Engineering task plan for the ultrasonic inspection of hanford double-shell tanks
This document facilitates the ultrasonic examination of Hanford Double-Shell Tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work (SOW) for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptances criteria be discovered.