Stem Cell Research: Federal Research Funding and Oversight (open access)

Stem Cell Research: Federal Research Funding and Oversight

None
Date: March 13, 2009
Creator: unknown
System: The UNT Digital Library
Federalism Issues in Surface Transportation Policy: Past and Present (open access)

Federalism Issues in Surface Transportation Policy: Past and Present

This report provides an historical perspective on contemporary federalism issues in surface transportation policy that are likely to be addressed by Congress during the 111th Congress, including possible devolution of programmatic responsibility to states and proposals to change state maintenance-of-effort requirements and state cost matching requirements.
Date: March 13, 2009
Creator: Dilger, Robert J.
System: The UNT Digital Library
Aviation Security: TSA Has Completed Key Activities Associated with Implementing Secure Flight, but Additional Actions Are Needed to Mitigate Risks (open access)

Aviation Security: TSA Has Completed Key Activities Associated with Implementing Secure Flight, but Additional Actions Are Needed to Mitigate Risks

A letter report issued by the Government Accountability Office with an abstract that begins "To enhance aviation security, the Department of Homeland Security's (DHS) Transportation Security Administration (TSA) developed a program--known as Secure Flight--to assume from air carriers the function of matching passenger information against terrorist watch-list records. In accordance with a mandate in the Department of Homeland Security Appropriations Act, 2008, GAO's objective was to assess the extent to which TSA met the requirements of 10 statutory conditions related to the development of the Secure Flight program. GAO is required to review the program until all 10 conditions are met. In September 2008, DHS certified that it had satisfied all 10 conditions. To address this objective, GAO (1) identified key activities related to each of the 10 conditions; (2) identified federal guidance and best practices that are relevant to successfully meeting each condition; (3) analyzed whether TSA had demonstrated, through program documentation and oral explanation, that the guidance was followed and best practices were met; and (4) assessed the risks associated with not fully following applicable guidance and meeting best practices."
Date: May 13, 2009
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
2010 Census: Census Bureau Has Made Progress on Schedule and Operational Control Tools, but Needs to Prioritize Remaining System Requirements (open access)

2010 Census: Census Bureau Has Made Progress on Schedule and Operational Control Tools, but Needs to Prioritize Remaining System Requirements

A letter report issued by the Government Accountability Office with an abstract that begins "To carry out the decennial census, the U.S. Census Bureau (Bureau) conducts a sequence of thousands of activities and numerous operations. As requested, The Government Accountability Office (GAO) examined (1) the Bureau's use of scheduling tools to maintain and monitor progress and (2) the status of two systems key to field data collection: the control system the Bureau will use to manage the work flow for paper-based operations, including nonresponse follow-up, and the system used to manage quality control of two major field operations. GAO applied schedule analysis tools; reviewed Bureau evaluations, planning documents, and other documents on work flow management; and interviewed Bureau officials."
Date: November 13, 2009
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Characterization and Leach Testing for PUREX Cladding Waste Sludge (Group 3) and REDOX Cladding Waste Sludge (Group 4) Actual Waste Sample Composites (open access)

Characterization and Leach Testing for PUREX Cladding Waste Sludge (Group 3) and REDOX Cladding Waste Sludge (Group 4) Actual Waste Sample Composites

A testing program evaluating actual tank waste was developed in response to Task 4 from the M-12 External Flowsheet Review Team (EFRT) issue response plan.(a) The testing program was subdivided into logical increments. The bulk water-insoluble solid wastes that are anticipated to be delivered to the Waste Treatment and Immobilization Plant (WTP) were identified according to type such that the actual waste testing could be targeted to the relevant categories. Eight broad waste groupings were defined. Samples available from the 222S archive were identified and obtained for testing. The actual wastetesting program included homogenizing the samples by group, characterizing the solids and aqueous phases, and performing parametric leaching tests. Two of the eight defined groups—plutonium-uranium extraction (PUREX) cladding waste sludge (Group 3, or CWP) and reduction-oxidation (REDOX) cladding waste sludge (Group 4, or CWR)—are the subjects of this report. Both the Group 3 and 4 waste composites were anticipated to be high in gibbsite, requiring caustic leaching. Characterization of the composite Group 3 and Group 4 waste samples confirmed them to be high in gibbsite. The focus of the Group 3 and 4 testing was on determining the behavior of gibbsite during caustic leaching. The waste-type definition, archived sample conditions, …
Date: February 13, 2009
Creator: Snow, Lanee A.; Buck, Edgar C.; Casella, Amanda J.; Crum, Jarrod V.; Daniel, Richard C.; Draper, Kathryn E. et al.