Resource Type

Serial/Series Title

Precombustion removal of hazardous air pollutant precursors. Second quarterly technical progress report, January 1, 1996--March 31, 1996 (open access)

Precombustion removal of hazardous air pollutant precursors. Second quarterly technical progress report, January 1, 1996--March 31, 1996

This project involves the development of an optimized, bench-scale processing circuit capable of efficiently removing trace elements from run-of-mine coals. The optimized circuit will be developed using characterization data obtained from detailed washability studies and release analyses tests conducted with several eastern US coals. The optimized circuit will incorporate a variety of conventional and advanced coal cleaning processes which are believed to be the most cost-effective and commercially viable. The coal products from the optimized circuit will be further treated with complexing agents specifically designed to extract organometallic trace elements that are difficult to remove by physical cleaning operations. Finally, innovative bioremediation schemes will be investigated as a means of controlling the release of trace elements from the process waste streams. Emphasis has been placed on the development of a processing circuit which (i) maximizes the rejection of trace elements, (ii) minimizes the production of coal fines which are costly to process and less marketable, and (iii) minimizes the downstream impacts of the process waste streams on the environment. During the past quarter, the project work plan and all associated technical/management reports were successfully approved by the COR (Subtask 1.1--Work Plan Development). Test work is now actively moving forward on …
Date: April 30, 1996
Creator: unknown
System: The UNT Digital Library
Design requirements document for the phase one privitization facility electrical power (open access)

Design requirements document for the phase one privitization facility electrical power

None
Date: September 30, 1996
Creator: Singh, G.
System: The UNT Digital Library
Phase I privatization, site development, and roads design requirements document (open access)

Phase I privatization, site development, and roads design requirements document

To prepare for the privatization contractor development of their assigned sites, roads and rail system must be extended from the existing area network systems. Various road and rail modification alternatives were investigated through an engineering study, @C-SD-TWR-ES- 004, with the preferred transportation corridors identified. Various Site development alternatives were also investigated, WHC-SD-TWR-ES-003. The preferred alternative, as discussed herein, will: 1. Establish boundaries and set monuments for the two PC sites. All work within each designated site will be by the PC. 2. Assure that the systems to serve each site - Roads and Rail System Modifications, Raw and Potable Water Service, Liquid Effluent Transfer Systems and Electric Power- are integrated with each other to best serve the sites. 3. Identify the corridors for Low Activity Waste (LAW) feed lines from the existing AP Tank Farm to the PC sites. Site development project will prepare these corridors for construction ofthe feed lines by the PC. Ifrequired, these corridors would include room for the optional High Level Waste (HLW) feed line. 4. Perform necessary site earthwork and grading outside of the PC sites. 1.3 DOCUMENT OVERVIEW This DRD will list the documents that will form the basis for design and construction of …
Date: September 30, 1996
Creator: Parazin, R.J.
System: The UNT Digital Library
Phase I privatization - raw and potable water design requirements document (open access)

Phase I privatization - raw and potable water design requirements document

The U.S. Department of Energy has chosen to accomplish the Tank Waste Remediation System disposal mission via privatization. The disposal mission has been divided into two phases. Phase I, a `proof of concept` phase, will establish and demonstrate the technical, commercial, and procurement capabilities necessary for privatization to proceed. Once established on this relatively small scale, privatization will be expanded, through a second competition, in the form of a second phase (Phase II) to dispose of the remainder of the tank waste. The Phase I privatization site will be located in the former Grout Disposal Site area. To prepare the site for use for the private contractors, utilities must be extended from the 200 East Area infrastructure. This document describes the design requirements for the prime water services; i.e raw, fire suppression and sanitary (potable) to be provided to the private contractors. These requirements will be used in directing the conceptual design of these proposed water services.
Date: September 30, 1996
Creator: Parazin, R.J.
System: The UNT Digital Library
Quarterly Progress Report on the Biological Monitoring Program for East Fork Poplar Creek (open access)

Quarterly Progress Report on the Biological Monitoring Program for East Fork Poplar Creek

In May 1985, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge Y-12 Plant. As a condition of the permit, a Biological Monitoring and Abatement Program ( BMAP) was developed to demonstrate that the effluent limitations established for the Y-12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek; EFPC), in particular, the growth and propagation of aquatic life (Lear et al. 1989). A second objective of the BMAP is to document the ecological effects resulting from the implementation of a water pollution control program designed to eliminate direct discharges of wastewaters to EFPC and to minimize the inadvertent release of pollutants to the environment. Because of the complex nature of the discharges to EFPC and the temporal and spatial variability in the composition of the discharges, a comprehensive, integrated approach to biological monitoring was developed. A new permit was issued to the Y-12 Plant on April 28, 1995 and became effective on July 1, 1995. Biological monitoring continues to be required under the new permit. The BMAP consists of four major tasks that reflect different but complementary approaches to evaluating the effects of the Y-12 Plant discharges on the aquatic …
Date: December 30, 1996
Creator: Adams, S.M.; Ashwood, T.L.; Cicerone, D.S.; Greeley, M.S., Jr.; Hill, W.R. & Kszos, L.A.
System: The UNT Digital Library
Differential sensitivity of aerobic gram-positive and gram-negative microorganisms to 2,4,6-trinitrotoluene (TNT) leads to dissimilar growth and TNT transformation: Results of soil and pure culture studies (open access)

Differential sensitivity of aerobic gram-positive and gram-negative microorganisms to 2,4,6-trinitrotoluene (TNT) leads to dissimilar growth and TNT transformation: Results of soil and pure culture studies

The effects of 2,4,6-trinitrotoluene (TNT) on indigenous soil populations and pure bacterial cultures were examined. The number of colony-forming units (CFU) appearing when TNT-contaminated soil was spread on 0.3% molasses plates decreased by 50% when the agar was amended with 67 {mu}g TNT mL{sup -1}, whereas a 99% reduction was observed when uncontaminated soil was plated. Furthermore, TNT-contaminated soil harbored a greater number of organisms able to grow on plates amended with greater than 10 {mu}g TNT mL{sup -1}. The percentage of gram-positive isolates was markedly less in TNT-contaminated soil (7%; 2 of 30) than in uncontaminated soil (61%; 20 of 33). Pseudomonas aeruginosa, Pseudomonas corrugate, Pseudomonasfluorescens and Alcaligenes xylosoxidans made up the majority of the gram-negative isolates from TNT-contaminated soil. Gram-positive isolates from both soils demonstrated marked growth inhibition when greater than 8-16 {mu}g TNT mL{sup -1} was present in the culture media. Most pure cultures of known aerobic gram-negative organisms readily degraded TNT and evidenced net consumption of reduced metabolites. However, pure cultures of aerobic gram-positive bacteria were sensitive to relatively low concentrations of TNT as indicated by the 50% reduction in growth and TNT transformation which was observed at approximately 10 {mu}g TNT mL{sup -1}. Most non-sporeforming …
Date: July 30, 1996
Creator: Fuller, M.E. & Manning, J.F. Jr.
System: The UNT Digital Library
Rocketdyne Division annual site environmental report Santa Susana Field Laboratory and Desoto sites 1995 (open access)

Rocketdyne Division annual site environmental report Santa Susana Field Laboratory and Desoto sites 1995

This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by the Rocketdyne Division of Rockwell International Corporation (Rocketdyne). These are identified as the Santa Susana Field Laboratory (SSFL) and the DeSoto site. The sites have been used for manufacturing, R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The DeSoto site essentially comprises office space and light industry with no remaining radiological operations, and has little potential impact on the environment. The SSFL site, because of its large size (2,668 acres), warrants comprehensive monitoring to assure protection of the environment. SSFL consists of four administrative areas used for research, development, and test operations as well as a buffer zone. A portion of Area I and all of Area II are owned by the U.S. Government and assigned to the National Aeronautics and Space Administration (NASA). A portion of Area IV is under option for purchase by the Department of Energy (DOE).
Date: July 30, 1996
Creator: unknown
System: The UNT Digital Library
FY96 Support to the Defense Information Systems Agency (DISA), Center for Standards (CFS) for continuing improvement of the DoD HCI Style Guide. Final report (open access)

FY96 Support to the Defense Information Systems Agency (DISA), Center for Standards (CFS) for continuing improvement of the DoD HCI Style Guide. Final report

PNNL successfully completed the three tasks: Task 1 - This task provided DISA with an updated set of design checklists that can be used to measure compliance with the Style Guide. These checklists are in Microsoft{reg_sign}Word 6.0 format. Task 2 - This task provided a discussion of two basic models for using the Style Guide and the Design Checklist, as a compliance tool and as a design tool.
Date: September 30, 1996
Creator: Avery, L.W.; Donohoo, D.T.; Sanchez, J.A. & Gellert, D.A.
System: The UNT Digital Library
Human subjects research handbook: Protecting human research subjects. Second edition (open access)

Human subjects research handbook: Protecting human research subjects. Second edition

This handbook serves as a guide to understanding and implementing the Federal regulations and US DOE Orders established to protect human research subjects. Material in this handbook is directed towards new and continuing institutional review board (IRB) members, researchers, institutional administrators, DOE officials, and others who may be involved or interested in human subjects research. It offers comprehensive overview of the various requirements, procedures, and issues relating to human subject research today.
Date: January 30, 1996
Creator: unknown