1 Matching Results
Results open in a new window/tab. Unexpected Results? Search the Catalog Instead.
Results:
1 - 1 of
1
Engineering report (conceptual design) PFP solution stabilization
This Engineering Report (Conceptual Design) addresses remediation of the plutonium-bearing solutions currently in inventory at the Plutonium Finishing Plant (PFP). The recommendation from the Environmental Impact Statement (EIS) is that the solutions be treated thermally and stabilized as a solid for long term storage. For solutions which are not discardable, the baseline plan is to utilize a denitration process to stabilize the solutions prior to packaging for storage.
Date:
July 17, 1997
Creator:
Witt, J. B.
System:
The UNT Digital Library