Resource Type

[Dynamic enhanced recovery technologies]. Quarterly technical report, August 1992--October 1993 (open access)

[Dynamic enhanced recovery technologies]. Quarterly technical report, August 1992--October 1993

This paper has presented the investigation of the mechanism of geopressure occurrence, the transition of elastic properties from the hydrostatic pressured formation to the geopressured formation, and finally, a novel seismic amplitude analysis technique to map the top-of-geopresure surface. The successful application of our new technique to the Pleistocene, offshore Louisiana, Gulf of Mexico has again demonstrated that seismic attributes analyses are of importantance in the hydrocarbon exploration. There are three parts in this paper corresponding to the above discussed topics: Part I discusses mechanisms of geopressuring, and the effects of changing porosity, pressure, and fluid saturation on the elastic properties; Part II investigates the controlling factors in the geopressure transition zone, their seismic responses, and theoretical derivations of our new prediction method; and Part III demonstrates the application of the proposed method to the Pleistocene, Offshore Louisiana, Gulf of Mexico, the prediction discrpepancy between the seismic predicted top-of-geopressure and that dericed from 145 well logs, and finally, the importance of this hydrodynamic surface.
Date: October 15, 1993
Creator: Anderson, R. N.
System: The UNT Digital Library
Cost estimates for near-term depolyment of advanced traffic management systems. Final report (open access)

Cost estimates for near-term depolyment of advanced traffic management systems. Final report

The objective of this study is to provide cost est engineering, design, installation, operation and maintenance of Advanced Traffic Management Systems (ATMS) in the largest 75 metropolitan areas in the United States. This report gives estimates for deployment costs for ATMS in the next five years, subject to the qualifications and caveats set out in following paragraphs. The report considers infrastructure components required to realize fully a functional ATMS over each of two highway networks (as discussed in the Section describing our general assumptions) under each of the four architectures identified in the MITRE Intelligent Vehicle Highway Systems (IVHS) Architecture studies. The architectures are summarized in this report in Table 2. Estimates are given for eight combinations of highway networks and architectures. We estimate that it will cost between $8.5 Billion (minimal network) and $26 Billion (augmented network) to proceed immediately with deployment of ATMS in the largest 75 metropolitan areas. Costs are given in 1992 dollars, and are not adjusted for future inflation. Our estimates are based partially on completed project costs, which have been adjusted to 1992 dollars. We assume that a particular architecture will be chosen; projected costs are broken by architecture.
Date: February 15, 1993
Creator: Stevens, S. S. & Chin, S. M.
System: The UNT Digital Library