Data Management Plan for the Environmental Restoration Program (open access)

Data Management Plan for the Environmental Restoration Program

The purpose of this handbook is to assist environmental restoration (ER) projects in the preparation of a data management implementation plan (DMIP). The DMIP identifies and documents an ER project's requirements and responsibilities for the management, quality assurance, use, and archival of its environmental data. It is important that a project complete its DMIP in the early planning phase to ensure that the necessary and appropriate data management systems and personnel are in place before the project begins acquiring data. All ER projects that collect or use environmental data at the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Oak Ridge K-25 Site, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and surrounding onsite and offsite areas must prepare a DMIP. Project types that often collect environmental data include surveillance and maintenance, decontamination and decommissioning, remedial design/remedial action, and remedial investigation/feasibility studies. Even if a project does little environmental data management, a DMIP is required to document this fact.
Date: January 1, 1994
Creator: Bryd, P.
Object Type: Report
System: The UNT Digital Library
Parking and routing information system phase 1 evaluation -- Data management and quality control/quality assurance plans (open access)

Parking and routing information system phase 1 evaluation -- Data management and quality control/quality assurance plans

A parking and routing information system (PARIS) is being designed and deployed at a test site on the Mountain Home Veterans Administration campus in Johnson City, Tennessee using three sensor technologies. The purpose of the PARIS project is to demonstrate innovative integration of vehicle sensing technologies with parking management strategies to improve mobility and relieve congestion associated with a growing medical technology complex. Oak Ridge National Laboratory`s (ORNL) role during phase 1 of the project is to act as the independent evaluator. This technical memorandum presents two plans, Data Management Plan and Quality Control/Quality Assurance (QC/QA) Plan, which were developed to support ORNL`s responsibilities and functions. The purposes of the Data Management Plan are to coordinate the data needs which will be addressed in four individual evaluation test plans and to deal with the data issues facing the phase 1 evaluation as a whole. The objectives of the QC/QA Plan are to ensure that the evaluation is conducted properly, to guarantee that the data which will be collected are valid and properly analyzed, and to make sure that the test results are accurately recorded and reported. The evaluation will be performed through the execution of four integrated studies (system performance, …
Date: January 1, 1997
Creator: Carter, R. J.
Object Type: Report
System: The UNT Digital Library
Hanford Environmental Dose Reconstruction Project (open access)

Hanford Environmental Dose Reconstruction Project

The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.
Date: January 1, 1992
Creator: Finch, S.M. & McMakin, A.H. (comps.)
Object Type: Report
System: The UNT Digital Library
Hanford Environmental Dose Reconstruction Project monthly report, August 1992 (open access)

Hanford Environmental Dose Reconstruction Project monthly report, August 1992

The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates.
Date: January 1, 1992
Creator: McMakin, A. H.; Cannon, S. D. & Finch, S. M. (comps.)
Object Type: Report
System: The UNT Digital Library
Hanford Environmental Dose Reconstruction Project monthly report, May 1992 (open access)

Hanford Environmental Dose Reconstruction Project monthly report, May 1992

The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These task correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates.
Date: January 1, 1992
Creator: Finch, S. M. & McMakin, A. H. (comps.)
Object Type: Report
System: The UNT Digital Library
The BigBOSS Experiment (open access)

The BigBOSS Experiment

BigBOSS will obtain observational constraints that will bear on three of the four 'science frontier' questions identified by the Astro2010 Cosmology and Fundamental Phyics Panel of the Decadal Survey: Why is the universe accelerating; what is dark matter and what are the properties of neutrinos? Indeed, the BigBOSS project was recommended for substantial immediate R and D support the PASAG report. The second highest ground-based priority from the Astro2010 Decadal Survey was the creation of a funding line within the NSF to support a 'Mid-Scale Innovations' program, and it used BigBOSS as a 'compelling' example for support. This choice was the result of the Decadal Survey's Program Priorization panels reviewing 29 mid-scale projects and recommending BigBOSS 'very highly'.
Date: January 1, 2011
Creator: Schelgel, D.; Abdalla, F.; Abraham, T.; Ahn, C.; Allende Prieto, C.; Annis, J. et al.
Object Type: Report
System: The UNT Digital Library
Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (open access)

Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

The Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (Y/ER-301) was prepared (1) to safely, cost-effectively, and efficiently evaluate the environmental impact of solid material in the two debris areas in the context of industrial land uses (as defined in the Bear Creek Valley Feasibility Study) to support the Engineering Evaluation/Cost Assessment and (2) to evaluate, define, and implement the actions to mitigate these impacts. This work was performed under Work Breakdown Structure 1.x.01.20.01.08.
Date: January 1, 1998
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Environmental and Resource Assessment Program: Program Summary (open access)

Environmental and Resource Assessment Program: Program Summary

Research projects are conducted in the following areas: environmental assessment, technology assessment, resource assessment, and material assessment. Project summaries for 1977 are included. (MHR)
Date: January 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Project Management Plan (PMP) for Work Management Implementation (open access)

Project Management Plan (PMP) for Work Management Implementation

The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system
Date: January 13, 2000
Creator: Shipler, C. E.
Object Type: Report
System: The UNT Digital Library
Hanford Environmental Dose Reconstruction Project (open access)

Hanford Environmental Dose Reconstruction Project

The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates.
Date: January 1, 1991
Creator: Finch, S.M. & McMakin, A.H. (comps.)
Object Type: Report
System: The UNT Digital Library
Hanford Environmental Dose Reconstruction Project (open access)

Hanford Environmental Dose Reconstruction Project

The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon and Washington, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on human (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data; Demographics, Agriculture, Food Habits and; Environmental Pathways and Dose Estimates.
Date: January 1, 1991
Creator: Finch, S.M. & McMakin, A.H. (comps.)
Object Type: Report
System: The UNT Digital Library
Comprehensive environmental assessment and response program confirmation and evaluation activities (open access)

Comprehensive environmental assessment and response program confirmation and evaluation activities

The US Department of Energy Albuquerque Operations Office (DOE-AL) initiated the Comprehensive Environmental Assessment and Response Program (CEARP) to identify, evaluate, and conduct remedial actions at hazardous waste disposal and contamination sites on the eight nuclear weapons development and production installations under its jurisdiction. The CEARP is being implemented in five phases (Phase 1 - Installation Assessment, Phase 2 - Confirmation, Phase 3 - Technological Assessment, Phase 4 - Remedial Action, and Phase 5 - Compliance and Verification). During Phase 1, regulatory compliance was evaluated and disposal/contamination sites were identified. Phase 2 provides the field data for site characterization, risk assessment, determination of need for corrective action, and evaluation of possible remedial actions at hazardous waste sites. Phase 2 is being conducted in two stages (monitoring plan development/reconnaissance sampling and site characterization/remedial investigation). Problem sites across the DOE-AL complex were prioritized for site characterization and CEARP Phase 2 activities have been initiated.
Date: January 1, 1986
Creator: Martz, Marjorie K.; Rea, Kenneth H.; Vocke, Robert W. & Ferenbaugh, Roger W.
Object Type: Article
System: The UNT Digital Library
The Los Alamos National Laboratory Environmental Restoration Program (open access)

The Los Alamos National Laboratory Environmental Restoration Program

The LANL Environmental Restoration (ER) Program Office, established in October 1989, is faced with the challenge of assessing and cleaning up nearly 1,8000 potentially hazardous waste sites according to an aggressive corrective action schedule that the Environmental Protection Agency (EPA) mandated on May 23, 1990, in a Resource, Conservation, and Recovery Act (RCRA) Part B Permit. To maximize program efficiency, the ER Program Office will implement a unique management approach designed to maximize the use of laboratory technical expertise. The Installation Work Plan, which provides a blueprint for the program, has been submitted to EPA for review and approval. A work plan for characterization of Technical Area 21, an early plutonium processing facility, is also nearing completion. The feasibility of an expedited cleanup of the Laboratory's worst hazardous waste release has been modelled using a computer code originally developed by LANL to assist the nuclear weapons testing program. A sophisticated Geographic Information System has been implemented to assist in data management and presentation, and the design of a Mixed Waste Disposal Facility is underway. 6 refs., 2 figs.
Date: January 1, 1990
Creator: Krueger, John W.
Object Type: Article
System: The UNT Digital Library
Comprehensive environmental assessment and response program (open access)

Comprehensive environmental assessment and response program

The US Department of Energy's (USDOE) Albuquerque Operations Office installations are being evaluated under its Comprehensive Environmental Assessment and Response program (CEARP). The installations consist of eight weapons development and production facilities, which are located across the United States. The evaluation covers the major environmental regulations, with emphasis on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and on the Resource Conservation and Recovery Act (RCRA). The CEARP is intended to help fulfill USDOE obligations for federal facilities under the US Environmental Protection Agency (CERCLA Program and constitutes the same basic approach as contained in USEPA guidance to federal facilities. The Program is a phased program to identify, assess, and correct existing and potential environmental concerns relative to these regulations. The five phases are Phase I - Installation Assessment, Phase II - Confirmation, Phase III - Technological Assessment, Phase IV - Remedial Action, and Phase V - Compliance and Verification. Phase I activities and reports should be completed during 1986. The Phase II generic sampling plans, data management plans, health and safety plans, and quality assurance/quality control plans will be prepared during 1986. Significant characterization of CERCLA sites will be initiated during 1987.
Date: January 1, 1986
Creator: Gunderson, G. C.; Vocke, R. W. & Stoker, A. K.
Object Type: Article
System: The UNT Digital Library
Y-12 NATIONAL SECURITY COMPLEX BIOLOGICAL MONITORING AND ABATEMENT PROGRAM PLAN (open access)

Y-12 NATIONAL SECURITY COMPLEX BIOLOGICAL MONITORING AND ABATEMENT PROGRAM PLAN

None
Date: January 1, 2013
Creator: Peterson, Mark J; Mathews, Teresa J; Ryon, Michael G; Smith, John G; Christensen, Sigurd W; Greeley Jr, Mark Stephen et al.
Object Type: Report
System: The UNT Digital Library
Insolation resource assessment program plan. Fiscal year 1979--Fiscal year 1981. [Includes glossary] (open access)

Insolation resource assessment program plan. Fiscal year 1979--Fiscal year 1981. [Includes glossary]

The purpose of the Insolation Resource Assessment Program is to collect, standardize, certify, process,, and archive geophysical data for solar energy applications. The principal solar parameters to be measured are global, direct, diffuse and total radiation on an inclined surface. The measurement of the spectral distribution of solar radiation is also important to the development of several technologies. The aim of many of the completed, current, and planned projects presented in the IRAP Plan is to improve solar data collection methods and procedures and to refine solar radiation forecasting capabilities.
Date: January 1, 1979
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000 (open access)

Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.
Date: January 10, 2000
Creator: Jensen, C. E.
Object Type: Report
System: The UNT Digital Library
Hanford Environmental Dose Reconstruction Project monthly report, November 1992 (open access)

Hanford Environmental Dose Reconstruction Project monthly report, November 1992

The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed members representing the states of Oregon, Washington. and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks: Source terms; environmental transport; environmental monitoring data; demography, food consumption and agriculture; environmental pathways and dose estimates.
Date: January 1, 1992
Creator: Cannon, S. D. & Finch, S. M. (comps.)
Object Type: Report
System: The UNT Digital Library
Underground Test Area Fiscal Year 2012 Annual Quality Assurance Report Nevada National Security Site, Nevada, Revision 0 (open access)

Underground Test Area Fiscal Year 2012 Annual Quality Assurance Report Nevada National Security Site, Nevada, Revision 0

This report is mandated by the Underground Test Area (UGTA) Quality Assurance Project Plan (QAPP) and identifies the UGTA quality assurance (QA) activities for fiscal year (FY) 2012. All UGTA organizations—U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO); Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); Navarro-Intera, LLC (N-I); National Security Technologies, LLC (NSTec); and the U.S. Geological Survey (USGS)—conducted QA activities in FY 2012. The activities included conducting assessments, identifying findings and completing corrective actions, evaluating laboratory performance, revising the QAPP, and publishing documents. In addition, processes and procedures were developed to address deficiencies identified in the FY 2011 QAPP gap analysis.
Date: January 1, 2013
Creator: Farnham, Irene & Marutzky, Sam
Object Type: Report
System: The UNT Digital Library
FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS (open access)

FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SA baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, …
Date: January 1, 2011
Creator: Butcher, T.; Swingle, R.; Crapse, K.; Millings, M. & Sink, D.
Object Type: Report
System: The UNT Digital Library
Planning aquatic ecosystem restoration monitoring programs (open access)

Planning aquatic ecosystem restoration monitoring programs

This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.
Date: January 1, 1997
Creator: Thom, R.M. & Wellman, K.F.
Object Type: Report
System: The UNT Digital Library
Y-12 Groundwater Protection Program Groundwater and Surface water Sampling and Analysis Plan for Calendar Year 2006 (open access)

Y-12 Groundwater Protection Program Groundwater and Surface water Sampling and Analysis Plan for Calendar Year 2006

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2006 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2006 will be in accordance with DOE Order 540.1 requirements and the following goals: {sm_bullet} to maintain surveillance of existing and potential groundwater contamination sources; {sm_bullet} to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; {sm_bullet} to identify and characterize long-term trends in groundwater quality at Y-12; and ! to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2006 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and …
Date: January 1, 2006
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Health and Safety Work Plan for Sampling Colloids in Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (open access)

Health and Safety Work Plan for Sampling Colloids in Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

This Work Plan/Site Safety and Health Plan (SSHP) and the attached work plan are for the performance of the colloid project at WAG 5. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division (ESD) and associated ORNL environmental, safety, and health support groups. The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.
Date: January 1, 1994
Creator: Marsh, J. D. & McCarthy, J. F.
Object Type: Report
System: The UNT Digital Library
Oak Ridge reservation federal facility agreement for the Environmental Restoration Program. Volume 1. Quarterly report, October--December 1993 (open access)

Oak Ridge reservation federal facility agreement for the Environmental Restoration Program. Volume 1. Quarterly report, October--December 1993

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1993 (first quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.
Date: January 1, 1994
Creator: unknown
Object Type: Report
System: The UNT Digital Library