N-Reactor Department monthly report, August 1963 (open access)

N-Reactor Department monthly report, August 1963

This report details activities of the N-Reactor Department during the month of August 1963.
Date: September 9, 1963
Creator: unknown
System: The UNT Digital Library
Federal Mandatory Minimum Sentencing Statutes (open access)

Federal Mandatory Minimum Sentencing Statutes

This report discusses the federal mandatory minimum sentencing statutes, that limits the discretion of a sentencing court to impose a sentence that does not include a term of imprisonment or the death penalty. The United States Sentencing Commission's Mandatory Minimum Penalties in the Federal Criminal Justice System (2011) recommends consideration of amendments to several of the statutes under which federal mandatory minimum sentences are most often imposed.
Date: September 9, 2013
Creator: Doyle, Charles
System: The UNT Digital Library
DWPF SB6 INITIAL CPC FLOWSHEET TESTING SB6-1 TO SB6-4L TESTS OF SB6-A AND SB6-B SIMULANTS (open access)

DWPF SB6 INITIAL CPC FLOWSHEET TESTING SB6-1 TO SB6-4L TESTS OF SB6-A AND SB6-B SIMULANTS

The Defense Waste Processing Facility (DWPF) will transition from Sludge Batch 5 (SB5) processing to Sludge Batch 6 (SB6) processing in late fiscal year 2010. Tests were conducted using non-radioactive simulants of the expected SB6 composition to determine the impact of varying the acid stoichiometry during the Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) processes. The work was conducted to meet the Technical Task Request (TTR) HLW/DWPF/TTR-2008-0043, Rev.0 and followed the guidelines of a Task Technical and Quality Assurance Plan (TT&QAP). The flowsheet studies are performed to evaluate the potential chemical processing issues, hydrogen generation rates, and process slurry rheological properties as a function of acid stoichiometry. These studies were conducted with the estimated SB6 composition at the time of the study. This composition assumed a blend of 101,085 kg of Tank 4 insoluble solids and 179,000 kg of Tank 12 insoluble solids. The current plans are to subject Tank 12 sludge to aluminum dissolution. Liquid Waste Operations assumed that 75% of the aluminum would be dissolved during this process. After dissolution and blending of Tank 4 sludge slurry, plans included washing the contents of Tank 51 to {approx}1M Na. After the completion of washing, the …
Date: September 9, 2009
Creator: Lambert, D.; Pickenheim, B. & Best, D.
System: The UNT Digital Library