Resource Type

Reaching Grid Parity Using BP Solar Crystalline Silicon Technology: A Systems Class Application (open access)

Reaching Grid Parity Using BP Solar Crystalline Silicon Technology: A Systems Class Application

The primary target market for this program was the residential and commercial PV markets, drawing on BP Solar's premium product and service offerings, brand and marketing strength, and unique routes to market. These two markets were chosen because: (1) in 2005 they represented more than 50% of the overall US PV market; (2) they are the two markets that will likely meet grid parity first; and (3) they are the two market segments in which product development can lead to the added value necessary to generate market growth before reaching grid parity. Federal investment in this program resulted in substantial progress toward the DOE TPP target, providing significant advancements in the following areas: (1) Lower component costs particularly the modules and inverters. (2) Increased availability and lower cost of silicon feedstock. (3) Product specifically developed for residential and commercial applications. (4) Reducing the cost of installation through optimization of the products. (5) Increased value of electricity in mid-term to drive volume increases, via the green grid technology. (6) Large scale manufacture of PV products in the US, generating increased US employment in manufacturing and installation. To achieve these goals BP Solar assembled a team that included suppliers of critical materials, …
Date: December 6, 2010
Creator: Cunningham, Daniel W.; Wohlgemuth, John; Carlson, David E.; Clark, Roger F.; Gleaton, Mark; Posbic, John P. et al.
System: The UNT Digital Library
Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2012 at Rulison, Colorado (open access)

Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2012 at Rulison, Colorado

The U.S. Department of Energy (DOE) Office of Legacy Management conducted annual sampling at the Rulison, Colorado, site for the Long-Term Hydrologic Monitoring Program (LTHMP) on May 8, 2012. The samples were shipped to GEL Laboratories in Charleston, South Carolina, for analysis. All requested analyses were successfully completed. Samples were analyzed for gamma-emitting radionuclides by high-resolution gamma spectrometry; tritium was analyzed using two methods. The conventional tritium method has a detection limit on the order of 400 pCi/L, and a select set of samples was analyzed for tritium using the enriched method, which has a detection limit on the order of 3 pCi/L.
Date: December 6, 2012
Creator: unknown
System: The UNT Digital Library