States

Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program (BMAP) Plan (open access)

Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program (BMAP) Plan

The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y- 12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional toxicity testing if initial results indicate low survival or reproduction) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is observed). …
Date: October 1, 1998
Creator: Adams, S. M.; Brandt, C. C.; Christensen, S. W.; Cicerone, D. S.; Greeley, M. S., Jr.; Hill, W. R. et al.
Object Type: Report
System: The UNT Digital Library
Fiscal year 1999 waste information requirements document (open access)

Fiscal year 1999 waste information requirements document

The Waste Information Requirements Document (WIRD) has the following purposes: To describe the overall drivers that require characterization information and to document their source; To define how characterization is going to satisfy the drivers, close issues, and measure and report progress; and To describe deliverables and acceptance criteria for characterization. Characterization information is required to maintain regulatory compliance, perform operations and maintenance, resolve safety issues, and prepare for disposal of waste. Commitments addressing these requirements are derived from the Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement; the Recommendation 93-5 Implementation Plan (DOE-RL 1996a) to the Defense Nuclear Facilities Safety Board (DNFSB); and other requirement sources listed in Section 2.0. The Waste Information Requirements Document replaces the tank waste analysis plans and the tank characterization plan previously required by the Tri-Party Agreement, Milestone M-44-01 and M-44-02 series.
Date: August 10, 1998
Creator: Adams, M. R.
Object Type: Report
System: The UNT Digital Library
Oak Ridge Y-12 Plant biological monitoring and abatement program (BMAP) plan (open access)

Oak Ridge Y-12 Plant biological monitoring and abatement program (BMAP) plan

The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y-12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided, but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas or a reduction in sampling intensity in others. By using the results of previous monitoring efforts to define the current program and to guide them in the development of future studies, an effective integrated …
Date: February 1, 1998
Creator: Adams, S.M.; Brandt, C.C. & Cicerone, D.S.
Object Type: Report
System: The UNT Digital Library
Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri (open access)

Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site …
Date: August 1995
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Tank farms compacted low level waste (open access)

Tank farms compacted low level waste

This report describes the process of Low Level Waste (LLW) volume reduction by compaction. Also included is the data used for characterization of LLW destined for compaction. Scaling factors (ratios) are formed based on data contained in this report.
Date: July 1, 1996
Creator: Waters, M. S.
Object Type: Report
System: The UNT Digital Library
Production roll out plan for HANDI 2000 business management system (open access)

Production roll out plan for HANDI 2000 business management system

The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of Passport (PP) and PeopleSoft (PS) software, supports finance, supply, human resources, and payroll activities under the current PHMC direction. The PP software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheets (MSDS). The PS software is an integrated application for Projects, General Ledger, Human Resources Training, Payroll, and Base Benefits. This set of software constitutes the Business Management System (BMS) and MSDS, a subset of the HANDI 2000 suite of systems. The primary objective of the Production Roll Out Plan is to communicate the methods and schedules for implementation and roll out to end users of BMS.
Date: September 29, 1998
Creator: Adams, D. E.
Object Type: Report
System: The UNT Digital Library
Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program. Volume 2, Interim business systems guidance (open access)

Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program. Volume 2, Interim business systems guidance

As part of the Environmental Restoration Program at Martin Marietta, IEM (Information Engineering Methodology) was developed as part of a complete and integrated approach to the progressive development and subsequent maintenance of automated data sharing systems. This approach is centered around the organization`s objectives, inherent data relationships, and business practices. IEM provides the Information Systems community with a tool kit of disciplined techniques supported by automated tools. It includes seven stages: Information Strategy Planning; Business Area Analysis; Business System Design; Technical Design; Construction; Transition; Production. This document focuses on the Business Systems Architecture.
Date: September 1, 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Engineering task plan for the ultrasonic inspection of hanford double-shell tanks (open access)

Engineering task plan for the ultrasonic inspection of hanford double-shell tanks

This document facilitates the ultrasonic examination of Hanford Double-Shell Tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work (SOW) for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptances criteria be discovered.
Date: June 23, 1999
Creator: LYSHER, R.W.
Object Type: Report
System: The UNT Digital Library
Calendar Year 1997 Annual Groundwater Monitoring Report For The Upper East Fork Poplar Creek Hydrogeologic Regime At The U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee (open access)

Calendar Year 1997 Annual Groundwater Monitoring Report For The Upper East Fork Poplar Creek Hydrogeologic Regime At The U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

This report contains the groundwater monitoring data obtained during calendar year (CY) 1997 in compliance with the Resource Conservation Wd Recovery Act (RCRA) post-closure permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) at the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. Issued by the Tennessee Department of Environment and Conservation (TDEC), the PCP defines the RCRA post-closure corrective action monitoring requirements for the portion of the groundwater contaminant plume that has migrated into the East Fork Regime ftom the S-3 Ponds, a closed RCW-regulated former surface impoundment located in Bear Creek Valley near the west end of the Y-12 Plant. In addition to the RCIL4 post-closure corrective action monitoring results, this report contains the groundwater and surface water monitoring data obtained during CY 1997 to fulfill requirements of DOE Order 5400.1.
Date: February 1, 1998
Creator: Jones, S. B.
Object Type: Report
System: The UNT Digital Library
RFI/RI Work Plan for 716-A Motor Shops Seepage Basin (open access)

RFI/RI Work Plan for 716-A Motor Shops Seepage Basin

This work plan is prepared for the 716-A Motor Shops Seepage Basin, which is located in the A-Area at the Savannah River Site in Aiken, South Carolina.
Date: April 2, 1996
Creator: Palmer, E.
Object Type: Report
System: The UNT Digital Library
HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory (open access)

HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety …
Date: July 1, 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Software Development Plan for DESCARTES and CIDER (open access)

Software Development Plan for DESCARTES and CIDER

This Software Development Plan (SDP) outlines all software activities required to obtain functional environmental accumulation and individual dose codes for the Hanford Environmental Dose Reconstruction (HEDR) project. The modeling activities addressed use the output of the air transport-code HATCHET to compute radionuclide concentrations in environmental pathways, and continue on through calculations of dose for individuals. The Hanford Environmental Dose Reconstruction (HEDR) Project has a deliverable in the June 1993 time frame to be able to start computing doses to individuals from nuclear-related activities on the Hanford Site during and following World War II. The CIDER code will compute doses and their uncertainties for individuals living in the contaminated environment computed by DESCARTES. The projected size of the code is 3000 lines.
Date: December 8, 1992
Creator: Eslinger, P. W.
Object Type: Report
System: The UNT Digital Library
Software Development Plan for DESCARTES and CIDER. Hanford Environmental Dose Reconstruction Project: Version 1.0 (open access)

Software Development Plan for DESCARTES and CIDER. Hanford Environmental Dose Reconstruction Project: Version 1.0

This Software Development Plan (SDP) outlines all software activities required to obtain functional environmental accumulation and individual dose codes for the Hanford Environmental Dose Reconstruction (HEDR) project. The modeling activities addressed use the output of the air transport-code HATCHET to compute radionuclide concentrations in environmental pathways, and continue on through calculations of dose for individuals. The Hanford Environmental Dose Reconstruction (HEDR) Project has a deliverable in the June 1993 time frame to be able to start computing doses to individuals from nuclear-related activities on the Hanford Site during and following World War II. The CIDER code will compute doses and their uncertainties for individuals living in the contaminated environment computed by DESCARTES. The projected size of the code is 3000 lines.
Date: December 8, 1992
Creator: Eslinger, P. W.
Object Type: Report
System: The UNT Digital Library
Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection (open access)

Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection

The continuous collection of groundwater data is a basic and necessary part of Lockeheed Martin Energy Systems` ORNL Environmental Restoration Area-Wide Groundwater Program. Continuous groundwater data consist primarily of continually recorded groundwater levels, and in some instances, specific conductivity, pH, and/or temperature measurements. These data will be collected throughout the ORNL site. This Work Plan (WP) addresses technical objectives, equipment requirements, procedures, documentation requirements, and technical instructions for the acquisition of the continuous groundwater data. Intent of this WP is to provide an approved document that meets all the necessary requirements while retaining the flexibility necessary to effectively address ORNL`s groundwater problems.
Date: August 1, 1995
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Groundwater Protection Program Calendar Year 1998 Evaluation of Groundwater and Surface Water Quality Data for the Bear Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee (open access)

Groundwater Protection Program Calendar Year 1998 Evaluation of Groundwater and Surface Water Quality Data for the Bear Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

This report presents an evaluation of the water quality monitoring data obtained by the Y-12 Plant Groundwater Protection Program (GWPP) in the Bear Creek Hydrogeologic Regime (Bear Creek Regime) during calendar year (CY) 1998. The Bear Creek Regime contains many confirmed and potential sources of groundwater and surface water contamination associated with the U.S. Department of Energy (DOE) Oak Ridge Y-12 Plant. Applicable provisions of DOE Order 5400.1A - General Environmental Protection Program - require evaluation of groundwater and surface water quality near the Y-12 Plant to: (1) gauge groundwater quality in areas that are, or could be, affected by plant operations, (2) determine the quality of surface water and groundwater where contaminants are most likely to migrate beyond the DOE Oak Ridge Reservation (ORR) property line, and (3) identify and characterize long-term trends in groundwater quality. The following sections of this report contain relevant background information (Section 2.0); describe the results of the respective data evaluations required under DOE Order 5400.1A (Section 3.0); summarize significant findings of each evaluation (Section 4.0); and list the technical reports and regulatory documents cited for more detailed information (Section 5.0). All of the figures (maps and trend graphs) and data tables referenced in …
Date: September 1, 1999
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Work plan addendum for the remedial investigation and feasibility study of the Salmon Site (open access)

Work plan addendum for the remedial investigation and feasibility study of the Salmon Site

This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of …
Date: November 1, 1995
Creator: unknown
Object Type: Report
System: The UNT Digital Library
FY 1993 task plans for the Hanford Environmental Dose Reconstruction Project (open access)

FY 1993 task plans for the Hanford Environmental Dose Reconstruction Project

The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to individuals and populations. The primary objective of work to be performed in FY 1993 is to complete the source term estimates and dose estimates for key radionuclides for the air and river pathways. At the end of FY 1993, the capability will be in place to estimate doses for individuals in the extended (32-county) study area, 1944--1991. Native American research will continue to provide input for tribal dose estimates. In FY 1993, the Technical Steering Panel (TSP) will decide whether demographic and river pathways data collection should be extended beyond FY 1993 levels. The FY 1993 work scopes and milestones in this document are based on the work plan discussed at the TSP Budget/Fiscal Subcommittee meeting on August 19--20, 1991. Table 1 shows the FY 1993 milestones; Table 2 shows estimated costs. The subsequent work scope descriptions are based on the milestones. This document and the FY 1992 task plans will form the basis for a contract with Battelle and the Centers for Disease Control (CDC). The 2-year dose reconstruction contract is expected to begin in February 1992. …
Date: October 1, 1991
Creator: Shipler, D. B.
Object Type: Report
System: The UNT Digital Library
Quality Assurance Plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (open access)

Quality Assurance Plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

The Oak Ridge National Laboratory (ORNL) Waste Area Grouping (WAG) 2 Site Investigation (SI)includes the lower portion of the White Oak Creek (WOC) drainage and enbayment, and associated floodplain and subsurface environment. The ORNL main plant and the major waste storage and disposal facilities at ORNL are located in the WOC watershed and are drained by the WOC system to the Clinch River, located off-site. Environmental media are contaminated and continue to receive contaminants from hydrologically upgradient WAGS. WAG 2 is important as a conduit from upgradient areas to the Clinch River. The general objectives of the WAG 2 SI Project are to conduct a multimedia monitoring and characterization program to define and monitor the input of contaminants from adjacent WAGS, monitor and gather sufficient information for processes controlling or driving contaminant fluxes to construct an appropriate conceptual model for WAG 2, and prepare for the eventual remediation of WAG 2.
Date: December 1, 1992
Creator: Atwood, G.P. & Miller, D.E. (Automated Sciences Group, Inc., Oak Ridge, TN (United States))
Object Type: Report
System: The UNT Digital Library
Quality Assurance Plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program (open access)

Quality Assurance Plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

The Oak Ridge National Laboratory (ORNL) Waste Area Grouping (WAG) 2 Site Investigation (SI)includes the lower portion of the White Oak Creek (WOC) drainage and enbayment, and associated floodplain and subsurface environment. The ORNL main plant and the major waste storage and disposal facilities at ORNL are located in the WOC watershed and are drained by the WOC system to the Clinch River, located off-site. Environmental media are contaminated and continue to receive contaminants from hydrologically upgradient WAGS. WAG 2 is important as a conduit from upgradient areas to the Clinch River. The general objectives of the WAG 2 SI Project are to conduct a multimedia monitoring and characterization program to define and monitor the input of contaminants from adjacent WAGS, monitor and gather sufficient information for processes controlling or driving contaminant fluxes to construct an appropriate conceptual model for WAG 2, and prepare for the eventual remediation of WAG 2.
Date: December 1, 1992
Creator: Atwood, G. P. & Miller, D. E.
Object Type: Report
System: The UNT Digital Library
Meteorological Monitoring Sampling and Analysis Plan for Environmental Monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (open access)

Meteorological Monitoring Sampling and Analysis Plan for Environmental Monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

This Sampling and Analysis Plan addresses meteorological monitoring activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory (ORNL). Meterological monitoring of various climatological parameters (eg., temperature, wind speed, humidity) will be collected by instruments installed at WAG 6. Data will be recorded electronically at frequencies varying from 5-min intervals to 1-h intervals, dependent upon parameter. The data will be downloaded every 2 weeks, evaluated, compressed, and uploaded into a WAG 6 data base for subsequent use. The meteorological data will be used in water balance calculations in support of the WAG 6 hydrogeological model.
Date: December 1, 1993
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Hanford Environmental Dose Reconstruction Project monthly report, November 1992 (open access)

Hanford Environmental Dose Reconstruction Project monthly report, November 1992

The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed members representing the states of Oregon, Washington. and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks: Source terms; environmental transport; environmental monitoring data; demography, food consumption and agriculture; environmental pathways and dose estimates.
Date: January 1, 1992
Creator: Cannon, S. D. & Finch, S. M. (comps.)
Object Type: Report
System: The UNT Digital Library
Hanford Environmental Dose Reconstruction Project monthly report, November 1992 (open access)

Hanford Environmental Dose Reconstruction Project monthly report, November 1992

The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed members representing the states of Oregon, Washington. and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks: Source terms; environmental transport; environmental monitoring data; demography, food consumption and agriculture; environmental pathways and dose estimates.
Date: December 31, 1992
Creator: Cannon, S. D. & Finch, S. M.
Object Type: Report
System: The UNT Digital Library
Integrated test plan ResonantSonic drilling system technology demonstration-1995, at the Hanford Site: Revision 1 (open access)

Integrated test plan ResonantSonic drilling system technology demonstration-1995, at the Hanford Site: Revision 1

This integrated test plan describes the demonstration test of the ResonantSonic drilling system. This demonstration is part of the Office of Technology Development`s Volatile Organic Compound Arid Integrated Demonstration (VOC-Arid ID). Two main purposes of this demonstration are (1) to continue testing the ResonantSonic drilling system compatibility with the Hanford Site waste characterization programs, and (2) to transfer this method for use at the Hanford Site, other government sites, and the private sector. The ResonantSonic method is a dry drilling technique. Field testing of this method began in July 1993. During the next four months, nine holes were drilled, and continuous core samples were retrieved. Penetration rates were 2 to 3 times the baseline, and the operational downtime rate was less than 10%. Successfully demonstrated equipment refinements included a prototype 300 series ResonantSonic head, a new drill rod design for 18-centimeter diameter pipe, and an automated pipe handling system. Various configurations of sampling equipment and drill bits were tested, depending on geologic conditions. The principal objective of the VOC-Arid ID is to determine the viability of emerging technologies that can be used to characterize, remediate, and/or monitor arid or semiarid sites containing VOCs (e.g., carbon tetrachloride) with or without associated …
Date: November 17, 1994
Creator: McLellan, G. W.
Object Type: Report
System: The UNT Digital Library
Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory (open access)

Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).
Date: July 1, 1993
Creator: Keck, K. N.; Stormberg, G. J.; Porro, I.; Sondrup, A. J. & McCormick, S. H.
Object Type: Report
System: The UNT Digital Library