Month

Impacts of proposed RCRA regulations and other related federal environmental regulations on Fossil Fuel-Fired Facilities: Final report, Volume 1 (open access)

Impacts of proposed RCRA regulations and other related federal environmental regulations on Fossil Fuel-Fired Facilities: Final report, Volume 1

In order to fulfill its responsibilities, DOE contracted with Engineering-Science to perform a multi-phase engineering and economics study to evaluate the impact of the proposed RCRA regulations and other related federal environmental regulations on coal-fired utilities. This Interim Phase I report presents the findings of the impacts of proposed RCRA and related federal regulations on the utility sector fossil fuel-fired facilities. Subsequent phases involve parallel engineering studies on the industrial sector as well as economic evaluations. The framework of this study was based on the development and analysis (engineering and economic) of four regulatory scenarios for the disposal of fly ash, bottom ash and FGD sludge from the utility industry.
Date: March 1, 1987
Creator: unknown
System: The UNT Digital Library
An exploratory shaft facility in SALT: Draft shaft study plan (open access)

An exploratory shaft facility in SALT: Draft shaft study plan

This draft Shaft Study Plan describes a program of testing and monitoring in the Exploratory Shafts of a candidate high-level nuclear waste repository site in Deaf Smith County, Texas. The purpose of the programs to assist with site characterization in support of a determination of site suitability for development as a repository design and performance assessment evaluations. The program includes a variety of geological, geophysical, geomechanical, thermomechanical, and geohydrological testing and monitoring. The program is presented as a series of separate studies concerned with geological, geomechanical, and geohydrological site characterization, and with evaluating the mechanical and hydrological response of the site to construction of the shafts. The various studies, and associated test or monitoring methods are shown. The procedure used in developing the test program has been to initially identify the information necessary to satisfy (1) federal, state, and local requirements, and (2) repository program requirements. These information requirements have then been assessed to determine which requirements can be addressed wholly or in significant part by monitoring and testing from within the shafts. Test methods have been identified to address specific information requirements. 67 refs., 39 figs., 31 tabs.
Date: March 1, 1987
Creator: unknown
System: The UNT Digital Library