks associated with the background level concentrations of potentially hazardous constituents.
Date: August 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Project plan for the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee (open access)

Project plan for the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee

The Background Soil characterization Project (BSCP) will provide background concentration levels of selected metals, organic compounds, and radionuclides in soils from uncontaminated on-site areas at the Oak Ridge Reservation (ORR), and off-site in the western part of Roane County and the eastern part of Anderson County. The BSCP will establish a database, recommend how to use the data for contaminated site assessment, and provide estimates of the potential human health and environmental risks associated with the background level concentrations of potentially hazardous constituents.
Date: August 1, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Data management plan for the Oak Ridge Environmental Information System, Version 1. 1 (open access)

Data management plan for the Oak Ridge Environmental Information System, Version 1. 1

The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.
Date: August 4, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Data management plan for the Oak Ridge Environmental Information System, Version 1.1. Enviornmental Restoration Program (open access)

Data management plan for the Oak Ridge Environmental Information System, Version 1.1. Enviornmental Restoration Program

The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.
Date: August 4, 1992
Creator: unknown
Object Type: Report
System: The UNT Digital Library
100 Area Excavation Treatability Test Plan. Revision 1 (open access)

100 Area Excavation Treatability Test Plan. Revision 1

This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992f). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications. The most recent applications are excavation of the 618-9 burial ground and partial remediation of the 316-5 process trenches (DOE-RL 1992a, 1992b). Both projects included excavation of soil and dust control (using water sprays). Excavation is a well-developed technology and equipment is readily available; however, certain aspects of the excavation process require testing before use in full-scale operations. These include the following: Measurement and control of excavation-generated dust and airborne contamination; verification of field analytical system capabilities; demonstration of soil removal techniques specific to the 100 Area waste site types and configurations. The execution of this treatability test may produce …
Date: August 1, 1993
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee (open access)

Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee

This characterization plan has been developed as part of the U.S. Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.
Date: August 1, 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Final report on the energy edge impact evaluation of 28 new, low-energy commercial buildings (open access)

Final report on the energy edge impact evaluation of 28 new, low-energy commercial buildings

This report presents the findings of the Energy Edge Impact Evaluation. It is the fourth and final report in a series of project impact evaluation reports. Energy Edge is a research-oriented demonstration of energy efficiency in 28 new commercial buildings. Beginning in 1985,the project, sponsored by the Bonneville Power Administration (BPA), was developed to evaluate the potential for electricity conservation in new commercial buildings. By focusing on the construction of new commercial buildings, Energy Edge meets the region`s goal of capturing otherwise lost opportunities to accomplish energy conservation. That is, the best time to add an energy-efficiency measure to a building is during the construction phase.
Date: August 1, 1994
Creator: Piette, M. A.; Diamond, R. & Nordman, B.
Object Type: Report
System: The UNT Digital Library
An independent verification and validation of the Future Theater Level Model conceptual model (open access)

An independent verification and validation of the Future Theater Level Model conceptual model

This report describes the methodology and results of independent verification and validation performed on a combat model in its design stage. The combat model is the Future Theater Level Model (FTLM), under development by The Joint Staff/J-8. J-8 has undertaken its development to provide an analysis tool that addresses the uncertainties of combat more directly than previous models and yields more rapid study results. The methodology adopted for this verification and validation consisted of document analyses. Included were detailed examination of the FTLM design documents (at all stages of development), the FTLM Mission Needs Statement, and selected documentation for other theater level combat models. These documents were compared to assess the FTLM as to its design stage, its purpose as an analytical combat model, and its capabilities as specified in the Mission Needs Statement. The conceptual design passed those tests. The recommendations included specific modifications as well as a recommendation for continued development. The methodology is significant because independent verification and validation have not been previously reported as being performed on a combat model in its design stage. The results are significant because The Joint Staff/J-8 will be using the recommendations from this study in determining whether to proceed with …
Date: August 1, 1994
Creator: Hartley, D. S., III; Kruse, K. L.; Martellaro, A. J.; Packard, S. L.; Thomas, B. Jr. & Turley, V. K.
Object Type: Report
System: The UNT Digital Library
Pilot-scale treatability test plan for the 200-BP-5 operable unit (open access)

Pilot-scale treatability test plan for the 200-BP-5 operable unit

This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable …
Date: August 1, 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Site investigation report for Waste Area Grouping 4 at Oak Ridge National Laboratory. Volume 1, Text: Environmental Restoration Program (open access)

Site investigation report for Waste Area Grouping 4 at Oak Ridge National Laboratory. Volume 1, Text: Environmental Restoration Program

Waste Area Grouping (WAG) 4 is one of 17 WAGs within and associated with Oak Ridge National Laboratory (ORNL). WAG 4 is located south of the main facility along Lagoon Road. WAG 4 consists of three separate areas: Solid Waste Storage Area (SWSA) 4, a shallow-land-burial ground containing radioactive and potentially hazardous wastes; an experimental Pilot Pit Area, which includes a pilot-scale testing pit; and sections of two abandoned underground pipelines used for transporting liquid, low-level, radioactive waste. SWSA 4 is the largest site at WAG 4, covering approximately 23 acres. In the 1950s, SWSA 4 received a variety of low- and high-activity wastes, including transuranic wastes, all buried in trenches and auger holes. Recent surface water data, collected during monitoring of the tributary to White Oak Creek as part of WAG 2 investigations as well as during previous studies conducted at WAG 4, indicate that a significant amount of {sup 90}Sr is being released from the old burial trenches in SWSA 4. This release represents a significant portion of the ORNL off-site risk (DOE 1993). With recent corrective measures the proportion of the release has increased in 1995. A detailed discussion of the site history and previous investigations is …
Date: August 1, 1995
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection (open access)

Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection

The continuous collection of groundwater data is a basic and necessary part of Lockeheed Martin Energy Systems` ORNL Environmental Restoration Area-Wide Groundwater Program. Continuous groundwater data consist primarily of continually recorded groundwater levels, and in some instances, specific conductivity, pH, and/or temperature measurements. These data will be collected throughout the ORNL site. This Work Plan (WP) addresses technical objectives, equipment requirements, procedures, documentation requirements, and technical instructions for the acquisition of the continuous groundwater data. Intent of this WP is to provide an approved document that meets all the necessary requirements while retaining the flexibility necessary to effectively address ORNL`s groundwater problems.
Date: August 1, 1995
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri (open access)

Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site …
Date: August 1995
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Tank characterization report for single-shell tank 241-BY-105 (open access)

Tank characterization report for single-shell tank 241-BY-105

This document summarizes the information on the historical uses, present status, and the sampling and analysis results of waste stored in Tank 241-BY-105. Sampling and analyses were completed to meet Safety Screening, Ferrocyanide and Historical Data Quality Objectives. This report supports the requirements of Tri-Party Agreement Milestone M-44-09.
Date: August 30, 1996
Creator: Field, J. G.
Object Type: Report
System: The UNT Digital Library
Evaluation of Calendar Year 1996 groundwater and surface water quality data for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee (open access)

Evaluation of Calendar Year 1996 groundwater and surface water quality data for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

This report presents an evaluation of the groundwater monitoring data obtained in the Bear Creek Hydrogeologic Regime (Bear Creek Regime) during calendar year (CY) 1996. The monitoring data were collected for the multiple programmatic purposes of the Y-12 Plant Groundwater Protection Program (GWPP) and have been reported in Calendar Year 1996 Annual Groundwater Monitoring Report for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee. The Annual Monitoring report presents only the results of the monitoring data evaluations required for waste management sites addressed under the Resource Conservation and Recovery Act (RCRA) post-closure permit for the Bear Creek Regime. The Annual Monitoring Report also serves as a consolidated reference for the groundwater and surface water monitoring data obtained throughout the Bear Creek Regime under the auspices of the Y-12 GWPP. This report provides an evaluation of the CY 1996 monitoring data with an emphasis on regime-wide groundwater and surface water quality and long-term concentration trends of regulated and non-regulated monitoring parameters.
Date: August 1, 1997
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Evaluation of calendar year 1996 groundwater and surface water quality data for the Chesnut Ridge Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee (open access)

Evaluation of calendar year 1996 groundwater and surface water quality data for the Chesnut Ridge Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

This report presents an evaluation of the groundwater monitoring data obtained in the Chesnut Ridge Hydrogeologic Regime (Chesnut Ridge Regime) during calendar year (CY) 1996. The Chesnut Ridge Regime encompasses a section of Chesnut Ridge bordered by the US Department of Energy (DOE) Y-12 Plant in Bear Creek Valley (BCV) to the north, Scarboro Road to the east, Bethel Valley Road to the south, and an unnamed drainage basin southwest of the Y-12 Plant. Groundwater quality monitoring is performed at hazardous and nonhazardous waste management facilities in the regime under the auspices of the Y-12 Plant Groundwater Protection Program (GWPP). The CY 1996 monitoring data are presented in Calendar Year 1996 Annual Groundwater Monitoring Report for the Chesnut Ridge Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee, along with the required evaluations of applicable site-specific monitoring data (AJA Technical Services, Inc. 1997a). This report provides additional evaluation of the CY 1996 data with an emphasis on regime-wide groundwater geochemistry and long-term concentration trends of regulated and non-regulated monitoring parameters.
Date: August 1, 1997
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Recommendations for Guidelines for EMF Personal Exposure Measurements, Rapid Project #4 (open access)

Recommendations for Guidelines for EMF Personal Exposure Measurements, Rapid Project #4

The purpose of developing guidelines for electric and magnetic field (EMF) personal exposure measurements (lF'EM) is to ensure reliable and comparable data across I?EM studies. Study techniques may vary due to different populations or objectives, but the resulting data should be consistently reported and comparable, to the extent possible. Any guideline must allow creativity by the research-oriented investigator and provide specific guidance to industrial hygienists or other results-oriented investigators, requiring a standard protocol. Recognizing measurement studies with different purposes is an important aspect of these recommendations. The guidelines presented here intend to produce comparable data across studies while remaining flexible. The recommendations for designing and implementing an EMF PEM program describe a three-stage process. The first step is to clearly state the purpose of the PEM program. The next stage addresses the fundamental elements of an EMF PEM study, including an assessment of the scientific and organizational resources that will be required. This process is codified in a written study plan. These stages are described in 1 Section 5 of this report. The third stage of a PEM study involves the design, implementation and documentation of specific procedures and protocols fo~ sampling strategies, selection of measurement parameters; instrumentation, measurement and …
Date: August 1, 1997
Creator: T. Dan Bracken, Inc.
Object Type: Report
System: The UNT Digital Library
Tank farms compacted low-level waste (open access)

Tank farms compacted low-level waste

This report describes the process of Low-Level Waste (LLW) volume reduction by compaction. Also included is the data used for characterization of LLW destined for compaction. Scaling factors (ratios) are formed based on data contained in this report.
Date: August 1, 1997
Creator: Hetzer, D. C.
Object Type: Report
System: The UNT Digital Library
Fiscal year 1999 waste information requirements document (open access)

Fiscal year 1999 waste information requirements document

The Waste Information Requirements Document (WIRD) has the following purposes: To describe the overall drivers that require characterization information and to document their source; To define how characterization is going to satisfy the drivers, close issues, and measure and report progress; and To describe deliverables and acceptance criteria for characterization. Characterization information is required to maintain regulatory compliance, perform operations and maintenance, resolve safety issues, and prepare for disposal of waste. Commitments addressing these requirements are derived from the Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement; the Recommendation 93-5 Implementation Plan (DOE-RL 1996a) to the Defense Nuclear Facilities Safety Board (DNFSB); and other requirement sources listed in Section 2.0. The Waste Information Requirements Document replaces the tank waste analysis plans and the tank characterization plan previously required by the Tri-Party Agreement, Milestone M-44-01 and M-44-02 series.
Date: August 10, 1998
Creator: Adams, M. R.
Object Type: Report
System: The UNT Digital Library
Data management plan for HANDI 2000 business management system (open access)

Data management plan for HANDI 2000 business management system

The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of PassPort (PP) and PeopleSoft (PS) software, supports finance, supply and chemical management/Material Safety Data Sheet.
Date: August 25, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Software configuration management plan for HANDI 2000 business management system (open access)

Software configuration management plan for HANDI 2000 business management system

The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.
Date: August 25, 1998
Creator: Wilson, D.
Object Type: Report
System: The UNT Digital Library
Site-Specific Health and Safety Plan for Work Activities at the Natural and Accelerated Bioremediation Research (NABIR) Field Research Center (FRC), Oak Ridge, Tennessee (open access)

Site-Specific Health and Safety Plan for Work Activities at the Natural and Accelerated Bioremediation Research (NABIR) Field Research Center (FRC), Oak Ridge, Tennessee

None
Date: August 1, 2000
Creator: Watson, D. B. & Quarles, H. D.
Object Type: Report