Vadose Zone Transport Field Study: Status Report (open access)

Vadose Zone Transport Field Study: Status Report

Studies were initiated at the Hanford Site to evaluate the process controlling the transport of fluids in the vadose zone and to develop a reliable database upon which vadose-zone transport models can be calibrated. These models are needed to evaluate contaminant migration through the vadose zone to underlying groundwaters at Hanford. A study site that had previously been extensively characterized using geophysical monitoring techniques was selected in the 200 E Area. Techniques used previously included neutron probe for water content, spectral gamma logging for radionuclide tracers, and gamma scattering for wet bulk density. Building on the characterization efforts of the past 20 years, the site was instrumented to facilitate the comparison of nine vadose-zone characterization methods: advanced tensiometers, neutron probe, electrical resistance tomography (ERT), high-resolution resistivity (HRR), electromagnetic induction imaging (EMI), cross-borehole radar, and cross-borehole seismic.
Date: November 30, 2001
Creator: Gee, Glendon W. & Ward, Anderson L.
System: The UNT Digital Library
Vadose Zone Transport Field Study: Status Report (open access)

Vadose Zone Transport Field Study: Status Report

Studies were initiated at the Hanford Site to evaluate the process controlling the transport of fluids in the vadose zone and to develop a reliable database upon which vadose-zone transport models can be calibrated. These models are needed to evaluate contaminant migration through the vadose zone to underlying groundwaters at Hanford. A study site that had previously been extensively characterized using geophysical monitoring techniques was selected in the 200 E Area. Techniques used previously included neutron probe for water content, spectral gamma logging for radionuclide tracers, and gamma scattering for wet bulk density. Building on the characterization efforts of the past 20 years, the site was instrumented to facilitate the comparison of nine vadose-zone characterization methods: advanced tensiometers, neutron probe, electrical resistance tomography (ERT), high-resolution resistivity (HRR), electromagnetic induction imaging (EMI), cross-borehole radar (XBR), and cross-borehole seismic (XBS). Soil coring was used to obtain soil samples for analyzing ionic and isotopic tracers.
Date: November 30, 2001
Creator: Gee, Glendon W. & Ward, Anderson L.
System: The UNT Digital Library
Uncertainty Analysis Framework - Hanford Site-Wide Groundwater Flow and Transport Model (open access)

Uncertainty Analysis Framework - Hanford Site-Wide Groundwater Flow and Transport Model

Pacific Northwest National Laboratory (PNNL) embarked on a new initiative to strengthen the technical defensibility of the predictions being made with a site-wide groundwater flow and transport model at the U.S. Department of Energy Hanford Site in southeastern Washington State. In FY 2000, the focus of the initiative was on the characterization of major uncertainties in the current conceptual model that would affect model predictions. The long-term goals of the initiative are the development and implementation of an uncertainty estimation methodology in future assessments and analyses using the site-wide model. This report focuses on the development and implementation of an uncertainty analysis framework.
Date: November 9, 2001
Creator: Cole, Charles R.; Bergeron, Marcel P.; Murray, Christopher J.; Thorne, Paul D.; Wurstner, Signe K. & Rogers, Phillip M.
System: The UNT Digital Library
Uncertainty Analysis Framework - Hanford Site-Wide Groundwater Flow and Transport Model (open access)

Uncertainty Analysis Framework - Hanford Site-Wide Groundwater Flow and Transport Model

Pacific Northwest National Laboratory (PNNL) embarked on a new initiative to strengthen the technical defensibility of the predictions being made with a site-wide groundwater flow and transport model at the U.S. Department of Energy Hanford Site in southeastern Washington State. In FY 2000, the focus of the initiative was on the characterization of major uncertainties in the current conceptual model that would affect model predictions. The long-term goals of the initiative are the development and implementation of an uncertainty estimation methodology in future assessments and analyses using the site-wide model. This report focuses on the development and implementation of an uncertainty analysis framework.
Date: November 9, 2001
Creator: Cole, Charles R; Bergeron, Marcel P; Murray, Christopher J; Thorne, Paul D; Wurstner, Signe K & Rogers, Phillip M
System: The UNT Digital Library
Selection of Sampling Pumps Used for Groundwater Monitoring at the Hanford Site (open access)

Selection of Sampling Pumps Used for Groundwater Monitoring at the Hanford Site

The variable frequency drive centrifugal submersible pump, Redi-Flo2a made by Grundfosa, was selected for universal application for Hanford Site groundwater monitoring. Specifications for the selected pump and five other pumps were evaluated against current and future Hanford groundwater monitoring performance requirements, and the Redi-Flo2 was selected as the most versatile and applicable for the range of monitoring conditions. The Redi-Flo2 pump distinguished itself from the other pumps considered because of its wide range in output flow rate and its comparatively moderate maintenance and low capital costs. The Redi-Flo2 pump is able to purge a well at a high flow rate and then supply water for sampling at a low flow rate. Groundwater sampling using a low-volume-purging technique (e.g., low flow, minimal purge, no purge, or micropurges) is planned in the future, eliminating the need for the pump to supply a high-output flow rate. Under those conditions, the Well Wizard bladder pump, manufactured by QED Environmental Systems, Inc., may be the preferred pump because of the lower capital cost.
Date: November 5, 2001
Creator: Schalla, Ronald; Webber, William D & Smith, Ronald M
System: The UNT Digital Library
International Workshop of the Physics of Compressible Turbulent Mixing (open access)

International Workshop of the Physics of Compressible Turbulent Mixing

None
Date: November 28, 2001
Creator: Schilling, O
System: The UNT Digital Library
Limited Groundwater Investigation of The Atlas Corporation Moab Mill, Moab, Utah (open access)

Limited Groundwater Investigation of The Atlas Corporation Moab Mill, Moab, Utah

The project described in this report was conducted by personnel from Oak Ridge National Laboratory's Grand Junction Office (ORNL/GJ). The purpose was to refine information regarding groundwater contamination emanating from the Atlas Corporation's former uranium mill in Moab, Utah.
Date: November 5, 2001
Creator: Easterly, CE
System: The UNT Digital Library
Application of Advanced Reservoir Characterization, Simulation, and Production Optimization Strategies to Maximize Recovery in Slope and Basin Clastic Reservoirs, West Texas (Delaware Basin), Class III (open access)

Application of Advanced Reservoir Characterization, Simulation, and Production Optimization Strategies to Maximize Recovery in Slope and Basin Clastic Reservoirs, West Texas (Delaware Basin), Class III

The objective of this Class III project was demonstrate that reservoir characterization and enhanced oil recovery (EOR) by CO2 flood can increase production from slope and basin clastic reservoirs in sandstones of the Delaware Mountain Group in the Delaware Basin of West Texas and New Mexico. Phase 1 of the project, reservoir characterization, focused on Geraldine Ford and East Ford fields, which are Delaware Mountain Group fields that produce from the upper Bell Canyon Formation (Ramsey sandstone). The demonstration phase of the project was a CO2 flood conducted in East Ford field, which is operated by Orla Petco, Inc., as the East Ford unit.
Date: November 4, 2001
Creator: Dutton, Shirley P. & Flanders, William A.
System: The UNT Digital Library
Tailings Pile Seepage Model The Atlas Corporation Moab Mill Moab, Utah (open access)

Tailings Pile Seepage Model The Atlas Corporation Moab Mill Moab, Utah

The project described in this report was conducted by personnel from Oak Ridge National Laboratory's Grand Junction Office (ORNL/GJ). This report has been prepared as a companion report to the Limited Groundwater Investigation of the Atlas Corporation Moab Mill, Moab, Utah. The purpose of this report is to present the results of the tailings pile seepage modeling effort tasked by the U.S. Nuclear Regulatory Commission (NRC).
Date: November 5, 2001
Creator: Easterly, CE
System: The UNT Digital Library
Supplemental Modeling and Analysis Report, Atlas Corporation Moab Mill, Moab, Utah (open access)

Supplemental Modeling and Analysis Report, Atlas Corporation Moab Mill, Moab, Utah

The purpose of this report is to provide additional numerical modeling and data evaluation for the Atlas tailings pile near Moab, Utah. A previous report (Tailings Pile Seepage Model: The Atlas Corporation Moab Mill, Moab, Utah, January 9, 1998) prepared for the Nuclear Regulatory Commission (NRC) by Oak Ridge National Laboratory/Grand Junction (ORNL/GJ) presented the results of steady-state modeling of water flow and subsequent discharge to the underlying groundwater system. At the request of the Fish and Wildlife Service (FWS), this model was expanded to evaluate the impact of drainage from the tailings pile in addition to recharge from precipitation in a transient mode simulation. In addition, the FWS requested transient simulations of contaminant transport in the alluvial aquifer. Subsequently, NRC requested an evaluation of additional hydrologic issues related to the results presented in the Tailings Pile Seepage Model (ORNL/GJ 1998a) and the Limited Groundwater Investigation (ORNL/GJ 1998b). Funding for the report was provided by the U.S. Department of Energy. The following section lists the individual tasks with subsequent sections providing the results. A map for the Atlas Moab Mill site is presented in Fig. 1.1.
Date: November 5, 2001
Creator: Easterly, CE
System: The UNT Digital Library
Model Validation Status Review (open access)

Model Validation Status Review

The primary objective for the Model Validation Status Review was to perform a one-time evaluation of model validation associated with the analysis/model reports (AMRs) containing model input to total-system performance assessment (TSPA) for the Yucca Mountain site recommendation (SR). This review was performed in response to Corrective Action Request BSC-01-C-01 (Clark 2001, Krisha 2001) pursuant to Quality Assurance review findings of an adverse trend in model validation deficiency. The review findings in this report provide the following information which defines the extent of model validation deficiency and the corrective action needed: (1) AMRs that contain or support models are identified, and conversely, for each model the supporting documentation is identified. (2) The use for each model is determined based on whether the output is used directly for TSPA-SR, or for screening (exclusion) of features, events, and processes (FEPs), and the nature of the model output. (3) Two approaches are used to evaluate the extent to which the validation for each model is compliant with AP-3.10Q (Analyses and Models). The approaches differ in regard to whether model validation is achieved within individual AMRs as originally intended, or whether model validation could be readily achieved by incorporating information from other sources. (4) …
Date: November 28, 2001
Creator: Hardin, Ernest L.
System: The UNT Digital Library
Selection of Sampling Pumps Used for Groundwater Monitoring at the Hanford Site (open access)

Selection of Sampling Pumps Used for Groundwater Monitoring at the Hanford Site

The variable frequency drive centrifugal submersible pump, Redi-Flo2a made by Grundfosa, was selected for universal application for Hanford Site groundwater monitoring. Specifications for the selected pump and five other pumps were evaluated against current and future Hanford groundwater monitoring performance requirements, and the Redi-Flo2 was selected as the most versatile and applicable for the range of monitoring conditions. The Redi-Flo2 pump distinguished itself from the other pumps considered because of its wide range in output flow rate and its comparatively moderate maintenance and low capital costs. The Redi-Flo2 pump is able to purge a well at a high flow rate and then supply water for sampling at a low flow rate. Groundwater sampling using a low-volume-purging technique (e.g., low flow, minimal purge, no purge, or micropurgea) is planned in the future, eliminating the need for the pump to supply a high-output flow rate. Under those conditions, the Well Wizard bladder pump, manufactured by QED Environmental Systems, Inc., may be the preferred pump because of the lower capital cost.
Date: November 5, 2001
Creator: Schalla, Ronald; Webber, William D. & Smith, Ronald M.
System: The UNT Digital Library
Carbon Policy and Technical Change: Market Structure, Increasing Returns, and Secondary Benefits. Final Report (open access)

Carbon Policy and Technical Change: Market Structure, Increasing Returns, and Secondary Benefits. Final Report

An economic evaluation of the impact of policies intended to control emissions of CO{sub 2} and other ''greenhouse gases'' (GHGS) depends on the net costs of these controls and their distribution throughout the production sectors of developed and developing economics. The answers derived from appraisals of these net costs, in turn, stem from what is assumed about the timing of the controls, the pace of technological change, and any short-term secondary benefits from their control. There have only been a few serious attempts to estimate the economic benefits from the policies associated with such long run outcomes. All of the approaches to date have made fairly strong assumptions or relied on contingent valuation estimates of hypothetical situations.
Date: November 19, 2001
Creator: Peretto, P. & Smith, V. K.
System: The UNT Digital Library
High Temperature Materials Laboratory Thirteenth Annual Report: October 1999 Through September 2000 (open access)

High Temperature Materials Laboratory Thirteenth Annual Report: October 1999 Through September 2000

The High Temperature Materials Laboratory (HTML) User Program continued to work with industrial, academic, and governmental users this year, accepting 86 new projects and developing 50 new user agreements. The table on the following page presents the breakdown of these statistics. The figure on page 2 depicts the continued growth in user agreements and user projects. You may note that our total number of proposals is nearing 1000, and we expect to achieve this number in our first proposal review meeting of FY 2001. The large number of new agreements bodes well for the future. A list of proposals to the HTML follows this section; at the end of the report, we present a list of agreements between HTML and universities and industries, broken down by state. Program highlights this year included several outstanding user projects (some of which are discussed in later sections), the annual meeting of the HTML Programs Senior Advisory Committee, the completion of a formal Multiyear Program Plan (MYPP), and finalization of a purchase agreement with JEOL for a new-generation electron microscope.
Date: November 7, 2001
Creator: Pasto, AE
System: The UNT Digital Library
CSEWG SYMPOSIUM, A CSWEG RETROSPECTIVE. 35TH ANNIVERSARY CROSS SECTION EVALUATION WORKING GROUP, NOV. 5, 2001, BROOKHAVEN NATIONAL LABORATORY. (open access)

CSEWG SYMPOSIUM, A CSWEG RETROSPECTIVE. 35TH ANNIVERSARY CROSS SECTION EVALUATION WORKING GROUP, NOV. 5, 2001, BROOKHAVEN NATIONAL LABORATORY.

This publication has been prepared to record some of the history of the Cross Section Evaluation Working Group (CSEWG). CSEWG is responsible for creating the evaluated nuclear data file (ENDF/B) which is widely used by scientists and engineers who are involved in the development and maintenance of applied nuclear technologies. This organization has become the model for the development of nuclear data libraries throughout the world. The data format (ENDF) has been adopted as the international standard. On November 5, 2001, a symposium was held at Brookhaven National Laboratory to celebrate the 50 th meeting of the CSEWG organization and the 35 th anniversary of its first meeting in November 1966. The papers presented in this volume were prepared by present and former CSEWG members for presentation at the November 2001 symposium. All but two of the presentations are included. I have included an appendix to list all of the CSEWG members and their affiliations, which has been compiled from the minutes of each of the CSEWG meetings. Minutes exist for all meetings except the 4 th meeting held in January 1968. The list includes 348 individuals from 71 organizations. The dates for each of the 50 CSEWG meetings are …
Date: November 5, 2001
Creator: DUNFORD, C.; HOLDEN, N. & PEARLSTEIN, S.
System: The UNT Digital Library
CSEWG SYMPOSIUM, A CSWEG RETROSPECTIVE. 35TH ANNIVERSARY CROSS SECTION EVALUATION WORKING GROUP, NOV. 5, 2001, BROOKHAVEN NATIONAL LABORATORY. (open access)

CSEWG SYMPOSIUM, A CSWEG RETROSPECTIVE. 35TH ANNIVERSARY CROSS SECTION EVALUATION WORKING GROUP, NOV. 5, 2001, BROOKHAVEN NATIONAL LABORATORY.

None
Date: November 5, 2001
Creator: Dunford, C.; Holden, N. & Pearlstein, S.
System: The UNT Digital Library
The KFM, A Homemade Yet Accurate and Dependable Fallout Meter (open access)

The KFM, A Homemade Yet Accurate and Dependable Fallout Meter

The KFM is a homemade fallout meter that can be made using only materials, tools, and skills found in millions of American homes. It is an accurate and dependable electroscope-capacitor. The KFM, in conjunction with its attached table and a watch, is designed for use as a rate meter. Its attached table relates observed differences in the separations of its two leaves (before and after exposures at the listed time intervals) to the dose rates during exposures of these time intervals. In this manner dose rates from 30 mR/hr up to 43 R/hr can be determined with an accuracy of {+-}25%. A KFM can be charged with any one of the three expedient electrostatic charging devices described. Due to the use of anhydrite (made by heating gypsum from wallboard) inside a KFM and the expedient ''dry-bucket'' in which it can be charged when the air is very humid, this instrument always can be charged and used to obtain accurate measurements of gamma radiation no matter how high the relative humidity. The heart of this report is the step-by-step illustrated instructions for making and using a KFM. These instructions have been improved after each successive field test. The majority of the …
Date: November 20, 2001
Creator: Kearny, C. H.
System: The UNT Digital Library
Bibliography of Work on the Heterogeneous Photocatalytic Removal of Hazardous Compounds from Water and Air--Update Number 4 to October 2001 (open access)

Bibliography of Work on the Heterogeneous Photocatalytic Removal of Hazardous Compounds from Water and Air--Update Number 4 to October 2001

This report is the fifth in a series of bibliographies of work on the photocatalytic oxidation of organic or inorganic compounds in air or water and on the photocatalytic reduction of inorganic compounds in water. This search contains information extracted from 1149 new references to papers, books, and reports from searches conducted between October 1996 and April 2001.
Date: November 19, 2001
Creator: Blake, D.
System: The UNT Digital Library