Rebuilding Iraq: Status of Competition for Iraq Reconstruction Contracts (open access)

Rebuilding Iraq: Status of Competition for Iraq Reconstruction Contracts

A letter report issued by the Government Accountability Office with an abstract that begins "Since 2003, Congress has appropriated more than $20 billion through the Iraq Relief and Reconstruction Fund (IRRF) to support Iraq rebuilding efforts. The majority of these efforts are being carried out through contracts awarded by the Departments of Defense (DOD) and State and the U.S. Agency for International Development (USAID). When awarding IRRF-funded contracts for $5 million or more noncompetitively, agencies are required by statute to provide notification and justification to Congress. In June 2004, GAO found that agencies generally complied with laws and regulations governing competition to award new contracts, but did not always comply with competition requirements when issuing task orders under existing contracts. As mandated by Congress, this report (1) describes the extent of competition in Iraq reconstruction contracts awarded by DOD, USAID, and State since October 1, 2003, based on available data, and (2) assesses whether these agencies followed applicable documentation and congressional notification requirements regarding competition for 51 judgmentally selected Iraq reconstruction contract actions. In written comments, State and USAID concurred with the report findings. DOD provided a technical comment."
Date: October 6, 2006
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Iraq Reconstruction: Better Data Needed to Assess Iraq's Budget Execution (open access)

Iraq Reconstruction: Better Data Needed to Assess Iraq's Budget Execution

A letter report issued by the Government Accountability Office with an abstract that begins "The President's New Way Forward in Iraq identified Iraq's inability to spend its resources to rebuild infrastructure and deliver essential services as a critical economic challenge to Iraq's self-reliance. Further, Iraq's ability to spend its $10.1 billion capital projects budget in 2007 was one of the 18 benchmarks used to assess U.S. progress in stabilizing and rebuilding Iraq. This report (1) examines data the U.S. embassy used to determine the extent to which the government of Iraq spent its 2007 capital projects budget, (2) identifies factors affecting the Iraqi government's ability to spend these funds, and (3) describes U.S. government efforts to assist the Iraqi government in spending its capital projects funds. For this effort, GAO reviewed Iraqi government budget data and information on provincial spending collected by the U.S. Provincial Reconstruction Teams. GAO also interviewed officials from the departments of the Treasury, Defense, State, and other agencies and organizations."
Date: January 15, 2008
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Contract Management: Contracting for Iraq Reconstruction and for Global Logistics Support (open access)

Contract Management: Contracting for Iraq Reconstruction and for Global Logistics Support

Testimony issued by the General Accounting Office with an abstract that begins "The General Accounting Office (GAO) discussed some of the work the it is undertaking to address various operations and rebuilding efforts in Iraq. Specifically, GAO has a body of ongoing work looking at a range of issues involving Iraq, including Iraq's transitional administrative law, efforts to restore essential services to the Iraqi people, and the effectiveness of logistics activities during Operation Iraqi Freedom, among others. Importantly, given the challenging security environment in Iraq and the various other accountability organizations involved in the oversight process, it is attempting to coordinate its engagement planning and execution with other organizations as appropriate. In this testimony it discussed (1) its report (GAO-04-605) that was released yesterday on the contract award procedures for contracts awarded in fiscal year 2003 to help rebuild Iraq and (2) its preliminary findings on the military's use of global logistics support contracts. These support contracts have emerged as important tools in providing deployed military services with a wide range of logistics services."
Date: June 15, 2004
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Rebuilding Iraq: Reconstruction Progress Hindered by Contracting, Security, and Capacity Challenges (open access)

Rebuilding Iraq: Reconstruction Progress Hindered by Contracting, Security, and Capacity Challenges

Testimony issued by the Government Accountability Office with an abstract that begins "The Department of Defense (DOD) has relied extensively on contractors to undertake major reconstruction projects and provide support to its deployed forces, but these efforts have not always achieved desired outcomes. Further, the Iraqi government must be able to reduce violence, sustain reconstruction progress, improve basic services, and make a positive difference in the daily lives of the Iraqi people. This statement discusses (1) factors affecting DOD's ability to promote successful acquisition outcomes on its contracts for reconstruction and for support to deployed forces in Iraq, (2) the deteriorating security situation and the capabilities of the Iraqi security forces, and (3) issues affecting the Iraqi government's ability to support and sustain future reconstruction progress. The testimony is based upon our work on Iraq reconstruction and stabilization efforts, DOD contracting activities, and DOD's use of support contractors spanning several years. This work was conducted in accordance with generally accepted government auditing standards."
Date: February 15, 2007
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Rebuilding Iraq: Stabilization, Reconstruction, and Financing Challenges (open access)

Rebuilding Iraq: Stabilization, Reconstruction, and Financing Challenges

Testimony issued by the Government Accountability Office with an abstract that begins "The United States, along with coalition partners and various international organizations, has undertaken a challenging and costly effort to stabilize and rebuild Iraq following multiple wars and decades of neglect by the former regime. This enormous effort is taking place in an unstable security environment, concurrent with Iraqi efforts to transition to its first permanent government. The United States' goal is to help the Iraqi government develop a democratic, stable, and prosperous country, at peace with itself and its neighbors, a partner in the war against terrorism, enjoying the benefits of a free society and a market economy. In this testimony, GAO discusses the challenges (1) that the United States faces in its rebuilding and stabilization efforts and (2) that the Iraqi government faces in financing future requirements. This statement is based on four reports GAO has issued to the Congress since July 2005 and recent trips to Iraq. Since July 2005, we have issued reports on (1) the status of funding and reconstruction efforts in Iraq, focusing on the progress achieved and challenges faced in rebuilding Iraq's infrastructure; (2) U.S. reconstruction efforts in the water and sanitation …
Date: February 8, 2006
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Rebuilding Iraq: International Donor Pledges for Reconstruction Efforts in Iraq (open access)

Rebuilding Iraq: International Donor Pledges for Reconstruction Efforts in Iraq

Correspondence issued by the Government Accountability Office with an abstract that begins "At an October 30, 2007, hearing before the subcommittee on U.S. efforts to secure, stabilize, and rebuild Iraq, several members requested additional information on international donors' pledges to reconstruction and stabilization efforts in Iraq. This correspondence provides updated information on the amounts of loans and grants pledged by each donor country, as well as the status of those pledges."
Date: December 18, 2007
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Provincial Reconstruction Teams in Afghanistan and Iraq (open access)

Provincial Reconstruction Teams in Afghanistan and Iraq

Correspondence issued by the Government Accountability Office with an abstract that begins "U.S.-led Provincial Reconstruction Teams (PRT) are designed to help improve stability in Afghanistan and Iraq by increasing the host nation's capacity to govern; enhancing economic viability; and strengthening local governments' ability to deliver public services, such as security and health care. PRTs are a means of coordinating interagency diplomatic, economic, reconstruction, and counterinsurgency efforts among various U.S. agencies in Afghanistan and Iraq. PRTs are intended to be interim structures; after a PRT has achieved its goal of improving stability, it may be dismantled to allow traditional development efforts to occur. In Afghanistan, the first PRTs were created in 2002 with the mission of facilitating security and reconstruction by helping the central government extend its authority to the provinces. Since then, PRTs have expanded their purpose to include strengthening local governance and community development. In Iraq, PRTs were initiated in 2005 with the mission to increase the capacity of provincial and local governments to govern effectively and, for newer embedded PRTs (ePRT), to support moderates and assist in the military's counterinsurgency efforts. To accomplish their missions, PRTs engage in and fund a variety of activities, such as developing the …
Date: October 1, 2008
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Rebuilding Iraq--Status of DOD's Reconstruction Program (open access)

Rebuilding Iraq--Status of DOD's Reconstruction Program

Correspondence issued by the Government Accountability Office with an abstract that begins "Of the $18.4 billion that Congress appropriated for Iraq relief and reconstruction in fiscal year 2004, the Department of Defense (DOD) received the largest share--$13.5 billion. As of September 30, 2006, DOD had obligated about $13.1 billion and disbursed about $9.7 billion--$5.6 billion for construction, $3.6 billion for nonconstruction (e.g., engineering, procurement, and the delivery of equipment), and about $480 million for related overhead costs. Among the many contracts DOD uses in Iraq, DOD has obligated about $3.7 billion for 12 large-scale, multiple-year design-build contracts for major construction projects. The design-build contracting approach makes one award for both the design and construction of a project, thus eliminating the need for a separate bidding process for the construction phase. To help Congress monitor the current progress and costs of DOD's reconstruction activities in Iraq, this report discusses (1) the status of the current construction work and targeted completion dates and (2) the support costs incurred by the design-build contractors in DOD's construction program."
Date: December 15, 2006
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Rebuilding Iraq: Status of Funding and Reconstruction Efforts (open access)

Rebuilding Iraq: Status of Funding and Reconstruction Efforts

A letter report issued by the Government Accountability Office with an abstract that begins "Rebuilding Iraq is a U.S. national security and foreign policy priority and constitutes the largest U.S. assistance program since World War II. Billions of dollars in grants, loans, assets, and revenues from various sources have been made available or pledged to the reconstruction of Iraq. The United States, along with its coalition partners and various international organizations and donors, has embarked on a significant effort to rebuild Iraq following multiple wars and decades of neglect by the former regime. The U.S. effort to restore Iraq's basic infrastructure and essential services is important to attaining U.S. military and political objectives in Iraq and helping Iraq achieve democracy and freedom. This report provides information on (1) the funding applied to the reconstruction effort and (2) U.S. activities and progress made in the oil, power, water, and health sectors and key challenges that these sectors face."
Date: July 28, 2005
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Rebuilding Iraq: Governance, Security, Reconstruction, and Financing Challenges (open access)

Rebuilding Iraq: Governance, Security, Reconstruction, and Financing Challenges

Testimony issued by the Government Accountability Office with an abstract that begins "The United States, along with coalition partners and various international organizations, has undertaken a challenging and costly effort to stabilize and rebuild Iraq following multiple wars and decades of neglect by the former regime. This enormous effort is taking place in an unstable security environment, concurrent with Iraqi efforts to transition to its first permanent government. In November 2005, the President issued the National Strategy for Victory in Iraq. According to the strategy, victory will be achieved when Iraq is peaceful, united, stable, secure, well integrated into the international community, and a full partner in the global war on terror. In this testimony, GAO discusses the key challenges that the United States, international community, and Iraq face in rebuilding and stabilizing Iraq. This statement is based on four reports GAO has issued to the Congress since July 2005 and recent trips to Iraq. Since July 2005, GAO issued reports on (1) the status of funding and reconstruction efforts in Iraq, the progress achieved, and challenges faced in rebuilding Iraq's infrastructure; (2) U.S. efforts in the water and sanitation sector; and (3) U.S. assistance for the January 2005 Iraqi …
Date: April 25, 2006
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Rebuilding Iraq (open access)

Rebuilding Iraq

Correspondence issued by the General Accounting Office with an abstract that begins "Rebuilding Iraq is a U.S. national security priority. As part of this effort, Congress appropriated $79 billon in emergency supplemental funds for fiscal year 2003 for military operations and Iraq's reconstruction, including humanitarian relief, peacekeeping, and economic and political reform. We have issued reports on similar programs to rebuild countries in the former Yugoslavia, the former Soviet Union, and other locations (see attachment III for a listing of previous GAO reports). Based on this work, we have developed short papers to help congressional decision-makers think about and prioritize the range of issues related to rebuilding Iraq."
Date: May 15, 2003
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Rebuilding Iraq: Continued Progress Requires Overcoming Contract Management Challenges (open access)

Rebuilding Iraq: Continued Progress Requires Overcoming Contract Management Challenges

Testimony issued by the Government Accountability Office with an abstract that begins "The United States, along with its coalition partners and various international organizations, has undertaken a challenging, complex, and costly effort to stabilize and rebuild Iraq. The Department of Defense (DOD) has responsibility for a significant portion of the reconstruction effort. Amid signs of progress, the coalition faces numerous political, security, and economic challenges in rebuilding Iraq. Within this environment, many reconstruction projects have fallen short of expectations, resulting in increased costs, schedule delays, reduced scopes of work, and in some cases project cancellations. This testimony (1) discusses the overall progress that has been made in rebuilding Iraq and (2) describes challenges faced by DOD in achieving successful outcomes on individual projects. This testimony reflects our reviews of reconstruction and DOD contract management issues, as well as work of the Special Inspector General for Iraq Reconstruction. In our previous reports, we have made several recommendations to improve outcomes in Iraq. DOD generally agreed with our recommendations."
Date: September 28, 2006
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Stabilizing and Rebuilding Iraq: Coalition Support and International Donor Commitments (open access)

Stabilizing and Rebuilding Iraq: Coalition Support and International Donor Commitments

Testimony issued by the Government Accountability Office with an abstract that begins "In March 2003, a U.S.-led multinational force began operations in Iraq. At that time, 48 nations, identified as a "coalition of the willing," offered political, military, and financial support for U.S. efforts in Iraq, with 38 nations other than the United States providing troops. In addition, international donors met in Madrid in October 2003 to pledge funding for the reconstruction of Iraq's infrastructure, which had deteriorated after multiple wars and decades of neglect under the previous regime. This testimony discusses (1) the troop commitments other countries have made to operations in Iraq, (2) the funding the United States has provided to support other countries' participation in the multinational force, and (3) the financial support international donors have provided to Iraq reconstruction efforts. This testimony is based on GAO's prior work and data collected for this hearing. Although we reviewed both classified and unclassified documents, the information in this statement is based only on unclassified documents. We completed this work in accordance with generally accepted government auditing standards."
Date: May 9, 2007
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Stabilizing and Rebuilding Iraq: Iraqi Revenues, Expenditures, and Surplus (open access)

Stabilizing and Rebuilding Iraq: Iraqi Revenues, Expenditures, and Surplus

A letter report issued by the Government Accountability Office with an abstract that begins "Iraq has an estimated 115 billion barrels of crude oil reserves, the third largest in the world. Oil export revenues are critical to Iraq's reconstruction, accounting for over 90 percent of the Iraqi government's revenues. In June 2008, GAO reported low 2007 spending rates by the Iraqi government for some critical sectors in the face of declining U.S. investments in these sectors. This report examines (1) Iraq's estimated revenues from 2005 through 2008, (2) Iraq's estimated expenditures from 2005 through 2008, (3) Iraq's financial deposits through 2007 and budget surpluses, (4) U.S. cumulative expenditures on stabilization and reconstruction activities in Iraq since 2003, and (5) factors affecting Iraq's efforts to accelerate spending. GAO analyzed relevant data and reviewed documents, including Central Bank of Iraq oil receipts data, International Monetary Fund's (IMF) reports, translated copies of Iraqi budget and expenditures, and U.S. agency funding data and reports. GAO also interviewed officials from the Departments of Defense (DOD), Energy, State, Treasury, and the IMF. This report contains no recommendations. Treasury agreed with the report's findings and stated that Iraq has adequate funds to make and maintain capital investments …
Date: August 5, 2008
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Recovering Iraq's Assets: Preliminary Observations on U.S. Efforts and Challenges (open access)

Recovering Iraq's Assets: Preliminary Observations on U.S. Efforts and Challenges

Testimony issued by the General Accounting Office with an abstract that begins "Rebuilding Iraq is a U.S. national security priority. Billions of dollars are needed for Iraq's reconstruction. The U.S. government and the international community have undertaken important efforts to recover the assets of the former regime and return them to the Iraqi people. In this testimony, GAO will present its preliminary observations on the recovery effort. Specifically, GAO (1) updates its estimate of the revenues diverted from the Oil for Food Program, (2) describes the U.S. government agencies working on the asset recovery effort, (3) discusses the results of U.S. efforts, and (4) highlights challenges that the United States faces in recovering Iraqi assets."
Date: March 18, 2004
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Rebuilding Iraq: U.S. Assistance for the January 2005 Elections (open access)

Rebuilding Iraq: U.S. Assistance for the January 2005 Elections

Correspondence issued by the Government Accountability Office with an abstract that begins "Fostering a democratic and publicly elected government in Iraq is a U.S. foreign policy priority. According to the President, the United States intends to help Iraq achieve democracy and has a vital national interest in the success of free institutions in Iraq. Toward that end, the Coalition Provisional Authority (CPA) transferred power to a sovereign Iraqi interim government on June 28, 2004. With assistance from the United Nations (UN) and international community, the interim government held a national election for a transitional National Assembly on January 30, 2005. To help Iraq prepare for this election, the United States obligated approximately $130 million to provide assistance to the Independent Electoral Commission of Iraq (IECI), Iraqi nongovernmental organizations (NGO), and political entities. Much of this assistance is directed at not only the January 30 elections but also the two subsequent elections--a constitutional referendum and political election--scheduled before the end of 2005. As part of our effort to monitor Iraq reconstruction, we have gathered information on efforts to support Iraq's political transition. This report was initiated under the Comptroller General's statutory authority and is being addressed to the committees of jurisdiction. …
Date: September 7, 2005
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Stabilizing and Rebuilding Iraq: Conditions in Iraq Are Conducive to Fraud, Waste, and Abuse (open access)

Stabilizing and Rebuilding Iraq: Conditions in Iraq Are Conducive to Fraud, Waste, and Abuse

Testimony issued by the Government Accountability Office with an abstract that begins "This testimony discusses some of the systemic conditions in Iraq that contribute to the fraud, waste, or abuse of U.S.-provided funds. Since 2003, DOD has reported total costs of about $257.5 billion for military operations in Iraq; these have increased from about $38.8 billion in fiscal year 2003 to about $83.4 billion in fiscal year 2006. The largest increase has been in operation and maintenance expenses, including items such as support for housing, food, and services; the repair of equipment; and transportation of people, supplies and equipment. Many of the operation and maintenance expenses are for services. Other U.S. government agencies had reported obligations of $29 billion for Iraqi reconstruction and stabilization, as of October 2006. These funds have been used for, among other things, infrastructure repair of the electricity, oil, water, and health sectors; training and equipping of the Iraqi security forces; and administrative expenses. Specifically, the testimony focuses on (1) security, (2) management and reporting of the program to train and equip Iraqi security forces, (3) contracting and contract management activities, and (4) Iraqi capacity and commitment to manage and fund reconstruction and security efforts."
Date: April 23, 2007
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Rebuilding Iraq: Resource, Security, Governance, Essential Services, and Oversight Issues (open access)

Rebuilding Iraq: Resource, Security, Governance, Essential Services, and Oversight Issues

Correspondence issued by the General Accounting Office with an abstract that begins "Rebuilding Iraq is a U.S. national security and foreign policy priority. According to the President, the United States intends to help Iraq achieve democracy and freedom and has a vital national interest in the success of free institutions in Iraq. As of April 30, 2004, billions of dollars in grants, loans, assets, and revenues from various sources have been made available or pledged to the reconstruction of Iraq. The United States, along with its coalition partners and various international organizations and donors, has embarked on a significant effort to rebuild Iraq following multiple wars and decades of neglect by the former regime. The Coalition Provisional Authority (CPA), established in May 2003, was the U.N.-recognized coalition authority led by the United States and the United Kingdom that was responsible for the temporary governance of Iraq. Specifically, the CPA wasresponsible for overseeing, directing, and coordinating the reconstruction effort. On June 28, 2004, the CPA transferred power to a sovereign Iraqi interim government, and the CPA officially dissolved. To pave the way for this transfer, the CPA helped the Iraq Governing Council develop the Law of Administration for the State of …
Date: June 28, 2004
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Rebuilding Iraq: U.S. Water and Sanitation Efforts Need Improved Measures for Assessing Impact and Sustained Resources for Maintaning Facilities (open access)

Rebuilding Iraq: U.S. Water and Sanitation Efforts Need Improved Measures for Assessing Impact and Sustained Resources for Maintaning Facilities

A letter report issued by the Government Accountability Office with an abstract that begins "After security conditions in Iraq began to deteriorate in June 2003, the U.S.-led Coalition Provisional Authority (CPA) included restoring essential services in Iraq, such as water and sanitation, as part of its strategy for establishing a secure, peaceful, and democratic Iraq. From 1991 to 2003, a decreasing number of Iraqis had access to safe drinking water and sanitation services, and water-borne disease rates rose. The United States has made available $2.6 billion for rebuilding the water and sanitation sector. As part of GAO's review of Iraq reconstruction under the Comptroller General's authority, we assessed U.S. activities in the water and sanitation sector, including (1) the funding and status of U.S. activities, (2) U.S. efforts to measure progress, (3) the factors affecting the implementation of reconstruction activities, and (4) the sustainability of U.S.-funded projects."
Date: September 7, 2005
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Rebuilding Iraq: Integrated Strategic Plan Needed to Help Restore Iraq's Oil and Electricity Sectors (open access)

Rebuilding Iraq: Integrated Strategic Plan Needed to Help Restore Iraq's Oil and Electricity Sectors

A letter report issued by the Government Accountability Office with an abstract that begins "Since 2003, the United States has provided several billion dollars in reconstruction funds to help rebuild Iraq oil and electricity sectors, which are crucial to rebuilding Iraq's economy. For example, oil export revenues account for over half of Iraq's gross domestic product and over 90 percent of government revenues. The U.S. rebuilding program was predicated on three key assumptions: a permissive security environment, the ability to restore Iraq's essential services to prewar levels, and funding from Iraq and international donors. This report addresses (1) the funding made available to rebuild Iraq's oil and electricity sectors, (2) the U.S. goals for these sectors and progress in achieving these goals, and (3) the key challenges the U.S. government faces in these efforts."
Date: May 15, 2007
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Iraq's Transitional Law (open access)

Iraq's Transitional Law

Correspondence issued by the General Accounting Office with an abstract that begins "On June 30, 2004, the Coalition Provisional Authority (CPA) intends to transfer power in Iraq to a fully sovereign Iraqi interim government. CPA and the Iraq Governing Council took a fundamental step toward this goal in March 2004, when they signed the Law of Administration for the State of Iraq for the Transitional Period (hereafter referred to as the transitional law). The transitional law is intended to govern the affairs of Iraq until Iraqis approve a permanent constitution and a permanent Iraqi government takes office. GAO has ongoing and completed work reviewing various aspects of the U.S. effort to reconstruct Iraq. Our ongoing work includes reviewing the costs associated with reconstruction; the process used to award reconstruction contracts; efforts to develop Iraq's security forces; the rebuilding of Iraq's oil, electricity, and water infrastructure; and programs to help Iraq develop a unified, democratic government. For this report, we describe the following information as it exists at this time: (1) the time frames and Iraqi governmental structures established by the transitional law; (2) arrangements in the law for the U.S.-led multinational force, Iraqi security forces, and militias; and (3) mechanisms …
Date: May 25, 2004
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Military Operations: Actions Needed to Better Guide Project Selection for Commander's Emergency Response Program and Improve Oversight in Iraq (open access)

Military Operations: Actions Needed to Better Guide Project Selection for Commander's Emergency Response Program and Improve Oversight in Iraq

Correspondence issued by the Government Accountability Office with an abstract that begins "Since fiscal year 2003, Congress has appropriated more than $46 billion dollars for relief and reconstruction efforts in Iraq. The Department of Defense (DOD) is one of several U.S. agencies that administer U.S.-funded relief and reconstruction programs in Iraq. In particular, DOD manages the Commander's Emergency Response Program (CERP), which is designed to enable local commanders in Iraq and Afghanistan to respond to urgent humanitarian relief and reconstruction requirements within their areas of responsibility by carrying out programs that will immediately assist the indigenous population. Thus far, Congress has appropriated more than $3 billion for CERP in Iraq and Afghanistan. Since the program's inception, DOD has steadily increased its funding requests in response to theater conditions, and reported obligations have also grown substantially. DOD's funding requests have increased by more than a billion dollars from fiscal years 2004 through 2008. For fiscal year 2008, DOD requested $1.2 billion to fund CERP projects in Iraq and Afghanistan and plans to request an additional $507 million, primarily for CERP in Iraq. Furthermore, DOD's reported obligations for Iraq and Afghanistan have grown from about $179 million in fiscal year 2004 to …
Date: June 23, 2008
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Stabilizing Iraq: An Assessment of the Security Situation (open access)

Stabilizing Iraq: An Assessment of the Security Situation

Testimony issued by the Government Accountability Office with an abstract that begins "From fiscal years 2003 through 2006, U.S. government agencies have reported significant costs for U.S. stabilization and reconstruction efforts in Iraq. In addition, the United States currently has committed about 138,000 military personnel to the U.S.-led Multinational Force in Iraq (MNF-I). Over the past 3 years, worsening security conditions have made it difficult for the United States to achieve its goals in Iraq. In this statement, we discuss (1) the trends in the security environment in Iraq, and (2) progress in developing Iraqi security forces, as reported by the Departments of Defense (DOD) and State. We also present key questions for congressional oversight, including what political, economic, and security conditions must be achieved before the United States can draw down and withdraw? Why have security conditions continued to deteriorate even as Iraq has met political milestones, increased the number of trained and equipped forces, and increasingly assumed the lead for security? If existing U.S. political, economic, and security measures are not reducing violence in Iraq, what additional measures, if any, will the administration propose for stemming the violence?"
Date: September 11, 2006
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Iraq: Key Issues for Congressional Oversight (open access)

Iraq: Key Issues for Congressional Oversight

Other written product issued by the Government Accountability Office with an abstract that begins "To assist the 111th Congress, this report presents a series of issue papers for consideration in developing congressional oversight agendas and determining the way forward in securing and stabilizing Iraq. These papers are based on the continuing work of the U.S. Government Accountability Office (GAO) and the more than 130 Iraq-related products we have issued since May 2003. Since fiscal year 2001, Congress has provided about $808 billion to the Department of Defense (DOD) for military efforts primarily in support of the Global War on Terrorism. The majority of this amount has been for military operations in support of Operation Iraqi Freedom. Moreover, since fiscal year 2003, about $49 billion has been provided to U.S. agencies for stabilization and reconstruction efforts in Iraq, including developing Iraq's security forces, enhancing Iraq's capacity to govern, and rebuilding Iraq's oil, electricity, and water sectors, among other activities. This report expands on issues discussed on GAO's transition Web site. In January 2007, President Bush announced The New Way Forward in Iraq to stem violence and enable the Iraqi government to foster national reconciliation. To support the strategy, the United States …
Date: March 24, 2009
Creator: United States. Government Accountability Office.
Object Type: Text