Data management plan for the ultrasonic inspection of the double-shell tanks (open access)

Data management plan for the ultrasonic inspection of the double-shell tanks

To obtain an operating permit from Washington State Department of Ecology, Westinghouse Hanford Company (WHC) must assess the double-shell tanks (DST) for structural integrity. The assessment includes volumetric examinations of the primary steel tank and secondary steel liner. The integrity of the tanks will be assessed by remote ultrasonic (UT) inspections of the primary and secondary steel tanks to measure wall thickness and detect corrosion pitting and stress corrosion cracking. The surfaces of the areas to be inspected will be cleaned with a power wire brush to remove loose mill scale, rust, and other materials that could inhibit proper coupling of the UT probe. To ensure that the cleaning process is satisfactory, the cleaned area will be viewed with a video camera and recorded. The video and UT equipment will be calibrated the ensure accuracy, and a performance test will be conducted to verify its capabilities. The tank inspection sequence consists of cleaning, visual examination, and UT inspection of each region selected for inspection: the primary tank wall, the tank bottom and lower knuckle, and the secondary tank wall. A significant amount of data will be collected and reported during these examinations. This data management plan (DMP) describes the data …
Date: September 30, 1994
Creator: Harris, J.
Object Type: Report
System: The UNT Digital Library
Exploring thermal properties of nanoscale wide bandgap semiconductors via  ultrafast thermal-emission spectroscopy (open access)

Exploring thermal properties of nanoscale wide bandgap semiconductors via ultrafast thermal-emission spectroscopy

Data management plan for the grant, "Exploring thermal properties of nanoscale wide bandgap semiconductors via ultrafast thermal-emission spectroscopy." In this project, we aim to develop a new thermometrology technique based on ultrafast thermal emission to directly and accurately measure thermal properties of thin-film wide bandgap semiconductors.
Date: 2023-09-30/2025-09-29
Creator: Xiao, Yuzhe
Object Type: Text
System: The UNT Digital Library
Optic-nerve-head (ONH) Chips for Glaucomatous Neurodegeneration (open access)

Optic-nerve-head (ONH) Chips for Glaucomatous Neurodegeneration

Data management plan for the grant, "Optic-nerve-head (ONH) Chips for Glaucomatous Neurodegeneration." The most prominent causative risk factor of glaucoma, the leading cause of irreversible blindness worldwide, is elevated intraocular pressure (IOP), which could deform the optic nerve head (ONH) and cause glaucomatous neurodegeneration. However, current glaucoma therapies that focus on lowering IOP do not stop vision loss effectively, and thus there is a pressing need to understand the mechanisms underlying glaucoma pathogenesis. In this project, we will develop a biomimetic 3-D ONH-on-a-chip system that closely mimics the key anatomical and pathophysiological characteristics of the native ONH to study astrocytic mechanisms of glaucoma pathogenesis, a missing link to develop efficacious therapies.
Date: 2022-09-30/2025-05-31
Creator: Yang, Yong
Object Type: Text
System: The UNT Digital Library
Double-shell tank ultrasonic inspection plan. Revision 1 (open access)

Double-shell tank ultrasonic inspection plan. Revision 1

The waste tank systems managed by the Tank Waste Remediation System Division of Westinghouse Hanford Company includes 28 large underground double-shell tanks (DST) used for storing hazardous radioactive waste. The ultrasonic (UT) inspection of these tanks is part of their required integrity assessment (WAC 1993) as described in the tank systems integrity assessment program plan (IAPP) (Pfluger 1994a) submitted to the Ecology Department of the State of Washington. Because these tanks hold radioactive waste and are located underground examinations and inspections must be done remotely from the tank annuli with specially designed equipment. This document describes the UT inspection system (DSTI system), the qualification of the equipment and procedures, field inspection readiness, DST inspections, and post-inspection activities. Although some of the equipment required development, the UT inspection technology itself is the commercially proven and available projection image scanning technique (P-scan). The final design verification of the DSTI system will be a performance test in the Hanford DST annulus mockup that includes the demonstration of detecting and sizing corrosion-induced flaws.
Date: September 30, 1994
Creator: Pfluger, D. C.
Object Type: Report
System: The UNT Digital Library
Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee (open access)

Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee (Figure 1). The plan describes the technical approach that will be implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 which provide the most useful hydrologic and water-quality monitoring data. The technical approach is based on the GWPP status designation for each well (Section 2.0). Under this approach, wells granted ''active'' status are used by the GWPP for hydrologic monitoring and/or groundwater sampling (Section 3.0), whereas well granted ''inactive'' status are not used for either purpose. The status designation also determines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP (Section 4.0). Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans and procedures (Section 5.0). This plan applies to groundwater monitoring wells associated with Y-12 and related waste management facilities located within three hydrogeologic regimes (Figure 1): the Bear Creek Hydrogeologic Regime (Bear Creek …
Date: September 30, 2003
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2004 (open access)

Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2004

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2004 will be in accordance with the following requirements of DOE Order 5400.1: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2004 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut …
Date: September 30, 2003
Creator: Elvado Environmental LLC for the Environmental Compliance Department ES&H Division, Y-12 National Security Complex Oak Ridge, Tennessee
Object Type: Report
System: The UNT Digital Library
Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2005 (open access)

Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2005

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2005 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2005 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and …
Date: September 30, 2004
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Texas Register, Volume 8, Number 72, Pages 3877-3914, September 30, 1983 (open access)

Texas Register, Volume 8, Number 72, Pages 3877-3914, September 30, 1983

A weekly publication, the Texas Register serves as the journal of state agency rulemaking for Texas. Information published in the Texas Register includes proposed, adopted, withdrawn and emergency rule actions, notices of state agency review of agency rules, governor's appointments, attorney general opinions, and miscellaneous documents such as requests for proposals. After adoption, these rulemaking actions are codified into the Texas Administrative Code.
Date: September 30, 1983
Creator: Texas. Secretary of State.
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History
Purdue Contribution of Fusion Simulation Program (open access)

Purdue Contribution of Fusion Simulation Program

The overall science goal of the FSP is to develop predictive simulation capability for magnetically confined fusion plasmas at an unprecedented level of integration and fidelity. This will directly support and enable effective U.S. participation in research related to the International Thermonuclear Experimental Reactor (ITER) and the overall mission of delivering practical fusion energy. The FSP will address a rich set of scientific issues together with experimental programs, producing validated integrated physics results. This is very well aligned with the mission of the ITER Organization to coordinate with its members the integrated modeling and control of fusion plasmas, including benchmarking and validation activities. [1]. Initial FSP research will focus on two critical areas: 1) the plasma edge and 2) whole device modeling including disruption avoidance. The first of these problems involves the narrow plasma boundary layer and its complex interactions with the plasma core and the surrounding material wall. The second requires development of a computationally tractable, but comprehensive model that describes all equilibrium and dynamic processes at a sufficient level of detail to provide useful prediction of the temporal evolution of fusion plasma experiments. The initial driver for the whole device model (WDM) will be prediction and avoidance of …
Date: September 30, 2011
Creator: Brooks, Jeffrey
Object Type: Report
System: The UNT Digital Library
Waste Isolation Pilot Plant Biennial Environmental Compliance Report (open access)

Waste Isolation Pilot Plant Biennial Environmental Compliance Report

This Biennial Environmental Compliance Report (BECR) documents environmental regulatory compliance at the Waste Isolation Pilot Plant (WIPP), a facility designed for the safe disposal of transuranic (TRU) radioactive waste, for the reporting period of April 1, 2000, to March 31, 2002. As required by the WIPP Land Withdrawal Act (LWA)(Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201), the BECR documents U.S. Department of Energy (DOE) Carlsbad Field Office's (CBFO) compliance with applicable environmental protection laws and regulations implemented by agencies of the federal government and the state of New Mexico. In the prior BECR, the CBFO and the management and operating contractor (MOC)committed to discuss resolution of a Letter of Violation that had been issued by the New Mexico Environment Department (NMED) in August 1999, which was during the previous BECR reporting period. This Letter of Violation alleged noncompliance with hazardous waste aisle spacing, labeling, a nd tank requirements. At the time of publication of the prior BECR, resolution of the Letter of Violation was pending. On July 7, 2000, the NMED issued a letter noting that the aisle spacing and labeling concerns had been adequately addressed and that they were rescinding the violation alleging that the …
Date: September 30, 2002
Creator: Westinghouse TRU Solutions LLC
Object Type: Report
System: The UNT Digital Library