Pu output from separations plant was less than scheduled, but year-to- date production exceeded commitment by 4%. The Palm recovery run in Purex was the most successful to date. UO{sub 3} production and shipments met schedule. Purex had two pump failures. When Purex 1WW was centrifuged and treated to recover Ce, most of it remained in the centrifugate; only 14% was recovered. The prototype Pu ozonator in Redox performed well. Test runs on an acid precycle flowsheet and a proposed internal recycle scheme for Palm recovery were initiated in Redox. Recuplex had a change in solvent extraction feed preparation, and an installation of a safe-geometry bottom section on the stripping column. Storage of Purex 1WW wastes was discussed in a meeting. Conversion of Rexuplex to a manufacturing facility was completed. Cost estimates were developed for several alternative Palmolive processing schemes. Process flow diagrams were completed for Sulfex decladding of Yankee elements and Zirflex decladding of Dresden elements.
Date: November 20, 1959
Creator: unknown
System: The UNT Digital Library