Resource Type

Field Demonstrations of Logging Technologies for Reservoir Characterization (open access)

Field Demonstrations of Logging Technologies for Reservoir Characterization

None
Date: February 3, 1999
Creator: Fowler, M.L.; Johnson, W.I.; Safley, L.E.; Schatzinger, R.A.; Sharma, B. & Szpakiewicz, M.J.
System: The UNT Digital Library
System design description PFP thermal stabilization (open access)

System design description PFP thermal stabilization

The purpose of this document is to provide a system design description and design basis for the Plutonium Finishing Plant (PFP) Thermal Stabilization project. The sources of material for this project are residues scraped from glovebox floors and materials already stored in vault storage that need further stabilizing. Stabilizing this material will promote long term storage and reduced worker exposure. This document addresses: functional design, equipment, and safety requirements for thermal stabilization of plutonium residues and oxides.
Date: February 23, 1999
Creator: LARKIN, K.A.
System: The UNT Digital Library
Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado (open access)

Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE`s deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.
Date: February 1, 1999
Creator: unknown
System: The UNT Digital Library
Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, NM (open access)

Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, NM

The Nash Draw Brushy Canyon Pool in Eddy County New Mexico is a cost-shared field demonstration project in the US Department of Energy Class II Program. A major goal of the Class III Program is to stimulate the use of advanced technologies to increase ultimate recovery from slope-basin clastic reservoirs. Advanced characterization techniques are being used at the Nash Draw project to develop reservoir management strategies for optimizing oil recovery from this Delaware reservoir. Analysis, interpretation, and integration of recently acquired geologic, geophysical, and engineering data revealed that the initial reservoir characterization was too simplistic to capture the critical features of this complex formation. Contrary to the initial characterization, a new reservoir description evolved that provided sufficient detail regarding the complexity of the Brushy Canyon interval at Nash Draw. This new reservoir description is being used as a risk reduction tool to identify ''sweet spots'' for a development drilling program as well as to evaluate pressure maintenance strategies. The reservoir characterization, geological modeling, 3-D seismic interpretation, and simulation studies have provided a detailed model of the Brushy Canyon zones. This model was used to predict the success of different reservoir management scenarios and to aid in determining the most favorable …
Date: February 24, 1999
Creator: Murphy, Mark B.
System: The UNT Digital Library
Annual Report Procurement and Logistics Management Center Sandia National Laboratories Fiscal Year 1998 (open access)

Annual Report Procurement and Logistics Management Center Sandia National Laboratories Fiscal Year 1998

None
Date: February 1, 1999
Creator: Palmer, D. L.
System: The UNT Digital Library
Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments (open access)

Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).
Date: February 1, 1999
Creator: unknown
System: The UNT Digital Library
Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final (open access)

Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.
Date: February 1, 1999
Creator: unknown
System: The UNT Digital Library