Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program (BMAP) Plan (open access)

Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program (BMAP) Plan

The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y- 12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional toxicity testing if initial results indicate low survival or reproduction) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is observed). …
Date: October 1, 1998
Creator: Adams, S. M.; Brandt, C. C.; Christensen, S. W.; Cicerone, D. S.; Greeley, M. S., Jr.; Hill, W. R. et al.
System: The UNT Digital Library
1997 Annual Site Environmental Report (ASER) (open access)

1997 Annual Site Environmental Report (ASER)

The SLAC program centers around experimental and theoretical research in elementary particle physics using accelerated electron beams and a broad program of research in atoms and solid-state physics, chemistry, and biology using synchrotron radiation from accelerated electron beams. There is also an active program in the development of accelerators, detectors, and new sources and instrumentation for synchrotron radiation research. The main instrument of research is the 3.2-km linear accelerator (linac) that generates high intensity beams of electrons and positrons up to 50 GeV, which are among the highest energy electron and positron beams available in the world. The linac is also used for injecting electrons and positrons into colliding-beam storage rings for particle physics research. The Positron-Electron Project (PEP) storage ring is about 800 meters in diameter. The PEP program was completed several years ago. PEP is now being upgraded to serve as an Asymmetric B Factory (or PEP-II) that will study the B meson. PEP-II will make use of much of PEP's existing equipment and infrastructure, and is scheduled for completion in 1998. A smaller storage ring, the Stanford Positron-Electron Asymmetric Ring (SPEAR) has its own smaller linac and a booster ring for injecting accelerated beams of electrons. SPEAR …
Date: October 1, 1998
Creator: Holden, Gene
System: The UNT Digital Library