Chestnut Ridge Borrow Area Waste Pile work plan (open access)

Chestnut Ridge Borrow Area Waste Pile work plan

The US Department of Energy (DOE), through its contractor Martin Marietta Energy Systems, Inc., has constructed a storage facility, the Chestnut Ridge Borrow Area Waste Pile (CRBAWP), for mercury-contaminated soil excavated from the Oak Ridge Civic Center properties and the Oak Ridge Sewer Line Beltway. Excavation of the soil from the Civic Center began in September 1984 and was completed in early 1985. Similar soils from other areas of the city were added to the pile until 1987. Approximately 3000 yd{sup 3} are stored at the present time. An Interim Status RCRA permit was initially sought for this facility. Samples from the waste pile passed the Extraction Procedure Toxicity Test (EP Tox). The Tennessee Department of Health and Environment (now the Tennessee Department of Conservation-TDC) denied the permit based on their conclusion that the waste was not a RCRA-regulated waste. On September 25, 1990 the Toxicity Characteristic Leaching Procedure (TCLP) superseded the EP Tox test. TCLP tests are not proposed to satisfy a request by TDC and to make a final determination of the nature of the soils in order to close the CRBAWP as a solid waste disposal facility under Tennessee State rule 1200-1-7-.04. The objectives of this work …
Date: August 1, 1991
Creator: Johnson, R.
System: The UNT Digital Library