K-edge densitometer (KED) (open access)

K-edge densitometer (KED)

In 1979, a K-edge densitometer (KED) was installed by the Safeguards Assay group from Los Alamos National Laboratory in the PNC reprocessing plant at Tokai-mura, Japan. It uses an active nondestructive assay technique, KED, to measure the plutonium concentration of the product solution. The measurement uncertainty of an assay depends on the count time chosen, but can be 0.5% or better. The computer hardware and software were upgraded in 1992. This manual describes the operation of the instrument, with an emphasis on the user interface to the software.
Date: February 11, 1993
Creator: Sprinkle, J. K. & Hansen, W. J.
System: The UNT Digital Library
K-edge densitometer (KED). User manual (open access)

K-edge densitometer (KED). User manual

In 1979, a K-edge densitometer (KED) was installed by the Safeguards Assay group from Los Alamos National Laboratory in the PNC reprocessing plant at Tokai-mura, Japan. It uses an active nondestructive assay technique, KED, to measure the plutonium concentration of the product solution. The measurement uncertainty of an assay depends on the count time chosen, but can be 0.5% or better. The computer hardware and software were upgraded in 1992. This manual describes the operation of the instrument, with an emphasis on the user interface to the software.
Date: February 11, 1993
Creator: Sprinkle, J. K. & Hansen, W. J.
System: The UNT Digital Library
Uranium Mill Tailings Remedial Action (UMTRA) Surface Project: Project plan. Revision 1 (open access)

Uranium Mill Tailings Remedial Action (UMTRA) Surface Project: Project plan. Revision 1

The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) [Public Law (PL) 95-604, 42 United States Code (USC) 7901], hereinafter referred to as the ``Act,`` authorizes the US Department of Energy (DOE) to stabilize and control surface tailings and ground water contamination. To fulfill this mission, the DOE has established two projects under the Uranium Mill Tailings Remedial Action (UMTRA) Project Office. The Ground Water Project was established in April 1991 as a major project and a separate project plan will be prepared for that portion of the mission. This project plan covers the UMTRA Surface Project, a major system acquisition (MSA).
Date: August 11, 1993
Creator: unknown
System: The UNT Digital Library