LESSONS LEARNED Biosurveillance Mobile App Development Intern Competition (Summer 2013) (open access)

LESSONS LEARNED Biosurveillance Mobile App Development Intern Competition (Summer 2013)

The purpose of the lessons learned document for the BEOWulf Biosurveillance Mobile App Development Intern Competition is to capture the project’s lessons learned in a formal document for use by other project managers on similar future projects. This document may be used as part of new project planning for similar projects in order to determine what problems occurred and how those problems were handled and may be avoided in the future. Additionally, this document details what went well with the project and why, so that other project managers may capitalize on these actions. Project managers may also use this document to determine who the project team members were in order to solicit feedback for planning their projects in the future. This document will be formally communicated with the organization and will become a part of the organizational assets and archives.
Date: January 14, 2014
Creator: Noonan, Christine F.; Henry, Michael J. & Corley, Courtney D.
Object Type: Report
System: The UNT Digital Library
Final Report for National Transport Code Collaboration PTRANSP (open access)

Final Report for National Transport Code Collaboration PTRANSP

PTRANSP, which is the predictive version of the TRANSP code, was developed in a collaborative effort involving the Princeton Plasma Physics Laboratory, General Atomics Corporation, Lawrence Livermore National Laboratory, and Lehigh University. The PTRANSP/TRANSP suite of codes is the premier integrated tokamak modeling software in the United States. A production service for PTRANSP/TRANSP simulations is maintained at the Princeton Plasma Physics Laboratory; the server has a simple command line client interface and is subscribed to by about 100 researchers from tokamak projects in the US, Europe, and Asia. This service produced nearly 13000 PTRANSP/TRANSP simulations in the four year period FY 2005 through FY 2008. Major archives of TRANSP results are maintained at PPPL, MIT, General Atomics, and JET. Recent utilization, counting experimental analysis simulations as well as predictive simulations, more than doubled from slightly over 2000 simulations per year in FY 2005 and FY 2006 to over 4300 simulations per year in FY 2007 and FY 2008. PTRANSP predictive simulations applied to ITER increased eight fold from 30 simulations per year in FY 2005 and FY 2006 to 240 simulations per year in FY 2007 and FY 2008, accounting for more than half of combined PTRANSP/TRANSP service CPU resource …
Date: June 14, 2012
Creator: Kritz, Arnold H.
Object Type: Report
System: The UNT Digital Library
A Tri-Lab Programmatic Model for Nuclear Weapons Records Retention (open access)

A Tri-Lab Programmatic Model for Nuclear Weapons Records Retention

None
Date: February 14, 2013
Creator: Lownsbery, B; Shalles, S & Monson, R
Object Type: Report
System: The UNT Digital Library
Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility (open access)

Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.
Date: November 14, 2012
Creator: Dorr, Kent A.; Ostrom, Michael J. & Freeman-Pollard, Jhivaun R.
Object Type: Article
System: The UNT Digital Library
Lessons Learned and Potential Paths Forward in Virtual Reality Developments for the International Atomic Energy Agency (open access)

Lessons Learned and Potential Paths Forward in Virtual Reality Developments for the International Atomic Energy Agency

N/A
Date: July 14, 2013
Creator: Tackentien, J. K.; Owens, C. & Brown, B.
Object Type: Article
System: The UNT Digital Library
Wide-Field Astronomical Surveys in the Next Decade (open access)

Wide-Field Astronomical Surveys in the Next Decade

Wide-angle surveys have been an engine for new discoveries throughout the modern history of astronomy, and have been among the most highly cited and scientifically productive observing facilities in recent years. This trend is likely to continue over the next decade, as many of the most important questions in astrophysics are best tackled with massive surveys, often in synergy with each other and in tandem with the more traditional observatories. We argue that these surveys are most productive and have the greatest impact when the data from the surveys are made public in a timely manner. The rise of the 'survey astronomer' is a substantial change in the demographics of our field; one of the most important challenges of the next decade is to find ways to recognize the intellectual contributions of those who work on the infrastructure of surveys (hardware, software, survey planning and operations, and databases/data distribution), and to make career paths to allow them to thrive.
Date: November 14, 2011
Creator: Strauss, Michael A.; Tyson, J. Anthony; Anderson, Scott F.; Axelrod, T. S.; Becker, Andrew C.; Bickerton, Steven J. et al.
Object Type: Article
System: The UNT Digital Library
Large Synoptic Survey Telescope: From Science Drivers to Reference Design (open access)

Large Synoptic Survey Telescope: From Science Drivers to Reference Design

In the history of astronomy, major advances in our understanding of the Universe have come from dramatic improvements in our ability to accurately measure astronomical quantities. Aided by rapid progress in information technology, current sky surveys are changing the way we view and study the Universe. Next-generation surveys will maintain this revolutionary progress. We focus here on the most ambitious survey currently planned in the visible band, the Large Synoptic Survey Telescope (LSST). LSST will have unique survey capability in the faint time domain. The LSST design is driven by four main science themes: constraining dark energy and dark matter, taking an inventory of the Solar System, exploring the transient optical sky, and mapping the Milky Way. It will be a large, wide-field ground-based system designed to obtain multiple images covering the sky that is visible from Cerro Pachon in Northern Chile. The current baseline design, with an 8.4 m (6.5 m effective) primary mirror, a 9.6 deg{sup 2} field of view, and a 3,200 Megapixel camera, will allow about 10,000 square degrees of sky to be covered using pairs of 15-second exposures in two photometric bands every three nights on average. The system is designed to yield high image …
Date: October 14, 2011
Creator: Ivezic, Z.; Axelrod, T.; Brandt, W. N.; Burke, D. L.; Claver, C. F.; Connolly, A. et al.
Object Type: Article
System: The UNT Digital Library
SuperB Progress Report for Accelerator (open access)

SuperB Progress Report for Accelerator

This report details the progress made in by the SuperB Project in the area of the Collider since the publication of the SuperB Conceptual Design Report in 2007 and the Proceedings of SuperB Workshop VI in Valencia in 2008. With this document we propose a new electron positron colliding beam accelerator to be built in Italy to study flavor physics in the B-meson system at an energy of 10 GeV in the center-of-mass. This facility is called a high luminosity B-factory with a project name 'SuperB'. This project builds on a long history of successful e+e- colliders built around the world, as illustrated in Figure 1.1. The key advances in the design of this accelerator come from recent successes at the DAFNE collider at INFN in Frascati, Italy, at PEP-II at SLAC in California, USA, and at KEKB at KEK in Tsukuba Japan, and from new concepts in beam manipulation at the interaction region (IP) called 'crab waist'. This new collider comprises of two colliding beam rings, one at 4.2 GeV and one at 6.7 GeV, a common interaction region, a new injection system at full beam energies, and one of the two beams longitudinally polarized at the IP. Most …
Date: February 14, 2012
Creator: Biagini, M. E.; Boni, R.; Boscolo, M.; Buonomo, B.; Demma, T.; Drago, A. et al.
Object Type: Report
System: The UNT Digital Library