Oak Ridge Y-12 Plant groundwater protection program management plan (open access)

Oak Ridge Y-12 Plant groundwater protection program management plan

The Oak Ridge Y- 1 2 Plant (Y-12 Plant) is owned by the United States Department of Energy (DOE) and managed by Lockheed Martin Energy Systems, Inc. (Energy Systems) under contract No. DE-AC05-84OR21400. The Y-12 Plant Groundwater Protection Program (GWPP), which was initiated in 1975, provides for the protection of groundwater resources consistent with Federal, State, and local regulations, and in accordance with DOE orders and Energy Systems policies and procedures. The Y-12 Plant is located in Anderson County, Tennessee, and is within the corporate limits of the City of Oak Ridge. The Y-12 Plant is one of three major DOE complexes that comprise the 37,000-acre Oak Ridge Reservation (ORR) located in Anderson and Roane counties. The Y-12 Plant is located in Bear Creek Valley at an elevation of about 950 feet (ft) above sea level. Bear Creek Valley is bounded on the northwest and southeast, and is isolated from populated areas of Oak Ridge, by parallel ridges that rise about 300 ft above the valley floor. The Y-12 Plant and its fenced buffer area are about 0.6 mile wide by 3.2 miles long and cover approximately 4,900 acres. The main industrialized section encompasses approximately 800 acres.
Date: June 1, 1996
Creator: unknown
System: The UNT Digital Library
Spent nuclear fuel project high-level information management plan (open access)

Spent nuclear fuel project high-level information management plan

This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in …
Date: September 13, 1996
Creator: Main, G.C.
System: The UNT Digital Library
Technical specification for transferring National Pollutant Discharge Elimination System water data to the Oak Ridge Environmental Information System (open access)

Technical specification for transferring National Pollutant Discharge Elimination System water data to the Oak Ridge Environmental Information System

The primary goal of this technical specification is to meet the consolidated environmental data requirements defined by the Federal Facility (FFA) and the Tennessee Oversight Agreement (TOA) as they pertain to NPDES surface water data maintained in Oak Ridge, Tennessee, by the Department of Energy`s Maintenance and Operations (M&O) contractor Martin Marietta Energy Systems and prime contractors to DOE. This technical specification describes the organizational responsibilities for getting NPDES data into OREIS, describes the logical data transfer file required from NPDES, addresses business rules and submission rules, describes the physical data transfer file, addresses configuration control of this technical specification, and addresses required changes to the current OREIS data base structure due to the requirements of NPDES.
Date: November 1996
Creator: unknown
System: The UNT Digital Library
Quality Assurance Plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (open access)

Quality Assurance Plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

This quality assurance plan summarizes requirements for conducting work on the Upper East 9 Fork Poplar Creek (UEFPC) Characterization Area (CA). The reader is referred to the Expanded Task Work Agreement for Upper East Fork Poplar Creek Characterization Area, Remedial Investigation/Feasibility Study (RI/FS) for details regarding the activities, roles, and responsibilities summarized here. UEFPC is designated a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site and thus requires a remedial investigation (RI) and a feasibility study (FS). The RI objectives are to evaluate the nature and extent of known and suspected contaminates, to provide data to perform baseline ecological and human health risk assessments, and to support development and evaluation of remedial alternatives for the FS,. Existing data will be used as much as possible. Additional sampling may be required to fill data gaps. The goal of the RI is to prioritize the major sources of contaminants to exit pathways and to understand their characteristics for risk characterization and development of remedial alternatives. The FS objectives are to investigate technologies and develop and evaluate alternatives based on 2031 CERCLA guidance.
Date: December 1, 1996
Creator: unknown
System: The UNT Digital Library
Function analysis for waste information systems (open access)

Function analysis for waste information systems

This study has a two-fold purpose. It seeks to identify the functional requirements of a waste tracking information system and to find feasible alternatives for meeting those requirements on the Oak Ridge Reservation (ORR) and the Portsmouth (PORTS) and Paducah (PGDP) facilities; identify options that offer potential cost savings to the US government and also show opportunities for improved efficiency and effectiveness in managing waste information; and, finally, to recommend a practical course of action that can be immediately initiated. In addition to identifying relevant requirements, it also identifies any existing requirements that are currently not being completely met. Another aim of this study is to carry out preliminary benchmarking by contacting representative companies about their strategic directions in waste information. The information obtained from representatives of these organizations is contained in an appendix to the document; a full benchmarking effort, however, is beyond the intended scope of this study.
Date: April 1, 1996
Creator: Sexton, J. L.; Neal, C. T.; Heath, T. C. & Starling, C. D.
System: The UNT Digital Library
Sampling and Analysis Plan for White Oak Creek Watershed Remedial Investigation supplemental sampling, Oak Ridge National Laboratory, Oak Ridge, Tennessee (open access)

Sampling and Analysis Plan for White Oak Creek Watershed Remedial Investigation supplemental sampling, Oak Ridge National Laboratory, Oak Ridge, Tennessee

This Sampling and Analysis (SAP) presents the project requirements for proposed soil sampling to support the White Oak Creek Remedial Investigation/Feasibility Study at Oak Ridge National Laboratory. During the Data Quality Objectives process for the project, it was determined that limited surface soils sampling is need to supplement the historical environmental characterization database. The primary driver for the additional sampling is the need to identify potential human health and ecological risks at various sites that have not yet proceeded through a remedial investigation. These sites include Waste Area Grouping (WAG)3, WAG 4, WAG 7, and WAG 9. WAG 4 efforts are limited to nonradiological characterization since recent seep characterization activities at the WAG have defined the radiological problem there.
Date: May 1, 1996
Creator: unknown
System: The UNT Digital Library
Tank farms compacted low level waste (open access)

Tank farms compacted low level waste

This report describes the process of Low Level Waste (LLW) volume reduction by compaction. Also included is the data used for characterization of LLW destined for compaction. Scaling factors (ratios) are formed based on data contained in this report.
Date: July 1, 1996
Creator: Waters, M. S.
System: The UNT Digital Library
RFI/RI Work Plan for 716-A Motor Shops Seepage Basin (open access)

RFI/RI Work Plan for 716-A Motor Shops Seepage Basin

This work plan is prepared for the 716-A Motor Shops Seepage Basin, which is located in the A-Area at the Savannah River Site in Aiken, South Carolina.
Date: April 2, 1996
Creator: Palmer, E.
System: The UNT Digital Library
Hanford Facility RCRA permit handbook (open access)

Hanford Facility RCRA permit handbook

Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.
Date: March 1, 1996
Creator: unknown
System: The UNT Digital Library
Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee (open access)

Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.
Date: September 1, 1996
Creator: unknown
System: The UNT Digital Library
Treatability study on the Bear Creek Valley characterization area at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Phase II work plan for S-3 site contaminated groundwater interception--in-field media evaluation and groundwater capture methods (open access)

Treatability study on the Bear Creek Valley characterization area at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Phase II work plan for S-3 site contaminated groundwater interception--in-field media evaluation and groundwater capture methods

A treatability study is being conducted to support implementation:of early actions at the S-3 Site in the Bear Creek Valley (BCV) Characterization Area (CA). The objectives of the early actions Will be (1) to reduce concentrations of uranium and nitrate in Bear Creek and (2) to reduce contaminants of concern in North Tributary (NT)-1 and NT-2. The BCV CA is located within the US DOE`s Oak Ridge Reservation in Tennessee. Hazardous and radioactive materials from the Y-12 Plant operations were, disposed of at various sites within BCV. Groundwater and surface water in the BCV CA have been contaminated. The remedial investigation (RI) for the BCV CA identified that the greatest mass flux of contaminants from the various sources migrates via groundwater at the source and discharges to surface water in Bear Creek and its tributaries. In the RI, the combined discharge from the S-3 Site and the Boneyard/Burnyard (BYBY) was identified as accounting for 75% of the cancer risk and more than 80% of the chemical toxicity to Potential downgradient human receptors. In addition, the S-3 Site has caused degradation of surface water quality in upper Bear Creek and two of its tributaries. The BCV CA treatability study focuses on …
Date: December 1, 1996
Creator: unknown
System: The UNT Digital Library
Tank waste remediation system characterization project quality policies (open access)

Tank waste remediation system characterization project quality policies

This quality plan describes the system used by Characterization Project management to achieve quality. This plan is comprised on eleven quality policies which, when taken together, form a management system deployed to achieve quality. This quality management system is based on the customer`s quality requirements known as the `RULE`, 10 CFR 830.120, Quality Assurance.
Date: July 31, 1996
Creator: Trible, T. C.
System: The UNT Digital Library
Y-12 Site environmental protection program implementation plan (EPPIP) (open access)

Y-12 Site environmental protection program implementation plan (EPPIP)

The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.
Date: November 1, 1996
Creator: unknown
System: The UNT Digital Library
Annual Report on Environmental Monitoring Activities for FY 1995 (Baseline Year) at Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (open access)

Annual Report on Environmental Monitoring Activities for FY 1995 (Baseline Year) at Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

This report describes baseline contaminant release conditions for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). The sampling approach and data analysis methods used to establish baseline conditions were presented in ``Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (EMP).`` As outlined in the EMP, the purpose of the baseline monitoring year at WAG 6 was to determine the annual contaminant releases from the site during fiscal year 1995 (FY95) against which any potential changes in releases over time could be compared. The baseline year data set provides a comprehensive understanding of release conditions from all major waste units in the WAG through each major contaminant transport pathway. Due to a mandate to reduce all monitoring work, WAG 6 monitoring was scaled back and reporting efforts on the baseline year results are being minimized. This report presents the quantified baseline year contaminant flux conditions for the site and briefly summarizes other findings. All baseline data cited in this report will reside in the Oak Ridge Environmental Information system (OREIS) database, and will be available for use in future years as the need arises to identify potential release changes.
Date: June 1, 1996
Creator: unknown
System: The UNT Digital Library
1996 Regional Assessment of Water Quality in the Nueces Coastal Basins (open access)

1996 Regional Assessment of Water Quality in the Nueces Coastal Basins

A regional water quality assessment of the Nueces River Coastal Basins in 1996.
Date: October 1996
Creator: Texas Natural Resource Conservation Commission
System: The Portal to Texas History
Tank characterization report for single-shell tank 241-BY-105 (open access)

Tank characterization report for single-shell tank 241-BY-105

This document summarizes the information on the historical uses, present status, and the sampling and analysis results of waste stored in Tank 241-BY-105. Sampling and analyses were completed to meet Safety Screening, Ferrocyanide and Historical Data Quality Objectives. This report supports the requirements of Tri-Party Agreement Milestone M-44-09.
Date: August 30, 1996
Creator: Field, J. G.
System: The UNT Digital Library
1995 Site environmental report, January 1995--December 1995 (open access)

1995 Site environmental report, January 1995--December 1995

This report provides information about environmental programs and compliance with environmental regulations in calendar year 1995 (CY95) at the Stanford Linear Accelerator Center (SLAC). SLAC is a national laboratory operated by Stanford University under contract with the US Department of Energy (DOE) and is devoted to experimental and theoretical research in elementary particle physics, in basic sciences using synchrotron radiation, and in accelerator physics and technology. SLAC`s Environment, Safety, and Health (ES&H) Division consists of five departments and a Program Planning Office (PPO). Their shared goal is to help ensure that SLAC operates in compliance with federal, state, and local regulations, as well as DOE Orders related to environment, safety, and health. The five departments are: (1) Environmental Protection and Restoration (EPR), (2) Operational Health Physics (OHP), (3) Radiation Physics (RP), (4) Safety, Health, and Assurance (SHA), and (5) Waste Management (WM). The EPR Department oversees the majority of SLAC`s environmental programs, including programs for environmental restoration; waste minimization; air quality; storm water and industrial wastewater; polychlorinated biphenyls (PCBs); and groundwater. The WM Department coordinates disposal of hazardous, radioactive, and mixed waste. The OHP Department, in cooperation with the EPR Department, oversees environmental radiological monitoring and dosimetry at SLAC. The …
Date: September 1, 1996
Creator: unknown
System: The UNT Digital Library
The Office of Environmental Management technical reports: A bibliography (open access)

The Office of Environmental Management technical reports: A bibliography

The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1994 through June 30, 1995. This information is divided into the following categories: Focus Areas, Cross-Cutting Programs, and Support Programs. In addition, a category for general information is included. EM`s Office of Science and Technology sponsors this bibliography.
Date: January 1, 1996
Creator: unknown
System: The UNT Digital Library
Project W-314 DST and DCRT instrument and control systems, initial assessment (open access)

Project W-314 DST and DCRT instrument and control systems, initial assessment

This report contains an assessment of the instrument and control systems in the Double Shell Tank Farms and the 244-A DCRT. The assessment report contains data from physical inspection activities and an overall engineering assessment of the instruments and control systems in use in the Double Shell Tanks.
Date: January 18, 1996
Creator: Acree, C. D.
System: The UNT Digital Library
Approved Site Treatment Plan, Volumes 1 and 2. Revision 4 (open access)

Approved Site Treatment Plan, Volumes 1 and 2. Revision 4

The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation …
Date: March 22, 1996
Creator: Helmich, E.H.; Molen, G. & Noller, D.
System: The UNT Digital Library
Quality assurance/quality control summary report on phase 2 of the Clinch River remedial investigation at the Oak Ridge Reservation, Oak Ridge, Tennessee (open access)

Quality assurance/quality control summary report on phase 2 of the Clinch River remedial investigation at the Oak Ridge Reservation, Oak Ridge, Tennessee

Quality assurance (QA) objectives for Phase 2 were that (1) scientific data generated would withstand scientific and legal scrutiny; (2) data would be gathered using appropriate procedures for sample collection, sample handling and security, chain of custody, laboratory analyses, and data reporting; (3) data would be of known precision and accuracy; and (4) data would meet data quality objectives defined in the Phase 2 Sampling and Analysis Plan. A review of the QA systems and quality control (QC) data associated with the Phase 2 investigation is presented to evaluate whether the data were of sufficient quality to satisfy Phase 2 objectives. The data quality indicators of precision, accuracy, representativeness, comparability, completeness, and sensitivity were evaluated to determine any limitations associated with the data. Data were flagged with qualifiers that were associated with appropriate reason codes and documentation relating the qualifiers to the reviewer of the data. These qualifiers were then consolidated into an overall final qualifier to represent the quality of the data to the end user. In summary, reproducible, precise, and accurate measurements consistent with CRRI objectives and the limitations of the sampling and analytical procedures used were obtained for the data collected in support of the Phase 2 …
Date: December 1, 1996
Creator: Holladay, S. K.; Anderson, H. M.; Benson, S. B.; Bevelhimer, M. S.; Brandt, C. C.; Chavannes, C. M. et al.
System: The UNT Digital Library
Calendar year 1995 groundwater quality report for the Chestnut Ridge Hydrogeological Regime, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. 1995 Groundwater quality data and calculated rate of contaminant migration (open access)

Calendar year 1995 groundwater quality report for the Chestnut Ridge Hydrogeological Regime, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. 1995 Groundwater quality data and calculated rate of contaminant migration

This annual groundwater quality report (GWQR) contains groundwater quality data obtained during the 1995 calendar year (CY) at several hazardous and nonhazardous waste management facilities associated with the U.S. Department of Energy (DOE) Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee. These sites are located south of the Y-12 Plant in the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime), which is one of three regimes defined for the purposes of groundwater quality monitoring at the Y-12 Plant. The Environmental Management Department of the Y-12 Plant Health, Safety, Environment, and Accountability (HSEA) Organization manages the groundwater monitoring activities in each regime as part of the Y-12 Plant Groundwater Protection Program (GWPP). The U.S. Environmental Protection Agency (EPA) identification number for the Y-12 Plant is TN.
Date: February 1, 1996
Creator: unknown
System: The UNT Digital Library
Calendar year 1995 groundwater quality report for the Bear Creek Hydrogeologic Regime, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (open access)

Calendar year 1995 groundwater quality report for the Bear Creek Hydrogeologic Regime, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

This annual groundwater quality report (GWQR) contains groundwater and surface water quality data obtained during the 1995 calendar year (CY) at several hazardous and nonhazardous waste management facilities associated with the Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee. The sites addressed by this document are located in Bear Creek Valley (BCV) west of the Y-12 Plant complex within the Bear Creek Hydrogeologic Regime. The Bear Creek Regime is one of three hydrogeologic regimes defined for the purposes of groundwater and surface water quality monitoring at the Y-12 Plant. The purpose of the Groundwater Protection Program (GWPP) is to characterize the hydrogeology and to monitor groundwater quality at the Y-12 Plant and surrounding area to provide for protection of groundwater resources consistent with federal, state, and local requirements. Part 1 (this report) consists primarily of data appendices and serves as a reference for the groundwater quality data obtained each CY under the lead of the Y-12 Plant GWPP. Part 2 of the report, to be issued mid-year, will contain an evaluation of the data with respect to regime-wide groundwater quality, present the findings and status of ongoing hydrogeologic studies, describe changes in monitoring …
Date: February 1, 1996
Creator: unknown
System: The UNT Digital Library
Baseline Risk Assessment for the F-Area Burning/Rubble Pits and Rubble Pit (open access)

Baseline Risk Assessment for the F-Area Burning/Rubble Pits and Rubble Pit

This document provides an overview of the Savannah River Site (SRS) and a description of the F-Area Burning/Rubble Pits (BRPs) and Rubble Pit (RP) unit. It also describes the objectives and scope of the baseline risk assessment (BRA).
Date: March 1, 1996
Creator: Palmer, E.
System: The UNT Digital Library