Partner
Degree Department
2 Matching Results
Results open in a new window/tab. Unexpected Results? Search the Catalog Instead.
Results:
1 - 2 of
2
Examination and Refinement of a Novel Treatment for Posttraumatic Stress Disorder: Processing of Positive Memories Technique (PPMT)
Data management plan for the grant, "Examination and Refinement of a Novel Treatment for Posttraumatic Stress Disorder: Processing of Positive Memories Technique (PPMT)." The study aims to examine effects of and targets underlying a novel technique for posttraumatic stress disorder focused on positive memories (Processing of Positive Memories Technique; PPMT). Specific aims include (1) examining PPMT’s effects; (2) examining mechanistic targets such as improved affect underlying PPMT’s effects; and (3) refining PPMT.
Date:
2022-09-20/2025-09-19
Creator:
Contractor, Ateka A.
Object Type:
Text
System:
The UNT Digital Library
Single Shell Tank (SST) Retrieval Project Plan for Tank 241-C-104 Retrieval
In support of the SST Interim Closure Project, Project W-523 ''Tank 241-C-104 Waste Retrieval System'' will provide systems for retrieval and transfer of radioactive waste from tank 241-C-104 (C-104) to the DST staging tank 241-AY-101 (AY-101). At the conclusion of Project W-523, a retrieval system will have been designed and tested to meet the requirements for Acceptance of Beneficial Use and been turned over to operations. Completion of construction and operations of the C-104 retrieval system will meet the recently proposed near-term Tri-Party Agreement milestone, M-45-03F (Proposed Tri-Party Agreement change request M-45-00-01A, August, 30 2000) for demonstrating limits of retrieval technologies on sludge and hard heels in SSTs, reduce near-term storage risks associated with aging SSTs, and provide feed for the tank waste treatment plant. This Project Plan documents the methodology for managing Project W-523; formalizes responsibilities; identifies key interfaces required to complete the retrieval action; establishes the technical, cost, and schedule baselines; and identifies project organizational requirements pertaining to the engineering process such as environmental, safety, quality assurance, change control, design verification, testing, and operational turnover.
Date:
September 20, 2000
Creator:
DEFIGH PRICE, C.
Object Type:
Report
System:
The UNT Digital Library