Resource Type

Serial/Series Title

Remediation plan for Well 399-1-16C (open access)

Remediation plan for Well 399-1-16C

The purpose of this plan is to determine hydraulic conditions at Well 399-1-16C (16C) and to present a remediation plan. The objectives are to restore hydraulic isolation of the confined aquifer (water level returning to approximately 370 ft) and to prevent chemical contamination between the unconfined and confined aquifers. This work scope is an extension of Task 4d of the Remedial Investigation/Feasibility Study Work Plan for the 300-FF-5 Operable Unit, Hanford Site, Richland, Washington, DOE/RL 89-14 (1990), and is a result of discussions held with the regulators and documented this plan was presented to the regulators at the January 1993 unit managers meeting and is documented in the minutes from that meeting.
Date: June 25, 1993
Creator: Hulstrom, L. C.
System: The UNT Digital Library
Electric power monthly, May 1993 (open access)

Electric power monthly, May 1993

The Electric Power Monthly (EPM) is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.
Date: May 25, 1993
Creator: unknown
System: The UNT Digital Library